X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515080510000

Well Details

Well ID: 0515080510000
Loading map...
Location: 00/10-05-051-08W5/0
Location Alias: 00/10-05-51-08 W5M
Location Alias 2: 00/10-05-051-08 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 08
Section: 05
County/Municipality: Yellowhead County
Well Name: ANDERSON PEMBINA 10-5-51-8
Operator Name: Scollard Energy Ltd.
License Number: 0164806
License Date: 1994-02-07
License Status: Suspension
Spud Date: 1994-03-11
Final Drill Date: 1994-03-20
Well Total Depth: 1907.00 m
Surface Hole Latitude: 53.376943
Surface Hole Longitude: -115.137651

For data sources see[1][2]

Well History

Date Event
1994-02-07 Obtained License
1994-03-13 Surface Casing Operation Performed
1994-03-15 Well Log Performed
1994-03-20 Finished Drilling
1994-03-20 Well Mode changed to Drilled and Cased
1994-03-21 Well Log Performed
1994-03-22 Production Casing Operation Performed
1994-03-23 Rig Released
1994-05-03 Well Log Performed
1994-05-05 Perforation Treatment Performed - Jet Perforation
1994-05-07 Perforation Treatment Performed - Fractured
1994-11-01 Well Began Production
1994-11-01 Well Fluid changed to Gas
1994-11-01 Well Mode changed to Flowing
1996-10-23 Perforation Treatment Performed - Jet Perforation
1996-10-23 Well Log Performed
1996-11-21 Perforation Treatment Performed - Chemical Squeeze
1996-11-29 Perforation Treatment Performed - Fractured
1996-12-13 Well Fluid changed to Gas
1996-12-13 Well Mode changed to Flowing
1998-04-01 Well Fluid changed to Gas
1998-04-01 Well Mode changed to Flowing
2008-10-23 Well Fluid changed to Gas
2008-10-23 Well Mode changed to Pumping
2009-10-08 Well Fluid changed to Gas
2009-10-08 Well Mode changed to Flowing
2016-06-01 Well Fluid changed to Gas
2016-06-01 Well Mode changed to Pumping
2018-05-01 Well Fluid changed to Gas
2018-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-05 Perforation 1855.50 1865.50 13
1994-05-07 Fracture 1855.50 1865.50 0
1996-10-23 Perforation 1879.00 1880.50 13
1996-11-21 Chemical Squeeze 1855.50 1865.50 0
1996-11-29 Fracture 1855.50 1865.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 798 0.0 0.0 0.0
1995 6141 0.0 0.0 0.0
1996 6182 0.0 0.0 0.0
1997 7938 0.0 0.0 0.0
1998 8281 0.0 0.0 0.0
1999 8477 0.0 0.0 0.0
2000 8381 0.0 0.0 0.0
2001 8031 0.0 0.0 0.0
2002 8660 0.0 0.0 0.0
2003 8398 0.0 0.0 0.0
2004 8327 0.0 0.0 0.0
2005 8449 0.0 0.0 0.0
2006 8329 0.0 0.0 0.0
2007 8128 0.0 0.0 0.0
2008 7863 0.0 0.0 0.0
2009 7390 0.0 0.0 0.0
2010 8030 0.0 0.0 0.0
2011 7788 0.0 0.0 0.0
2012 6541 0.0 0.0 0.0
2013 8344 0.0 0.0 0.0
2014 8618 0.0 0.0 0.0
2015 8376 0.0 0.0 0.0
2016 5616 0.0 0.0 0.0
2017 8567 0.0 0.0 0.0
2018 1368 0.0 0.0 0.0

For data sources see[5]

References