X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515173107000

Well Details

Well ID: 0515173107000
Loading map...
Location: 00/07-31-051-17W5/0
Location Alias: 00/07-31-51-17 W5M
Location Alias 2: 00/07-31-051-17 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 17
Section: 31
County/Municipality: Yellowhead County
Well Name: TALISMAN EDSON 7-31-51-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0026626
License Date: 1964-08-10
License Status: Issued
Spud Date: 1964-11-20
Final Drill Date: 1965-01-05
Well Total Depth: 2899.90 m
Surface Hole Latitude: 53.444765
Surface Hole Longitude: -116.492051

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-08-10 Obtained License
1964-11-30 Drill Stem Test Performed
1964-12-08 Drill Stem Test Performed
1964-12-19 Drill Stem Test Performed
1964-12-28 Drill Stem Test Performed
1965-01-05 Finished Drilling
1965-01-06 Drill Stem Test Performed
1965-01-08 Production Casing Operation Performed
1965-01-10 Perforation Treatment Performed - Jet Perforation
1965-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-13 Perforation Treatment Performed - Cement Squeeze
1965-01-14 Perforation Treatment Performed - Jet Perforation
1965-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-13 Well Mode changed to Drilled and Cased
1966-11-25 Well Began Production
1966-11-25 Well Fluid changed to Gas
1966-11-25 Well Mode changed to Flowing
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-01-10 Perforation 2880.40 2882.80 7
1965-01-11 Acid Treatment 2880.40 2882.80 0
1965-01-13 Cement Squeeze 2880.40 2882.80 0
1965-01-14 Perforation 2861.50 2864.80 7
1965-01-14 Perforation 2865.40 2869.70 7
1965-01-28 Acid Treatment 2861.50 2869.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1334 0.0 0.0 0.0
1969 7700 0.0 0.0 0.0
1970 7029 0.0 0.0 0.0
1971 7718 0.0 0.0 0.0
1972 8011 0.0 0.0 0.0
1973 7937 0.0 0.0 0.0
1974 8240 0.0 0.0 0.0
1975 8236 0.0 0.0 0.0
1976 6890 0.0 0.0 0.0
1977 7403 0.0 0.0 0.0
1978 4310 0.0 0.0 0.0
1979 4859 0.0 0.0 0.0
1980 3274 0.0 0.0 0.0
1981 8498 0.0 0.0 0.0
1982 8119 0.0 0.0 0.0
1983 8319 0.0 0.0 0.0
1984 8332 0.0 0.0 0.0
1985 7913 0.0 0.0 0.0
1986 8482 0.0 0.0 0.0
1987 7675 0.0 0.0 0.0
1988 7945 0.0 0.0 0.0
1989 8170 0.0 0.0 0.0
1990 8694 0.0 0.0 0.0
1991 8437 0.0 0.0 0.0
1992 8467 0.0 0.0 0.0
1993 8385 0.0 0.0 0.0
1994 8743 0.0 0.0 0.0
1995 8281 0.0 0.0 0.0
1996 8520 0.0 0.0 0.0
1997 8334 0.0 0.0 0.0
1998 8590 0.0 0.0 0.0
1999 8748 0.0 0.0 0.0
2000 8502 0.0 0.0 0.0
2001 8746 0.0 0.0 0.0
2002 8744 0.0 0.0 0.0
2003 8445 0.0 0.0 0.0
2004 8781 0.0 0.0 0.0
2005 8285 0.0 0.0 0.0
2006 8344 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8400 0.0 0.0 0.0
2010 8524 0.0 0.0 0.0
2011 8399 0.0 0.0 0.0
2012 8206 0.0 0.0 0.0
2013 8532 0.0 0.0 0.0
2014 7536 0.0 0.0 0.0
2015 7979 0.0 0.0 0.0
2016 7203 0.0 0.0 0.0
2017 5953 0.0 0.0 0.0
2018 8207 0.0 0.0 0.0
2019 7679 0.0 0.0 0.0
2020 1967 0.0 0.0 0.0

For data sources see[5]

References