X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262615003

Well Details

Well ID: 0524262615003
Loading map...
Location: 00/15-26-052-26W4/3
Location Alias: 00/15-26-52-26 W4M
Location Alias 2: 00/15-26-052-26 W4/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 26
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 15-26-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0004416
License Date: 1952-03-22
License Status: Suspension
Spud Date: 1952-04-03
Final Drill Date: 1952-05-05
Well Total Depth: 1555.40 m
Surface Hole Latitude: 53.524872
Surface Hole Longitude: -113.723778

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-22 Obtained License
1952-04-23 Drill Stem Test Performed
1952-04-24 Drill Stem Test Performed
1952-04-25 Drill Stem Test Performed
1952-04-29 Production Casing Operation Performed
1952-05-05 Finished Drilling
1952-05-05 Perforation Treatment Performed - Open-Hole Completion
1982-07-15 Perforation Treatment Performed - Cement Plug
1982-07-15 Perforation Treatment Performed - Open-Hole Completion
1987-07-02 Well Log Performed
1991-02-16 Well Log Performed
1991-02-22 Perforation Treatment Performed - Jet Perforation
1991-02-22 Well Log Performed
1991-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-19 Perforation Treatment Performed - Cement Squeeze
1992-07-19 Plug Back Performed
1992-07-23 Perforation Treatment Performed - Jet Perforation
1992-07-23 Well Log Performed
1992-07-23 Well Mode changed to Drilled and Cased
1992-08-05 Well Began Production
1992-08-05 Well Fluid changed to Crude Oil
1992-08-05 Well Mode changed to Flowing
1993-08-20 Perforation Treatment Performed - Cement Squeeze
1993-08-20 Plug Back Performed
1993-08-20 Well Fluid changed to Crude Oil
1993-08-20 Well Mode changed to Abandoned Zone
1993-08-28 Well Log Performed
1993-08-29 Perforation Treatment Performed - Cement Plug
1993-08-29 Perforation Treatment Performed - Open-Hole Completion
1993-08-30 Perforation Treatment Performed - Cement Squeeze
1997-02-02 Perforation Treatment Performed - Jet Perforation
1997-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-05 Perforation Treatment Performed - Jet Perforation
1997-02-07 Well Log Performed
1997-08-16 Well Log Performed
2006-06-15 Well Log Performed
2006-06-19 Well Log Performed
2006-06-20 Perforation Treatment Performed - Jet Perforation
2006-06-20 Well Log Performed
2009-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-26 Plug Back Performed
2009-08-27 Perforation Treatment Performed - Jet Perforation
2009-08-27 Well Log Performed
2009-08-29 Perforation Treatment Performed - Jet Perforation
2009-08-29 Well Log Performed
2009-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-31 Well Log Performed
2009-09-01 Perforation Treatment Performed - Jet Perforation
2009-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-08 Perforation Treatment Performed - Jet Perforation
2012-11-08 Plug Back Performed
2012-11-08 Well Log Performed
2012-11-09 Perforation Treatment Performed - Fractured
2013-10-15 Well Log Performed
2013-10-16 Perforation Treatment Performed - Jet Perforation
2013-10-17 Perforation Treatment Performed - Jet Perforation
2013-10-22 Perforation Treatment Performed - Jet Perforation
2013-10-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-05 Open Hole/Barefoot Completion 1512.70 1555.40 0
1993-08-29 Cement Plug 1368.40 1420.00 0
1993-08-29 Open Hole/Barefoot Completion 1512.70 1553.80 0
1993-08-30 Cement Squeeze 1512.70 1553.80 0
1997-02-02 Perforation 1545.10 1546.60 14
1997-02-03 Acid Treatment 1545.10 1546.60 0
1997-02-05 Perforation 1542.10 1543.60 14
2006-06-20 Perforation 1521.50 1523.50 20
2009-08-26 Packing Device Capped w/Cement 1502.00 1510.00 0
2009-08-27 Perforation 1443.00 1445.00 20
2009-08-29 Perforation 1435.00 1437.00 20
1982-07-15 Cement Plug 1530.20 1555.40 0
2009-08-31 Packing Device Capped w/Cement 1423.00 1431.00 0
2009-09-01 Perforation 1400.00 1404.00 20
2009-09-02 Acid Treatment 1400.00 1404.00 0
2012-11-08 Packing Device Capped w/Cement 1383.00 1391.00 0
2012-11-08 Perforation 1299.00 1301.00 20
2012-11-09 Fracture 1299.00 1301.00 0
2013-10-16 Perforation 1237.50 1238.30 3
2013-10-17 Perforation 1234.50 1235.90 4
2013-10-17 Perforation 1237.10 1237.50 2
2013-10-17 Perforation 1239.10 1239.90 2
1982-07-15 Open Hole/Barefoot Completion 1512.70 1530.20 0
2013-10-22 Perforation 1225.70 1227.20 17
1991-02-22 Perforation 1225.70 1227.20 13
1991-02-22 Perforation 1236.00 1241.00 13
1991-02-24 Acid Treatment 1225.70 1241.00 0
1992-07-19 Cement Squeeze 1225.70 1241.00 0
1992-07-23 Perforation 1421.00 1422.30 13
1993-08-20 Cement Squeeze 1421.00 1422.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3426 0.0 0.0 0.0
1993 5014 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-27 No Incident Encountered 0.00 0.00
2012-12-06 No Incident Encountered 0.00 0.00
2013-10-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References