X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524260712000

Well Details

Well ID: 0524260712000
Loading map...
Location: 00/12-07-052-26W4/0
Location Alias: 00/12-07-52-26 W4M
Location Alias 2: 00/12-07-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 07
County/Municipality: Parkland County
Well Name: SUMMIT ET AL N GSPIKE 12-7-52-26
Operator Name: Paramount Resources Ltd.
License Number: 0051410
License Date: 1974-10-08
License Status: RecCertified
Spud Date: 1974-10-08
Final Drill Date: 1974-10-15
Well Total Depth: 1396.90 m
Surface Hole Latitude: 53.477759
Surface Hole Longitude: -113.832600

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-08 Obtained License
1974-10-15 Finished Drilling
1974-10-15 Well Mode changed to Drilled and Cased
1974-10-16 Drill Stem Test Performed
1974-10-17 Drill Stem Test Performed
1974-10-18 Perforation Treatment Performed - Open-Hole Completion
1974-10-18 Production Casing Operation Performed
1974-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-22 Well Began Production
1974-11-22 Well Fluid changed to Crude Oil
1974-11-22 Well Mode changed to Flowing
1974-11-27 Well Fluid changed to Crude Oil
1974-11-27 Well Mode changed to Suspended
1976-01-10 Perforation Treatment Performed - Jet Perforation
1976-01-10 Well Log Performed
1976-01-11 Perforation Treatment Performed - Cement Squeeze
1976-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-13 Perforation Treatment Performed - Jet Perforation
1976-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-15 Perforation Treatment Performed - Cement Plug
1976-01-19 Well Abandoned
1976-01-19 Well Fluid changed to Crude Oil
1976-01-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-18 Open Hole/Barefoot Completion 1386.50 1396.90 0
1974-11-16 Acid Treatment 1386.50 1396.90 0
1976-01-10 Perforation 1380.10 1381.00 7
1976-01-11 Cement Squeeze 1386.50 1396.90 0
1976-01-12 Acid Treatment 1380.10 1381.00 0
1976-01-13 Perforation 1326.20 1326.80 7
1976-01-14 Acid Treatment 1326.20 1326.80 0
1976-01-15 Cement Plug 1274.70 1383.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 120 0.0 0.0 0.0
1975 768 0.0 0.0 0.0

For data sources see[5]

References