X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515120912000

Well Details

Well ID: 0515120912000
Loading map...
Location: 00/12-09-051-12W5/0
Location Alias: 00/12-09-51-12 W5M
Location Alias 2: 00/12-09-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 09
County/Municipality: Yellowhead County
Well Name: BACCALIEU PEMBINA 12-9-51-12
Operator Name: Baccalieu Energy Inc.
License Number: 0412871
License Date: 2009-10-02
License Status: Amended
Spud Date: 2009-12-17
Final Drill Date: 2010-01-06
Well Total Depth: 3434.00 m
Surface Hole Latitude: 53.393083
Surface Hole Longitude: -115.694127

For data sources see[1][2]

Well History

Date Event
2009-10-02 Obtained License
2009-12-19 Surface Casing Operation Performed
2009-12-30 Direction Drilling Operation Performed - Horizontal
2010-01-06 Finished Drilling
2010-01-06 Well Mode changed to Drilled and Cased
2010-01-07 Well Log Performed
2010-01-09 Production Casing Operation Performed
2010-01-09 Rig Released
2010-01-25 Perforation Treatment Performed - Jet Perforation
2010-01-26 Perforation Treatment Performed - Fractured
2010-01-26 Perforation Treatment Performed - Jet Perforation
2010-01-27 Perforation Treatment Performed - Fractured
2010-01-27 Perforation Treatment Performed - Jet Perforation
2010-01-28 Perforation Treatment Performed - Fractured
2010-01-28 Perforation Treatment Performed - Jet Perforation
2010-01-29 Perforation Treatment Performed - Fractured
2010-01-29 Perforation Treatment Performed - Jet Perforation
2010-01-30 Perforation Treatment Performed - Fractured
2010-01-30 Perforation Treatment Performed - Jet Perforation
2010-03-06 Well Began Production
2010-03-06 Well Fluid changed to Crude Oil
2010-03-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-30 1445.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-25 Perforation 3322.00 3323.00 20
2010-01-29 Fracture 2668.00 2669.50 0
2010-01-29 Perforation 2513.00 2514.50 20
2010-01-29 Fracture 2513.00 2514.50 0
2010-01-30 Perforation 2343.00 2344.50 20
2010-01-30 Fracture 2343.00 2344.50 0
2010-01-30 Perforation 2179.00 2180.50 20
2010-01-30 Fracture 2179.00 2180.50 0
2010-01-26 Fracture 3322.00 3323.00 0
2010-01-26 Perforation 3171.00 3172.00 20
2010-01-27 Fracture 3171.00 3172.00 0
2010-01-27 Perforation 3023.00 3024.00 20
2010-01-28 Fracture 3023.00 3024.00 0
2010-01-28 Perforation 2846.00 2847.50 20
2010-01-28 Fracture 2846.00 2847.50 0
2010-01-29 Perforation 2668.00 2669.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7056 0.0 0.0 0.0
2011 8357 0.0 0.0 0.0
2012 8255 0.0 0.0 0.0
2013 8391 0.0 0.0 0.0
2014 8042 0.0 0.0 0.0
2015 8486 0.0 0.0 0.0
2016 8329 0.0 0.0 0.0
2017 8686 0.0 0.0 0.0
2018 8380 0.0 0.0 0.0
2019 8675 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References