X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263404032

Well Details

Well ID: 0524263404032
Loading map...
Location: 03/04-34-052-26W4/2
Location Alias: 03/04-34-52-26 W4M
Location Alias 2: 03/04-34-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 34
County/Municipality: Parkland County
Well Name: LEDDY ACHESON 4-34-LM-52-26
Operator Name: Leddy Exploration Limited
License Number: 0075398
License Date: 1979-04-30
License Status: RecCertified
Spud Date: 1979-05-11
Final Drill Date: 1979-05-15
Well Total Depth: 1355.00 m
Surface Hole Latitude: 53.529991
Surface Hole Longitude: -113.758522

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-30 Obtained License
1979-05-15 Finished Drilling
1979-05-15 Well Mode changed to Drilled and Cased
1979-05-16 Production Casing Operation Performed
1979-06-12 Perforation Treatment Performed - Jet Perforation
1979-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-10 Perforation Treatment Performed - Jet Perforation
1990-05-10 Plug Back Performed
1990-06-02 Well Began Production
1990-06-02 Well Fluid changed to Gas
1990-06-02 Well Mode changed to Flowing
1990-07-31 Well Fluid changed to Gas
1990-07-31 Well Mode changed to Suspended
2001-08-28 Well Fluid changed to Crude Oil
2001-08-28 Well Mode changed to Pumping
2007-09-26 Perforation Treatment Performed - Cement Squeeze
2007-09-28 Perforation Treatment Performed - Jet Perforation
2009-09-23 Perforation Treatment Performed - Cement Squeeze
2009-09-23 Plug Back Performed
2009-09-23 Well Fluid changed to Crude Oil
2009-09-23 Well Mode changed to Abandoned Zone
2009-09-25 Perforation Treatment Performed - Jet Perforation
2011-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-09 Plug Back Performed
2011-09-10 Perforation Treatment Performed - Cement Squeeze
2011-09-10 Perforation Treatment Performed - Jet Perforation
2011-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-12 Perforation 1272.00 1274.00 13
2011-09-10 Perforation 308.00 308.50 17
2011-09-10 Cement Squeeze 308.00 308.50 0
1979-06-13 Acid Treatment 1272.00 1274.00 0
1990-05-10 Packing Device Capped w/Cement 1263.00 1271.00 0
1990-05-10 Perforation 1248.50 1250.50 13
2007-09-26 Cement Squeeze 1248.50 1250.50 0
2007-09-28 Perforation 1258.00 1260.00 40
2009-09-23 Cement Squeeze 1258.00 1260.00 0
2009-09-25 Perforation 1246.00 1247.50 17
2011-09-09 Packing Device Capped w/Cement 1232.00 1240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1440 0.0 0.0 0.0
2001 3048 0.0 0.0 0.0
2002 8747 0.0 0.0 0.0
2003 8556 0.0 0.0 0.0
2004 5366 0.0 0.0 0.0
2005 8135 0.0 0.0 0.0
2006 7113 0.0 0.0 0.0
2007 6185 0.0 0.0 0.0

For data sources see[5]

References