If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515170304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.382367,"lon":-116.431986,"icon":""}]} |
| Location: 00/04-03-051-17W5/0 | |
| Location Alias: 00/04-03-51-17 W5M | |
| Location Alias 2: 00/04-03-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 03 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI HZ EDSON 4-3-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0483872 | |
| License Date: 2017-06-06 | |
| License Status: Amended | |
| Spud Date: 2017-08-05 | |
| Final Drill Date: 2017-08-17 | |
| Well Total Depth: 4148.00 m | |
| Surface Hole Latitude: 53.382367 | |
| Surface Hole Longitude: -116.431986 |
| Date | Event |
|---|---|
| 2017-06-06 | Obtained License |
| 2017-08-06 | Surface Casing Operation Performed |
| 2017-08-10 | Direction Drilling Operation Performed - Deviate |
| 2017-08-13 | Intermediate Casing Operation Performed |
| 2017-08-15 | Direction Drilling Operation Performed - Horizontal |
| 2017-08-17 | Finished Drilling |
| 2017-08-17 | Well Log Performed |
| 2017-08-17 | Well Mode changed to Drilled and Cased |
| 2017-08-18 | Production Casing Operation Performed |
| 2017-08-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-08-20 | Rig Released |
| 2017-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-15 | Well Fluid changed to Gas |
| 2017-11-15 | Well Mode changed to Testing |
| 2017-12-20 | Well Began Production |
| 2017-12-20 | Well Fluid changed to Gas |
| 2017-12-20 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-08-05 | Precision Drilling Corporation | 231 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-08-10 | 2021.60 | Deviate (5 - 79 degrees) |
| 2017-08-15 | 2870.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-08-20 | Open Hole/Barefoot Completion | 4096.00 | 4148.00 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3628.50 | 3628.60 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3573.30 | 3573.40 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3531.40 | 3531.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3488.80 | 3488.90 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3433.90 | 3434.00 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3377.20 | 3377.30 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3320.10 | 3320.20 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3263.90 | 3264.00 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3207.90 | 3208.00 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3151.30 | 3151.40 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 4085.10 | 4085.20 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3094.60 | 3094.70 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 3038.60 | 3038.70 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 2981.60 | 2981.70 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 2925.00 | 2925.10 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 2869.30 | 2869.40 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 4023.40 | 4023.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3966.50 | 3966.60 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3909.40 | 3909.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3853.70 | 3853.80 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3796.60 | 3796.70 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3740.80 | 3740.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3684.00 | 3684.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-11-04 | 2017-11-05 | 2,704 | 8,571 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 82.8096 | N/A | |||
| FRAC SAND. 30/50 CANADIAN | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.2996 | N/A | ||
| FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.1181 | N/A | ||
| TrueNorth LT 20/40 | BJ Services | Crystalline silica. Quartz | 14808-60-7 | 100 | 3.3544 | N/A | ||
| Furfuryl alcohol | 98-00-0 | 100 | 3.3544 | N/A | ||||
| Phenolic resin | 9003-35-4 | 100 | 3.3545 | N/A | ||||
| Alpha 544 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0087 | N/A | |
| Dibromoacetonitrile | 3252-43-5 | 100 | 0.0087 | N/A | ||||
| Polyethylene Glycol | 25322-68-3 | 100 | 0.0087 | N/A | ||||
| Sodium Bromide | 7647-15-6 | 100 | 0.0087 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0087 | N/A | ||||
| Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0033 | N/A | |
| CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0855 | N/A | |
| Non-hazardous | Not Available | 100 | 0.0855 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0855 | N/A | ||||
| D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0623 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0623 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0623 | N/A | ||||
| MaxPerm-20A | BJ Services | Friction Reducer | Non-hazardous | 9014 | 100 | 0.0845 | N/A | |
| Oxyalkylated alcohol | 9014 | 100 | 0.0845 | N/A | ||||
| Petroleum distillates | 64742-47-8 | 100 | 0.0845 | N/A | ||||
| Polyacrylate | 9014 | 100 | 0.0845 | N/A | ||||
| ScaleTrol 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0103 | N/A | |
| Water | 7732-18-5 | 100 | 0.0103 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-10-19 | 2017-10-20 | Municipal Water | 210 |
| 2017-10-24 | 2017-11-05 | Central Water Distribution Facility | 8031 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 325 | 0.0 | 0.0 | 0.0 |
| 2018 | 8312 | 0.0 | 0.0 | 0.0 |
| 2019 | 8195 | 0.0 | 0.0 | 0.0 |
| 2020 | 2119 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-08-20 | No Incident Encountered | 0.00 | 0.00 |
| 2017-11-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]