X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524261806000

Well Details

Well ID: 0524261806000
Loading map...
Location: 00/06-18-052-26W4/0
Location Alias: 00/06-18-52-26 W4M
Location Alias 2: 00/06-18-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 18
County/Municipality: Parkland County
Well Name: CEDAR CREEK GSPIKE 6-18-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0221328
License Date: 1999-02-08
License Status: Suspension
Spud Date: 1999-02-16
Final Drill Date: 1999-02-22
Well Total Depth: 1441.00 m
Surface Hole Latitude: 53.489645
Surface Hole Longitude: -113.819358

For data sources see[1][2]

Well History

Date Event
1999-02-08 Obtained License
1999-02-17 Surface Casing Operation Performed
1999-02-18 Direction Drilling Operation Performed - Deviate
1999-02-22 Finished Drilling
1999-02-23 Production Casing Operation Performed
1999-02-23 Well Log Performed
1999-02-24 Rig Released
1999-02-24 Well Mode changed to Drilled and Cased
1999-03-04 Well Log Performed
1999-06-22 Perforation Treatment Performed - Jet Perforation
1999-06-22 Well Log Performed
1999-08-11 Well Began Production
1999-08-11 Well Fluid changed to Gas
1999-08-11 Well Mode changed to Flowing
2003-12-03 Perforation Treatment Performed - Jet Perforation
2003-12-03 Well Log Performed
2003-12-05 Perforation Treatment Performed - Fractured
2006-02-09 Perforation Treatment Performed - Chemical Squeeze
2011-06-14 Perforation Treatment Performed - Chemical Squeeze
2011-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-04-01 Well Fluid changed to Gas
2016-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-02-18 483.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-06-22 Perforation 1358.00 1359.00 14
2003-12-03 Perforation 1358.00 1360.50 20
2003-12-05 Fracture 1358.00 1360.50 0
2006-02-09 Chemical Squeeze 1358.00 1360.50 0
2011-06-14 Chemical Squeeze 1358.00 1360.50 0
2011-06-22 Acid Treatment 1358.00 1360.50 0
2012-01-25 Acid Treatment 1358.00 1360.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2913 0.0 0.0 0.0
2000 7962 0.0 0.0 0.0
2001 8399 0.0 0.0 0.0
2002 8130 0.0 0.0 0.0
2003 7049 0.0 0.0 0.0
2004 7273 0.0 0.0 0.0
2005 6027 0.0 0.0 0.0
2006 6932 0.0 0.0 0.0
2007 8414 0.0 0.0 0.0
2008 7407 0.0 0.0 0.0
2009 8563 0.0 0.0 0.0
2010 8457 0.0 0.0 0.0
2011 7030 0.0 0.0 0.0
2012 7824 0.0 0.0 0.0
2013 8504 0.0 0.0 0.0
2014 7180 0.0 0.0 0.0

For data sources see[6]

References