If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515121415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.394049,"lon":-115.65965,"icon":""}]} |
| Location: 00/15-14-051-12W5/0 | |
| Location Alias: 00/15-14-51-12 W5M | |
| Location Alias 2: 00/15-14-051-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 14 | |
| County/Municipality: Yellowhead County | |
| Well Name: BACCALIEU HZ PEMBINA 15-14-51-12 | |
| Operator Name: Baccalieu Energy Inc. | |
| License Number: 0482202 | |
| License Date: 2017-01-04 | |
| License Status: Issued | |
| Spud Date: 2018-02-13 | |
| Final Drill Date: 2018-02-19 | |
| Well Total Depth: 3319.00 m | |
| Surface Hole Latitude: 53.394049 | |
| Surface Hole Longitude: -115.659650 |
| Date | Event |
|---|---|
| 2017-01-04 | Obtained License |
| 2018-02-14 | Surface Casing Operation Performed |
| 2018-02-16 | Direction Drilling Operation Performed - Deviate |
| 2018-02-17 | Direction Drilling Operation Performed - Horizontal |
| 2018-02-19 | Finished Drilling |
| 2018-02-19 | Well Mode changed to Drilled and Cased |
| 2018-02-20 | Well Log Performed |
| 2018-02-21 | Production Casing Operation Performed |
| 2018-02-21 | Rig Released |
| 2018-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-03-17 | Well Began Production |
| 2018-03-17 | Well Fluid changed to Crude Oil |
| 2018-03-17 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-02-13 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-02-16 | 1464.20 | Deviate (5 - 79 degrees) |
| 2018-02-17 | 1890.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-03-13 | Multi-Stage Fracture | 3282.20 | 3282.30 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2822.50 | 2822.60 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2763.60 | 2763.70 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2704.60 | 2704.70 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2645.70 | 2645.80 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2586.80 | 2586.90 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2527.90 | 2528.00 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2468.90 | 2469.00 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2409.90 | 2410.00 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2351.00 | 2351.10 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2292.50 | 2292.60 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 3238.90 | 3239.00 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2233.10 | 2233.20 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2174.20 | 2174.30 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2115.30 | 2115.40 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2057.20 | 2057.30 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 1998.30 | 1998.40 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 3193.90 | 3194.00 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 3148.60 | 3148.70 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 3103.70 | 3103.80 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 3058.20 | 3058.30 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2999.20 | 2999.30 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2940.30 | 2940.40 | 0 |
| 2018-03-14 | Multi-Stage Fracture | 2881.40 | 2881.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-03-13 | 2018-03-14 | 1,752 | 2,720 | N/A |
| 2 | 2018-03-13 | 2018-03-13 | 1,752 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 84.4995 | N/A | |||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 15.2926 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.01 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.01 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.01 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.01 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.01 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0902 | N/A | |
| water | Not Available | 100 | 0.0902 | N/A | ||||
| FR-22 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0375 | N/A | |
| distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0375 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0375 | N/A | ||||
| SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0247 | N/A | |
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0411 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0411 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0411 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0411 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0411 | N/A | ||||
| 2 | MFR-2 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.0977 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-03-14 | 2018-03-15 | Surface Water - Runoff | 1181 |
| 2018-03-03 | 2018-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 1153 |
| 2018-03-03 | 2018-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 634 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 6223 | 0.0 | 0.0 | 0.0 |
| 2019 | 8667 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-02-21 | No Incident Encountered | 0.00 | 0.00 |
| 2018-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]