X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515081406000

Well Details

Well ID: 0515081406000
Loading map...
Location: 00/06-14-051-08W5/0
Location Alias: 00/06-14-51-08 W5M
Location Alias 2: 00/06-14-051-08 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 08
Section: 14
County/Municipality: Parkland County
Well Name: AMOCO ET AL D-3 BIGORAY 6-14-51-8
Operator Name: Obsidian Energy Ltd.
License Number: 0048695
License Date: 1974-01-16
License Status: Issued
Spud Date: 1974-01-17
Final Drill Date: 1974-01-27
Well Total Depth: 1891.30 m
Surface Hole Latitude: 53.401228
Surface Hole Longitude: -115.074201

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-01-16 Obtained License
1974-01-27 Finished Drilling
1974-01-29 Production Casing Operation Performed
1974-02-01 Perforation Treatment Performed - Jet Perforation
1974-02-01 Well Mode changed to Drilled and Cased
1974-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-02-17 Perforation Treatment Performed - Jet Perforation
1979-12-19 Well Began Production
1979-12-19 Well Fluid changed to Crude Oil
1979-12-19 Well Mode changed to Flowing
1982-08-01 Perforation Treatment Performed - Jet Perforation
1982-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-05 Perforation Treatment Performed - Fractured
1982-08-06 Perforation Treatment Performed - Jet Perforation
1982-08-10 Perforation Treatment Performed - Jet Perforation
2002-03-06 Well Fluid changed to Crude Oil
2002-03-06 Well Mode changed to Pumping
2018-01-06 Well Fluid changed to Crude Oil
2018-01-06 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-02-01 Perforation 1811.40 1813.00 7
1982-08-10 Perforation 1795.60 1802.00 13
1974-02-01 Perforation 1816.00 1817.80 7
1974-02-15 Packing Device Capped w/Cement 1813.90 1815.40 0
1974-02-15 Packing Device Capped w/Cement 1806.90 1809.90 0
1974-02-17 Perforation 1796.20 1801.40 7
1982-08-01 Perforation 1795.30 1802.00 13
1982-08-03 Acid Treatment 1795.30 1802.00 0
1982-08-05 Fracture 1795.30 1802.00 0
1982-08-06 Perforation 1796.60 1802.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 288 0.0 0.0 0.0
1980 1686 0.0 0.0 0.0
1981 24 0.0 0.0 0.0
1982 481 0.0 0.0 0.0
1983 1656 0.0 0.0 0.0
1984 249 0.0 0.0 0.0
1985 2687 0.0 0.0 0.0
1986 2168 0.0 0.0 0.0
1987 6500 0.0 0.0 0.0
1988 7835 0.0 0.0 0.0
1989 6747 0.0 0.0 0.0
1990 6098 0.0 0.0 0.0
1991 5281 0.0 0.0 0.0
1992 6185 0.0 0.0 0.0
1993 4493 0.0 0.0 0.0
1994 5790 0.0 0.0 0.0
1995 6152 0.0 0.0 0.0
1996 1699 0.0 0.0 0.0
1997 5738 0.0 0.0 0.0
1998 4562 0.0 0.0 0.0
1999 3122 0.0 0.0 0.0
2000 6603 0.0 0.0 0.0
2001 8310 0.0 0.0 0.0
2002 8443 0.0 0.0 0.0
2003 8322 0.0 0.0 0.0
2004 8721 0.0 0.0 0.0
2005 8568 0.0 0.0 0.0
2006 8720 0.0 0.0 0.0
2007 8647 0.0 0.0 0.0
2008 8518 0.0 0.0 0.0
2009 8666 0.0 0.0 0.0
2010 8501 0.0 0.0 0.0
2011 8555 0.0 0.0 0.0
2012 8731 0.0 0.0 0.0
2013 8625 0.0 0.0 0.0
2014 8701 0.0 0.0 0.0
2015 8727 0.0 0.0 0.0
2016 8013 0.0 0.0 0.0
2017 4799 0.0 0.0 0.0
2018 8278 0.0 0.0 0.0
2019 8485 0.0 0.0 0.0
2020 1985 0.0 0.0 0.0

For data sources see[5]

References