X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515052408000

Well Details

Well ID: 0515052408000
Loading map...
Location: 00/08-24-051-05W5/0
Location Alias: 00/08-24-51-05 W5M
Location Alias 2: 00/08-24-051-05 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 05
Section: 24
County/Municipality: Parkland County
Well Name: APEX ET AL HIGHVALE 8-24-51-5
Operator Name: Highvale Operating Corp.
License Number: 0139166
License Date: 1989-03-08
License Status: Abandoned
Spud Date: 1989-03-12
Final Drill Date: 1989-03-19
Well Total Depth: 1161.00 m
Surface Hole Latitude: 53.415901
Surface Hole Longitude: -114.592469

For data sources see[1][2]

Well History

Date Event
1989-03-08 Obtained License
1989-03-12 Lost Circulation Occurred
1989-03-13 Surface Casing Operation Performed
1989-03-19 Finished Drilling
1989-03-19 Well Log Performed
1989-03-20 Production Casing Operation Performed
1989-03-20 Rig Released
1989-03-20 Well Mode changed to Drilled and Cased
1990-01-17 Well Log Performed
1990-01-18 Perforation Treatment Performed - Jet Perforation
1990-01-18 Well Log Performed
1990-01-19 Perforation Treatment Performed - Remedial Casing
1990-01-21 Perforation Treatment Performed - Jet Perforation
1990-01-21 Well Log Performed
1990-01-24 Perforation Treatment Performed - Fractured
1990-02-02 Well Began Production
1990-02-02 Well Fluid changed to Crude Oil
1990-02-02 Well Mode changed to Pumping
1992-02-27 Well Fluid changed to Crude Oil
1992-02-27 Well Mode changed to Suspended
1994-01-20 Well Fluid changed to Crude Oil
1994-01-20 Well Mode changed to Pumping
1994-03-15 Well Fluid changed to Crude Oil
1994-03-15 Well Mode changed to Suspended
1994-12-22 Well Fluid changed to Crude Oil
1994-12-22 Well Mode changed to Pumping
1995-03-12 Well Fluid changed to Crude Oil
1995-03-12 Well Mode changed to Suspended
1995-12-28 Well Fluid changed to Crude Oil
1995-12-28 Well Mode changed to Pumping
1996-03-13 Well Fluid changed to Crude Oil
1996-03-13 Well Mode changed to Suspended
1996-12-10 Well Fluid changed to Crude Oil
1996-12-10 Well Mode changed to Pumping
1998-03-31 Well Fluid changed to Crude Oil
1998-03-31 Well Mode changed to Suspended
2004-03-12 Well Fluid changed to Crude Oil
2004-03-12 Well Mode changed to Pumping
2005-09-01 Well Fluid changed to Crude Oil
2005-09-01 Well Mode changed to Suspended
2007-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-17 Plug Back Performed
2007-02-17 Well Fluid changed to Crude Oil
2007-02-17 Well Mode changed to Abandoned Zone
2007-03-19 Well Abandoned
2007-03-19 Well Fluid changed to Crude Oil
2007-03-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-18 Perforation 334.00 335.00 13
1990-01-19 Remedial Casing Cementing 334.00 335.00 0
1990-01-21 Perforation 1106.20 1108.00 14
1990-01-24 Fracture 1106.20 1108.00 0
2007-02-17 Packing Device Capped w/Cement 1087.00 1095.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 778 0.0 0.0 0.0
1991 1702 0.0 0.0 0.0
1992 1173 0.0 0.0 0.0
1994 1432 0.0 0.0 0.0
1995 1774 0.0 0.0 0.0
1996 1890 0.0 0.0 0.0
1997 1804 0.0 0.0 0.0
1998 1512 0.0 0.0 0.0
2004 168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-03-12 Lost Circulation 70.00 202.00

For data sources see[6]

References