If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515172001020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.396986,"lon":-116.458671,"icon":""}]} |
| Location: 02/01-20-051-17W5/0 | |
| Location Alias: 02/01-20-51-17 W5M | |
| Location Alias 2: 02/01-20-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI 02 HZ EDSON 1-20-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0480736 | |
| License Date: 2016-10-12 | |
| License Status: Amended | |
| Spud Date: 2017-02-21 | |
| Final Drill Date: 2017-03-06 | |
| Well Total Depth: 4577.00 m | |
| Surface Hole Latitude: 53.396986 | |
| Surface Hole Longitude: -116.458671 |
| Date | Event |
|---|---|
| 2016-10-12 | Obtained License |
| 2017-02-22 | Surface Casing Operation Performed |
| 2017-02-24 | Direction Drilling Operation Performed - Deviate |
| 2017-02-27 | Direction Drilling Operation Performed - Horizontal |
| 2017-02-28 | Intermediate Casing Operation Performed |
| 2017-02-28 | Well Log Performed |
| 2017-03-06 | Finished Drilling |
| 2017-03-06 | Well Log Performed |
| 2017-03-06 | Well Mode changed to Drilled and Cased |
| 2017-03-07 | Production Casing Operation Performed |
| 2017-03-08 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-03-08 | Rig Released |
| 2017-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-30 | Well Fluid changed to Gas |
| 2017-06-30 | Well Mode changed to Testing |
| 2017-08-01 | Well Began Production |
| 2017-08-01 | Well Fluid changed to Gas |
| 2017-08-01 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-02-21 | Trinidad Drilling Ltd. | 418 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-02-24 | 862.60 | Deviate (5 - 79 degrees) |
| 2017-02-27 | 2833.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-03-08 | Open Hole/Barefoot Completion | 4561.80 | 4577.00 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 3960.70 | 3960.80 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 3889.80 | 3889.90 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3819.80 | 3819.90 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3749.40 | 3749.50 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3678.20 | 3678.30 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3608.50 | 3608.60 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3538.50 | 3538.60 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3480.70 | 3480.80 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3409.10 | 3409.20 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3337.80 | 3337.90 | 0 |
| 2017-06-25 | Multi-Stage Fracture | 4522.10 | 4522.20 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3266.80 | 3266.90 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3195.30 | 3195.40 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3126.60 | 3126.70 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 3055.70 | 3055.80 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 2998.10 | 2998.20 | 0 |
| 2017-06-27 | Multi-Stage Fracture | 2940.50 | 2940.60 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4464.70 | 4464.80 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4392.30 | 4392.40 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4321.10 | 4321.20 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4256.10 | 4256.20 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4185.20 | 4185.30 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4114.10 | 4114.20 | 0 |
| 2017-06-26 | Multi-Stage Fracture | 4044.90 | 4045.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-06-25 | 2017-06-27 | 2,677 | 9,055 | N/A |
| 2 | 2017-06-26 | 2017-06-27 | 2,677 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 82.8168 | N/A | |||
| Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.3837 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 3.3837 | N/A | ||||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 12.4058 | N/A | ||
| Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 1.121 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0098 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.0098 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0098 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0098 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0098 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1548 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1548 | N/A | ||||
| FR-22 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0459 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0459 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0459 | N/A | ||||
| SI-14 | Trican | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.0163 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0163 | N/A | ||||
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0403 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0403 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0403 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0403 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0403 | N/A | ||||
| 2 | TriVert 1000 | Trican | Diverting Agent | non-hazardous ingredients | Not Available | 100 | 0.0052 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-06-23 | 2017-06-27 | Central Water Distribution Facility | 6972 |
| 2017-06-06 | 2017-06-08 | Recycled Fracturing Water (treated at well site) | 1752 |
| 2017-06-05 | 2017-06-05 | Municipal Water | 90 |
| 2017-06-13 | 2017-06-13 | Oilfield Produced Water | 7 |
| 2017-06-13 | 2017-06-16 | Oilfield Produced Water | 16 |
| 2017-06-13 | 2017-06-15 | Oilfield Produced Water | 38 |
| 2017-06-15 | 2017-06-19 | Oilfield Produced Water | 50 |
| 2017-06-13 | 2017-06-13 | Oilfield Produced Water | 8 |
| 2017-06-16 | 2017-06-16 | Oilfield Produced Water | 13 |
| 2017-06-15 | 2017-06-15 | Oilfield Produced Water | 7 |
| 2017-06-15 | 2017-06-15 | Oilfield Produced Water | 13 |
| 2017-06-13 | 2017-06-20 | Oilfield Produced Water | 70 |
| 2017-06-15 | 2017-06-19 | Oilfield Produced Water | 55 |
| 2017-06-13 | 2017-06-16 | Oilfield Produced Water | 91 |
| 2017-06-19 | 2017-06-19 | Oilfield Produced Water | 22 |
| 2017-06-19 | 2017-06-19 | Oilfield Produced Water | 26 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 3533 | 0.0 | 0.0 | 0.0 |
| 2018 | 5907 | 0.0 | 0.0 | 0.0 |
| 2019 | 7972 | 0.0 | 0.0 | 0.0 |
| 2020 | 2119 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-03-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-06-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]