If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524262801032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.513763,"lon":-113.758425,"icon":""}]} |
Location: 03/01-28-052-26W4/2 | |
Location Alias: 03/01-28-52-26 W4M | |
Location Alias 2: 03/01-28-052-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 28 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 1-28-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0169189 | |
License Date: 1994-08-02 | |
License Status: Suspension | |
Spud Date: 1994-09-17 | |
Final Drill Date: 1994-09-26 | |
Well Total Depth: 1661.00 m | |
Surface Hole Latitude: 53.513763 | |
Surface Hole Longitude: -113.758425 |
Date | Event |
---|---|
1994-08-02 | Obtained License |
1994-09-18 | Surface Casing Operation Performed |
1994-09-20 | Direction Drilling Operation Performed - Deviate |
1994-09-26 | Finished Drilling |
1994-09-26 | Well Log Performed |
1994-09-26 | Well Mode changed to Drilled and Cased |
1994-09-30 | Production Casing Operation Performed |
1994-10-01 | Rig Released |
1994-10-03 | Well Log Performed |
1994-10-09 | Perforation Treatment Performed - Open-Hole Completion |
1994-10-13 | Well Log Performed |
1994-10-14 | Perforation Treatment Performed - Cement Plug |
1994-10-15 | Perforation Treatment Performed - Open-Hole Completion |
1994-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-16 | Perforation Treatment Performed - Cement Plug |
1994-12-17 | Perforation Treatment Performed - Open-Hole Completion |
1994-12-19 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2005-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-29 | Plug Back Performed |
2005-09-29 | Well Log Performed |
2005-10-01 | Perforation Treatment Performed - Jet Perforation |
2005-10-01 | Well Log Performed |
2005-12-22 | Well Began Production |
2005-12-22 | Well Fluid changed to Gas |
2005-12-22 | Well Mode changed to Flowing |
2007-09-14 | Perforation Treatment Performed - Jet Perforation |
2007-09-19 | Well Fluid changed to Gas |
2007-09-19 | Well Mode changed to Suspended |
2008-01-06 | Perforation Treatment Performed - Fractured |
2010-01-06 | Perforation Treatment Performed - Jet Perforation |
2010-01-06 | Well Log Performed |
2010-01-09 | Perforation Treatment Performed - Fractured |
2013-01-16 | Perforation Treatment Performed - Jet Perforation |
2013-01-16 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-09-20 | 700.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-10-09 | Open Hole/Barefoot Completion | 1642.00 | 1661.00 | 0 |
2005-10-01 | Perforation | 1381.50 | 1383.00 | 13 |
2007-09-14 | Perforation | 1299.00 | 1302.00 | 20 |
2008-01-06 | Fracture | 1299.00 | 1302.00 | 0 |
2010-01-06 | Perforation | 1230.50 | 1232.50 | 20 |
2010-01-09 | Fracture | 1230.50 | 1232.50 | 0 |
2013-01-16 | Perforation | 1058.50 | 1061.00 | 20 |
2013-01-16 | Perforation | 1047.50 | 1050.50 | 20 |
1994-10-14 | Cement Plug | 1649.50 | 1661.00 | 0 |
1994-10-15 | Open Hole/Barefoot Completion | 1642.00 | 1649.50 | 0 |
1994-10-29 | Acid Treatment | 1642.00 | 1649.50 | 0 |
1994-12-16 | Cement Plug | 1642.00 | 1649.50 | 0 |
1994-12-17 | Open Hole/Barefoot Completion | 1642.00 | 1648.00 | 0 |
1994-12-19 | Hydra Jet Perforation | 1645.00 | 1647.00 | 0 |
2005-09-29 | Packing Device Capped w/Cement | 1627.00 | 1635.00 | 0 |
2005-10-01 | Perforation | 1387.50 | 1390.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 108 | 0.0 | 0.0 | 0.0 |
2006 | 8454 | 0.0 | 0.0 | 0.0 |
2007 | 5349 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]