X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262605003

Well Details

Well ID: 0524262605003
Loading map...
Location: 00/05-26-052-26W4/3
Location Alias: 00/05-26-52-26 W4M
Location Alias 2: 00/05-26-052-26 W4/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 26
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 5-26-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003331
License Date: 1951-08-16
License Status: Suspension
Spud Date: 1951-08-17
Final Drill Date: 1951-09-09
Well Total Depth: 1589.10 m
Surface Hole Latitude: 53.517705
Surface Hole Longitude: -113.734825

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-16 Obtained License
1951-09-04 Production Casing Operation Performed
1951-09-09 Finished Drilling
1951-09-09 Perforation Treatment Performed - Open-Hole Completion
1951-09-09 Well Mode changed to Drilled and Cased
1968-06-14 Perforation Treatment Performed - Cement Plug
1968-06-14 Perforation Treatment Performed - Open-Hole Completion
1991-05-06 Perforation Treatment Performed - Open-Hole Completion
1991-05-06 Well Log Performed
1991-08-16 Well Log Performed
1991-11-12 Well Log Performed
1992-02-21 Well Log Performed
1992-05-04 Well Log Performed
1992-05-08 Well Log Performed
1992-05-10 Perforation Treatment Performed - Jet Perforation
1992-05-10 Well Log Performed
1992-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-25 Perforation Treatment Performed - Chemical Squeeze
1992-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-13 Well Log Performed
1993-02-16 Well Log Performed
1993-05-06 Well Log Performed
1994-03-22 Perforation Treatment Performed - Chemical Squeeze
1996-02-07 Well Log Performed
1996-07-08 Well Log Performed
1997-01-07 Well Log Performed
1997-08-22 Well Log Performed
1998-03-12 Well Log Performed
1998-10-12 Well Log Performed
1999-03-26 Well Log Performed
2000-02-29 Well Log Performed
2001-04-24 Well Log Performed
2001-10-15 Well Log Performed
2002-01-15 Well Log Performed
2002-05-06 Well Log Performed
2002-08-16 Well Log Performed
2004-07-22 Well Log Performed
2005-06-15 Well Log Performed
2005-09-15 Well Log Performed
2007-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-22 Plug Back Performed
2007-10-23 Perforation Treatment Performed - Cement Squeeze
2007-10-23 Plug Back Performed
2007-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-09 Open Hole/Barefoot Completion 1523.70 1555.70 0
2007-10-22 Packing Device Capped w/Cement 1507.00 1515.00 0
2007-10-23 Cement Squeeze 1267.50 1268.50 0
2007-10-26 Perforation 1328.00 1333.00 20
2007-10-26 Acid Treatment 1328.00 1333.00 0
1968-06-14 Cement Plug 1533.80 1555.70 0
1968-06-14 Open Hole/Barefoot Completion 1523.70 1533.80 0
1991-05-06 Open Hole/Barefoot Completion 1523.70 1589.10 0
1992-05-10 Perforation 1267.50 1268.50 13
1992-05-12 Acid Treatment 1267.50 1268.50 0
1992-05-25 Chemical Squeeze 1267.50 1268.50 0
1992-06-02 Acid Treatment 1267.50 1268.50 0
1994-03-22 Chemical Squeeze 1267.50 1589.10 0

For data sources see[4]



References