If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0524250403022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.455824,"lon":-113.630624,"icon":""}]} |
| Location: 02/03-04-052-25W4/2 | |
| Location Alias: 02/03-04-52-25 W4M | |
| Location Alias 2: 02/03-04-052-25 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 04 | |
| County/Municipality: Edmonton | |
| Well Name: TIDEWATER ARM 3-4-52-25 | |
| Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
| License Number: 0082810 | |
| License Date: 1980-05-14 | |
| License Status: Abandoned | |
| Spud Date: 1980-06-17 | |
| Final Drill Date: 1980-06-29 | |
| Well Total Depth: 1769.00 m | |
| Surface Hole Latitude: 53.455824 | |
| Surface Hole Longitude: -113.630624 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-05-14 | Obtained License |
| 1980-06-29 | Finished Drilling |
| 1980-07-02 | Drill Stem Test Performed |
| 1980-07-04 | Production Casing Operation Performed |
| 1980-07-19 | Well Log Performed |
| 1981-01-07 | Perforation Treatment Performed - Jet Perforation |
| 1981-01-13 | Perforation Treatment Performed - Jet Perforation |
| 1981-01-15 | Perforation Treatment Performed - Cement Squeeze |
| 1981-01-18 | Perforation Treatment Performed - Jet Perforation |
| 1981-01-20 | Perforation Treatment Performed - Cement Squeeze |
| 1981-01-21 | Perforation Treatment Performed - Jet Perforation |
| 1987-11-26 | Well Log Performed |
| 1998-06-29 | Well Mode changed to Drilled and Cased |
| 2001-08-20 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-22 | Perforation Treatment Performed - Cement Squeeze |
| 2001-11-22 | Plug Back Performed |
| 2001-11-30 | Perforation Treatment Performed - Jet Perforation |
| 2001-12-02 | Well Began Production |
| 2001-12-02 | Well Fluid changed to Gas |
| 2001-12-02 | Well Mode changed to Flowing |
| 2008-10-28 | Well Fluid changed to Gas |
| 2008-10-28 | Well Mode changed to Suspended |
| 2017-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-03-07 | Plug Back Performed |
| 2017-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-03-08 | Plug Back Performed |
| 2017-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-03-09 | Plug Back Performed |
| 2017-03-09 | Well Fluid changed to Gas |
| 2017-03-09 | Well Mode changed to Abandoned Zone |
| 2017-06-08 | Well Abandoned |
| 2017-06-08 | Well Fluid changed to Gas |
| 2017-06-08 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1981-01-07 | Perforation | 1231.00 | 1234.00 | 13 |
| 2017-03-07 | Packing Device Capped w/Cement | 1211.00 | 1219.00 | 0 |
| 2017-03-08 | Packing Device Capped w/Cement | 1154.00 | 1162.00 | 0 |
| 2017-03-09 | Packing Device Capped w/Cement | 902.00 | 1000.00 | 0 |
| 1981-01-13 | Perforation | 1199.00 | 1201.00 | 13 |
| 1981-01-15 | Cement Squeeze | 1199.00 | 1201.00 | 0 |
| 1981-01-18 | Perforation | 1166.80 | 1170.00 | 13 |
| 1981-01-20 | Cement Squeeze | 1166.80 | 1170.00 | 0 |
| 1981-01-21 | Perforation | 1010.50 | 1011.50 | 13 |
| 2001-08-20 | Perforation | 1010.00 | 1012.00 | 17 |
| 2001-11-22 | Cement Squeeze | 1010.00 | 1012.00 | 0 |
| 2001-11-30 | Perforation | 1231.00 | 1234.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 941 | 0.0 | 0.0 | 0.0 |
| 2002 | 8023 | 0.0 | 0.0 | 0.0 |
| 2003 | 6981 | 0.0 | 0.0 | 0.0 |
| 2004 | 8730 | 0.0 | 0.0 | 0.0 |
| 2005 | 6022 | 0.0 | 0.0 | 0.0 |
| 2006 | 1254 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-03-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]