X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262709003

Well Details

Well ID: 0524262709003
Loading map...
Location: 00/09-27-052-26W4/3
Location Alias: 00/09-27-52-26 W4M
Location Alias 2: 00/09-27-052-26 W4/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 27
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 9-27-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003711
License Date: 1951-11-01
License Status: Suspension
Spud Date: 1951-11-05
Final Drill Date: 1951-12-10
Well Total Depth: 1556.60 m
Surface Hole Latitude: 53.521257
Surface Hole Longitude: -113.740450

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-01 Obtained License
1951-11-18 Drill Stem Test Performed
1951-11-24 Drill Stem Test Performed
1951-11-25 Drill Stem Test Performed
1951-11-26 Drill Stem Test Performed
1951-11-27 Drill Stem Test Performed
1951-12-07 Production Casing Operation Performed
1951-12-10 Finished Drilling
1951-12-10 Perforation Treatment Performed - Open-Hole Completion
1969-11-07 Perforation Treatment Performed - Open-Hole Completion
1969-11-07 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1976-07-27 Perforation Treatment Performed - Cement Plug
1976-07-28 Perforation Treatment Performed - Jet Perforation
1977-02-25 Perforation Treatment Performed - Cement Plug
1977-03-24 Perforation Treatment Performed - Jet Perforation
1977-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-15 Perforation Treatment Performed - Cement Plug
1984-08-16 Well Log Performed
1984-08-21 Perforation Treatment Performed - Jet Perforation
1984-08-21 Well Log Performed
1985-04-23 Perforation Treatment Performed - Jet Perforation
1990-11-06 Perforation Treatment Performed - Jet Perforation
1990-11-06 Well Mode changed to Drilled and Cased
1990-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-22 Perforation Treatment Performed - Jet Perforation
2002-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-03 Perforation Treatment Performed - Cement Squeeze
2006-03-03 Plug Back Performed
2006-03-10 Perforation Treatment Performed - Jet Perforation
2006-03-12 Perforation Treatment Performed - Fractured
2006-05-04 Well Began Production
2006-05-04 Well Fluid changed to Crude Oil
2006-05-04 Well Mode changed to Pumping
2009-06-29 Well Fluid changed to Crude Oil
2009-06-29 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-12-10 Open Hole/Barefoot Completion 1535.00 1556.60 0
1984-08-21 Perforation 1243.00 1243.60 13
1985-04-23 Perforation 1241.20 1243.60 20
1990-11-06 Perforation 1319.60 1321.80 13
1990-11-09 Acid Treatment 1241.20 1243.60 0
2002-10-22 Perforation 1241.20 1244.40 1
2002-10-28 Acid Treatment 1241.20 1244.40 0
2006-03-03 Cement Squeeze 1241.20 1244.40 0
2006-03-10 Perforation 1332.00 1334.10 20
2006-03-10 Perforation 1328.60 1334.40 20
2006-03-12 Fracture 1328.60 1334.10 0
1969-11-07 Resin-Gypsum Squeeze or Plug 1546.90 1556.60 0
1969-11-07 Open Hole/Barefoot Completion 1535.00 1546.90 0
1976-07-27 Cement Plug 1539.50 1556.60 0
1976-07-28 Perforation 1544.70 1546.60 7
1977-02-25 Cement Plug 1546.60 1547.80 0
1977-03-24 Perforation 1544.70 1546.60 13
1977-03-28 Acid Treatment 1535.00 1546.60 0
1981-09-15 Cement Plug 1491.10 1546.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1047 0.0 0.0 0.0
2007 1252 0.0 0.0 0.0

For data sources see[5]

References