X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515170304000

Well Details

Well ID: 0515170304000
Loading map...
Location: 00/04-03-051-17W5/0
Location Alias: 00/04-03-51-17 W5M
Location Alias 2: 00/04-03-051-17 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 17
Section: 03
County/Municipality: Yellowhead County
Well Name: ROGCI HZ EDSON 4-3-51-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0483872
License Date: 2017-06-06
License Status: Amended
Spud Date: 2017-08-05
Final Drill Date: 2017-08-17
Well Total Depth: 4148.00 m
Surface Hole Latitude: 53.382367
Surface Hole Longitude: -116.431986

For data sources see[1][2]

Well History

Date Event
2017-06-06 Obtained License
2017-08-06 Surface Casing Operation Performed
2017-08-10 Direction Drilling Operation Performed - Deviate
2017-08-13 Intermediate Casing Operation Performed
2017-08-15 Direction Drilling Operation Performed - Horizontal
2017-08-17 Finished Drilling
2017-08-17 Well Log Performed
2017-08-17 Well Mode changed to Drilled and Cased
2017-08-18 Production Casing Operation Performed
2017-08-20 Perforation Treatment Performed - Open-Hole Completion
2017-08-20 Rig Released
2017-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-15 Well Fluid changed to Gas
2017-11-15 Well Mode changed to Testing
2017-12-20 Well Began Production
2017-12-20 Well Fluid changed to Gas
2017-12-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-05 Precision Drilling Corporation 231 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-10 2021.60 Deviate (5 - 79 degrees)
2017-08-15 2870.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-20 Open Hole/Barefoot Completion 4096.00 4148.00 0
2017-11-04 Multi-Stage Fracture 3628.50 3628.60 0
2017-11-04 Multi-Stage Fracture 3573.30 3573.40 0
2017-11-04 Multi-Stage Fracture 3531.40 3531.50 0
2017-11-04 Multi-Stage Fracture 3488.80 3488.90 0
2017-11-05 Multi-Stage Fracture 3433.90 3434.00 0
2017-11-05 Multi-Stage Fracture 3377.20 3377.30 0
2017-11-05 Multi-Stage Fracture 3320.10 3320.20 0
2017-11-05 Multi-Stage Fracture 3263.90 3264.00 0
2017-11-05 Multi-Stage Fracture 3207.90 3208.00 0
2017-11-05 Multi-Stage Fracture 3151.30 3151.40 0
2017-11-04 Multi-Stage Fracture 4085.10 4085.20 0
2017-11-05 Multi-Stage Fracture 3094.60 3094.70 0
2017-11-05 Multi-Stage Fracture 3038.60 3038.70 0
2017-11-05 Multi-Stage Fracture 2981.60 2981.70 0
2017-11-05 Multi-Stage Fracture 2925.00 2925.10 0
2017-11-05 Multi-Stage Fracture 2869.30 2869.40 0
2017-11-04 Multi-Stage Fracture 4023.40 4023.50 0
2017-11-04 Multi-Stage Fracture 3966.50 3966.60 0
2017-11-04 Multi-Stage Fracture 3909.40 3909.50 0
2017-11-04 Multi-Stage Fracture 3853.70 3853.80 0
2017-11-04 Multi-Stage Fracture 3796.60 3796.70 0
2017-11-04 Multi-Stage Fracture 3740.80 3740.90 0
2017-11-04 Multi-Stage Fracture 3684.00 3684.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-04 2017-11-05 2,704 8,571 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.8096 N/A
FRAC SAND. 30/50 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 12.2996 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.1181 N/A
TrueNorth LT 20/40 BJ Services Crystalline silica. Quartz 14808-60-7 100 3.3544 N/A
Furfuryl alcohol 98-00-0 100 3.3544 N/A
Phenolic resin 9003-35-4 100 3.3545 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0087 N/A
Dibromoacetonitrile 3252-43-5 100 0.0087 N/A
Polyethylene Glycol 25322-68-3 100 0.0087 N/A
Sodium Bromide 7647-15-6 100 0.0087 N/A
Water 7732-18-5 100 0.0087 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0033 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0855 N/A
Non-hazardous Not Available 100 0.0855 N/A
Water 7732-18-5 100 0.0855 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0623 N/A
Isopropanol 67-63-0 100 0.0623 N/A
Methanol 67-56-1 100 0.0623 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0845 N/A
Oxyalkylated alcohol 9014 100 0.0845 N/A
Petroleum distillates 64742-47-8 100 0.0845 N/A
Polyacrylate 9014 100 0.0845 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0103 N/A
Water 7732-18-5 100 0.0103 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-19 2017-10-20 Municipal Water 210
2017-10-24 2017-11-05 Central Water Distribution Facility 8031

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 325 0.0 0.0 0.0
2018 8312 0.0 0.0 0.0
2019 8195 0.0 0.0 0.0
2020 2119 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-20 No Incident Encountered 0.00 0.00
2017-11-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References