If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515241703002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.39714,"lon":-117.491579,"icon":""}]} |
Location: 00/03-17-051-24W5/2 | |
Location Alias: 00/03-17-51-24 W5M | |
Location Alias 2: 00/03-17-051-24 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 24 | |
Section: 17 | |
County/Municipality: Yellowhead County | |
Well Name: CONOCO ET AL ANDERSON 3-17-51-24 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0217304 | |
License Date: 1998-08-31 | |
License Status: RecCertified | |
Spud Date: 1998-10-03 | |
Final Drill Date: 1998-11-19 | |
Well Total Depth: 2727.00 m | |
Surface Hole Latitude: 53.397140 | |
Surface Hole Longitude: -117.491579 |
Date | Event |
---|---|
1998-08-31 | Obtained License |
1998-10-06 | Surface Casing Operation Performed |
1998-10-07 | Direction Drilling Operation Performed - Deviate |
1998-10-13 | Lost Circulation Occurred |
1998-10-23 | Kick Occurred |
1998-10-29 | Intermediate Casing Operation Performed |
1998-11-01 | Drill Stem Test Performed |
1998-11-08 | Well Log Performed |
1998-11-11 | Liner Casing Operation Performed |
1998-11-12 | Well Log Performed |
1998-11-19 | Finished Drilling |
1998-11-19 | Well Mode changed to Drilled and Cased |
1998-11-23 | Well Log Performed |
1998-11-29 | Perforation Treatment Performed - Open-Hole Completion |
1998-11-30 | Rig Released |
2004-02-06 | Well Log Performed |
2004-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-07 | Plug Back Performed |
2004-02-07 | Well Log Performed |
2004-02-08 | Perforation Treatment Performed - Jet Perforation |
2004-02-08 | Well Log Performed |
2004-02-10 | Well Fluid changed to Gas |
2004-02-10 | Well Mode changed to Testing |
2004-04-12 | Well Log Performed |
2004-04-14 | Well Log Performed |
2004-04-17 | Perforation Treatment Performed - Fractured |
2005-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-30 | Plug Back Performed |
2005-10-30 | Well Fluid changed to Gas |
2005-10-30 | Well Log Performed |
2005-10-30 | Well Mode changed to Abandoned Zone |
2005-10-31 | Perforation Treatment Performed - Jet Perforation |
2005-10-31 | Well Log Performed |
2005-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-11-01 | Perforation Treatment Performed - Jet Perforation |
2005-11-01 | Well Log Performed |
2005-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-11-05 | Perforation Treatment Performed - Cement Squeeze |
2005-12-01 | Well Abandoned |
2005-12-01 | Well Fluid changed to Gas |
2005-12-01 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1998-10-07 | 472.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-11-29 | Open Hole/Barefoot Completion | 2697.00 | 2727.00 | 0 |
2005-11-01 | Packing Device Capped w/Cement | 472.00 | 480.00 | 0 |
2005-11-01 | Perforation | 440.00 | 441.00 | 17 |
2005-11-05 | Cement Squeeze | 440.00 | 441.00 | 0 |
2005-11-05 | Packing Device Capped w/Cement | 428.00 | 436.00 | 0 |
2004-02-07 | Packing Device Capped w/Cement | 2657.00 | 2665.00 | 0 |
2004-02-08 | Perforation | 2557.00 | 2563.00 | 13 |
2004-02-08 | Perforation | 2531.00 | 2537.00 | 13 |
2004-04-17 | Fracture | 2557.00 | 2563.00 | 0 |
2004-04-17 | Fracture | 2531.00 | 2537.00 | 0 |
2005-10-30 | Packing Device Capped w/Cement | 2514.70 | 2522.70 | 0 |
2005-10-30 | Packing Device Capped w/Cement | 2393.00 | 2425.00 | 0 |
2005-10-31 | Perforation | 484.00 | 485.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 20 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1998-10-13 | Lost Circulation | 1477.00 | 2533.00 |
1998-10-23 | Kick | 2532.00 | 2533.00 |
For data sources see[7]