If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515120405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.373505,"lon":-115.694223,"icon":""}]} |
Location: 00/05-04-051-12W5/0 | |
Location Alias: 00/05-04-51-12 W5M | |
Location Alias 2: 00/05-04-051-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 12 | |
Section: 04 | |
County/Municipality: Yellowhead County | |
Well Name: BACCALIEU PEMBINA 5-4-51-12 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0439317 | |
License Date: 2011-11-22 | |
License Status: Issued | |
Spud Date: 2011-12-10 | |
Final Drill Date: 2012-01-06 | |
Well Total Depth: 3328.00 m | |
Surface Hole Latitude: 53.373505 | |
Surface Hole Longitude: -115.694223 |
Date | Event |
---|---|
2011-11-22 | Obtained License |
2011-12-12 | Surface Casing Operation Performed |
2011-12-28 | Direction Drilling Operation Performed - Horizontal |
2012-01-06 | Finished Drilling |
2012-01-06 | Well Mode changed to Drilled and Cased |
2012-01-08 | Production Casing Operation Performed |
2012-01-08 | Rig Released |
2012-01-30 | Well Log Performed |
2012-02-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-02-06 | Perforation Treatment Performed - Fractured |
2012-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-07 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-02-07 | Perforation Treatment Performed - Fractured |
2012-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-02-08 | Perforation Treatment Performed - Fractured |
2012-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-15 | Well Fluid changed to Crude Oil |
2012-03-15 | Well Mode changed to Potential |
2012-03-16 | Well Began Production |
2012-03-16 | Well Fluid changed to Crude Oil |
2012-03-16 | Well Mode changed to Gas Lift |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-28 | 1510.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-06 | Hydra Jet Perforation | 3302.00 | 3302.30 | 0 |
2012-02-07 | Hydra Jet Perforation | 2432.00 | 2432.30 | 0 |
2012-02-07 | Fracture | 2432.00 | 2432.30 | 0 |
2012-02-08 | Multi-Stage Fracture | 2293.10 | 2293.20 | 0 |
2012-02-08 | Multi-Stage Fracture | 2121.60 | 2121.70 | 0 |
2012-02-08 | Multi-Stage Fracture | 1962.20 | 1962.30 | 0 |
2012-02-08 | Hydra Jet Perforation | 1952.00 | 1952.30 | 0 |
2012-02-08 | Fracture | 1952.00 | 1952.30 | 0 |
2012-02-06 | Fracture | 3302.00 | 3302.30 | 0 |
2012-02-06 | Multi-Stage Fracture | 3125.90 | 3126.00 | 0 |
2012-02-06 | Hydra Jet Perforation | 3096.50 | 3096.80 | 0 |
2012-02-06 | Fracture | 3096.50 | 3096.80 | 0 |
2012-02-07 | Multi-Stage Fracture | 2963.10 | 2963.20 | 0 |
2012-02-07 | Multi-Stage Fracture | 2800.60 | 2800.70 | 0 |
2012-02-07 | Multi-Stage Fracture | 2632.40 | 2632.50 | 0 |
2012-02-07 | Multi-Stage Fracture | 2465.10 | 2465.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5696 | 0.0 | 0.0 | 0.0 |
2013 | 8658 | 0.0 | 0.0 | 0.0 |
2014 | 8338 | 0.0 | 0.0 | 0.0 |
2015 | 8602 | 0.0 | 0.0 | 0.0 |
2016 | 8626 | 0.0 | 0.0 | 0.0 |
2017 | 8715 | 0.0 | 0.0 | 0.0 |
2018 | 8573 | 0.0 | 0.0 | 0.0 |
2019 | 8427 | 0.0 | 0.0 | 0.0 |
2020 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[6]