X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515241703002

Well Details

Well ID: 0515241703002
Loading map...
Location: 00/03-17-051-24W5/2
Location Alias: 00/03-17-51-24 W5M
Location Alias 2: 00/03-17-051-24 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 24
Section: 17
County/Municipality: Yellowhead County
Well Name: CONOCO ET AL ANDERSON 3-17-51-24
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0217304
License Date: 1998-08-31
License Status: RecCertified
Spud Date: 1998-10-03
Final Drill Date: 1998-11-19
Well Total Depth: 2727.00 m
Surface Hole Latitude: 53.397140
Surface Hole Longitude: -117.491579

For data sources see[1][2]

Well History

Date Event
1998-08-31 Obtained License
1998-10-06 Surface Casing Operation Performed
1998-10-07 Direction Drilling Operation Performed - Deviate
1998-10-13 Lost Circulation Occurred
1998-10-23 Kick Occurred
1998-10-29 Intermediate Casing Operation Performed
1998-11-01 Drill Stem Test Performed
1998-11-08 Well Log Performed
1998-11-11 Liner Casing Operation Performed
1998-11-12 Well Log Performed
1998-11-19 Finished Drilling
1998-11-19 Well Mode changed to Drilled and Cased
1998-11-23 Well Log Performed
1998-11-29 Perforation Treatment Performed - Open-Hole Completion
1998-11-30 Rig Released
2004-02-06 Well Log Performed
2004-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-07 Plug Back Performed
2004-02-07 Well Log Performed
2004-02-08 Perforation Treatment Performed - Jet Perforation
2004-02-08 Well Log Performed
2004-02-10 Well Fluid changed to Gas
2004-02-10 Well Mode changed to Testing
2004-04-12 Well Log Performed
2004-04-14 Well Log Performed
2004-04-17 Perforation Treatment Performed - Fractured
2005-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-30 Plug Back Performed
2005-10-30 Well Fluid changed to Gas
2005-10-30 Well Log Performed
2005-10-30 Well Mode changed to Abandoned Zone
2005-10-31 Perforation Treatment Performed - Jet Perforation
2005-10-31 Well Log Performed
2005-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-01 Perforation Treatment Performed - Jet Perforation
2005-11-01 Well Log Performed
2005-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-05 Perforation Treatment Performed - Cement Squeeze
2005-12-01 Well Abandoned
2005-12-01 Well Fluid changed to Gas
2005-12-01 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-10-07 472.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-11-29 Open Hole/Barefoot Completion 2697.00 2727.00 0
2005-11-01 Packing Device Capped w/Cement 472.00 480.00 0
2005-11-01 Perforation 440.00 441.00 17
2005-11-05 Cement Squeeze 440.00 441.00 0
2005-11-05 Packing Device Capped w/Cement 428.00 436.00 0
2004-02-07 Packing Device Capped w/Cement 2657.00 2665.00 0
2004-02-08 Perforation 2557.00 2563.00 13
2004-02-08 Perforation 2531.00 2537.00 13
2004-04-17 Fracture 2557.00 2563.00 0
2004-04-17 Fracture 2531.00 2537.00 0
2005-10-30 Packing Device Capped w/Cement 2514.70 2522.70 0
2005-10-30 Packing Device Capped w/Cement 2393.00 2425.00 0
2005-10-31 Perforation 484.00 485.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 20 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-10-13 Lost Circulation 1477.00 2533.00
1998-10-23 Kick 2532.00 2533.00

For data sources see[7]

References