X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515120913000

Well Details

Well ID: 0515120913000
Loading map...
Location: 00/13-09-051-12W5/0
Location Alias: 00/13-09-51-12 W5M
Location Alias 2: 00/13-09-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 09
County/Municipality: Yellowhead County
Well Name: BACCALIEU HZ PEMBINA 13-9-51-12
Operator Name: Baccalieu Energy Inc.
License Number: 0478412
License Date: 2015-12-11
License Status: Issued
Spud Date: 2016-01-18
Final Drill Date: 2016-01-27
Well Total Depth: 3509.00 m
Surface Hole Latitude: 53.393550
Surface Hole Longitude: -115.693112

For data sources see[1][2]

Well History

Date Event
2015-12-11 Obtained License
2016-01-20 Surface Casing Operation Performed
2016-01-22 Direction Drilling Operation Performed - Deviate
2016-01-23 Direction Drilling Operation Performed - Horizontal
2016-01-26 Well Log Performed
2016-01-27 Finished Drilling
2016-01-27 Well Mode changed to Drilled and Cased
2016-01-28 Liner Casing Operation Performed
2016-01-28 Rig Released
2016-02-18 Well Log Performed
2016-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-25 Perforation Treatment Performed - Open-Hole Completion
2016-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-05-02 Well Began Production
2016-05-02 Well Fluid changed to Crude Oil
2016-05-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-18 Ensign Drilling Inc. 544 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-22 1542.70 Deviate (5 - 79 degrees)
2016-01-23 1867.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-25 Open Hole/Barefoot Completion 3505.00 3509.00 0
2016-02-25 Multi-Stage Fracture 2925.70 2925.80 0
2016-02-25 Multi-Stage Fracture 2856.30 2856.40 0
2016-02-25 Multi-Stage Fracture 2792.00 2792.10 0
2016-02-25 Multi-Stage Fracture 2722.50 2722.60 0
2016-02-25 Multi-Stage Fracture 2652.70 2652.80 0
2016-02-25 Multi-Stage Fracture 2583.00 2583.10 0
2016-02-25 Multi-Stage Fracture 2513.20 2513.30 0
2016-02-25 Multi-Stage Fracture 2443.40 2443.50 0
2016-02-26 Multi-Stage Fracture 2373.60 2373.70 0
2016-02-26 Multi-Stage Fracture 2304.00 2304.10 0
2016-02-25 Multi-Stage Fracture 3465.30 3465.40 0
2016-02-26 Multi-Stage Fracture 2234.20 2234.30 0
2016-02-26 Multi-Stage Fracture 2164.40 2164.50 0
2016-02-26 Multi-Stage Fracture 2094.70 2094.80 0
2016-02-26 Multi-Stage Fracture 2024.90 2025.00 0
2016-02-26 Multi-Stage Fracture 1968.70 1968.80 0
2016-02-25 Multi-Stage Fracture 3407.20 3407.30 0
2016-02-25 Multi-Stage Fracture 3340.50 3340.60 0
2016-02-25 Multi-Stage Fracture 3270.80 3270.90 0
2016-02-25 Multi-Stage Fracture 3204.00 3204.10 0
2016-02-25 Multi-Stage Fracture 3134.50 3134.60 0
2016-02-25 Multi-Stage Fracture 3065.20 3065.30 0
2016-02-25 Multi-Stage Fracture 2995.50 2995.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-25 2016-02-26 1,763 3,049 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.3813 N/A
Sand (20/40) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 4.2303 N/A
Crystalline silica. quartz 14808-60-7 100 4.2303 N/A
Iron Oxide 1309-37-1 100 4.2303 N/A
Titanium Oxide 13463-67-7 100 4.2303 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 8.5333 N/A
Crystalline silica. quartz 14808-60-7 100 8.5333 N/A
Iron Oxide 1309-37-1 100 8.5333 N/A
Titanium Oxide 13463-67-7 100 8.5333 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0117 N/A
Water 7732-18-5 100 0.0117 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.1721 N/A
CAN-2411 Non-emulsifier Canyon Technical Services Demulsifier Ethylene glycol 107-21-1 100 0.0765 N/A
Isopropanol 67-63-0 100 0.0765 N/A
Water 7732-18-5 100 0.0765 N/A
Nitrogen Gas Canyon Technical Services Energizing Fluid Nitrogen 7727-37-9 100 4.1072 N/A
Non-hazardous base ingredient(s) Not Available 100 4.1072 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.042 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-13 2016-02-20 Groundwater - Non-saline less than or equal to 150m deep 1104
2016-02-13 2016-02-21 Groundwater - Non-saline less than or equal to 150m deep 871
2016-02-11 2016-02-21 Groundwater - Non-saline less than or equal to 150m deep 1584

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 5588 0.0 0.0 0.0
2017 8376 0.0 0.0 0.0
2018 8664 0.0 0.0 0.0
2019 8712 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-28 No Incident Encountered 0.00 0.00
2016-02-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References