If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524263409003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.535694,"lon":-113.741251,"icon":""}]} |
Location: 00/09-34-052-26W4/3 | |
Location Alias: 00/09-34-52-26 W4M | |
Location Alias 2: 00/09-34-052-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 9-34-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0003607 | |
License Date: 1951-10-12 | |
License Status: Suspension | |
Spud Date: 1951-10-11 | |
Final Drill Date: 1951-11-18 | |
Well Total Depth: 1556.00 m | |
Surface Hole Latitude: 53.535694 | |
Surface Hole Longitude: -113.741251 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-10-12 | Obtained License |
1951-11-15 | Production Casing Operation Performed |
1951-11-18 | Finished Drilling |
1951-11-18 | Perforation Treatment Performed - Open-Hole Completion |
1951-11-18 | Well Mode changed to Drilled and Cased |
1974-10-22 | Perforation Treatment Performed - Cement Plug |
1974-10-22 | Perforation Treatment Performed - Open-Hole Completion |
1975-10-02 | Perforation Treatment Performed - Cement Plug |
1975-10-02 | Perforation Treatment Performed - Open-Hole Completion |
1975-10-07 | Perforation Treatment Performed - Open-Hole Completion |
1981-04-21 | Perforation Treatment Performed - Cement Plug |
1981-04-21 | Perforation Treatment Performed - Open-Hole Completion |
1983-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-11-05 | Perforation Treatment Performed - Jet Perforation |
1985-11-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-11-28 | Perforation Treatment Performed - Fractured |
1985-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-12-02 | Plug Back Performed |
1985-12-03 | Perforation Treatment Performed - Jet Perforation |
1985-12-06 | Perforation Treatment Performed - Fractured |
2002-11-07 | Perforation Treatment Performed - Jet Perforation |
2006-03-03 | Perforation Treatment Performed - Cement Squeeze |
2006-03-10 | Perforation Treatment Performed - Jet Perforation |
2006-03-10 | Well Log Performed |
2006-03-11 | Perforation Treatment Performed - Fractured |
2006-04-22 | Well Began Production |
2006-04-22 | Well Fluid changed to Crude Oil |
2006-04-22 | Well Mode changed to Pumping |
2006-10-25 | Perforation Treatment Performed - Jet Perforation |
2006-10-25 | Well Log Performed |
2011-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-07-23 | Plug Back Performed |
2011-07-23 | Well Fluid changed to Crude Oil |
2011-07-23 | Well Mode changed to Abandoned Zone |
2011-07-24 | Perforation Treatment Performed - Jet Perforation |
2011-07-24 | Well Log Performed |
2011-07-25 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-11-18 | Open Hole/Barefoot Completion | 1539.80 | 1556.00 | 0 |
1985-11-05 | Perforation | 1412.50 | 1415.00 | 13 |
1985-11-06 | Acid Treatment | 1412.50 | 1415.00 | 0 |
1985-11-07 | Acid Treatment | 1412.50 | 1415.00 | 0 |
1985-11-28 | Fracture | 1412.50 | 1415.00 | 0 |
1985-12-02 | Packing Device Capped w/Cement | 1393.00 | 1401.00 | 0 |
1985-12-03 | Perforation | 1241.00 | 1243.00 | 20 |
1985-12-06 | Fracture | 1241.00 | 1243.00 | 0 |
2002-11-07 | Perforation | 1243.00 | 1251.60 | 1 |
2006-03-03 | Cement Squeeze | 1241.00 | 1251.60 | 0 |
2006-03-10 | Perforation | 1333.80 | 1336.20 | 20 |
1974-10-22 | Cement Plug | 1546.60 | 1550.50 | 0 |
2006-03-10 | Perforation | 1330.10 | 1332.30 | 20 |
2006-03-11 | Fracture | 1330.10 | 1336.20 | 0 |
2006-10-25 | Perforation | 1321.00 | 1323.00 | 17 |
2011-07-23 | Packing Device Capped w/Cement | 1312.00 | 1320.00 | 0 |
2011-07-24 | Perforation | 1234.70 | 1236.60 | 20 |
2011-07-25 | Fracture | 1234.70 | 1236.60 | 0 |
1974-10-22 | Open Hole/Barefoot Completion | 1539.80 | 1546.60 | 0 |
1975-10-02 | Cement Plug | 1543.50 | 1546.60 | 0 |
1975-10-02 | Open Hole/Barefoot Completion | 1539.80 | 1543.50 | 0 |
1975-10-07 | Open Hole/Barefoot Completion | 1539.80 | 1545.00 | 0 |
1981-04-21 | Cement Plug | 1543.30 | 1545.00 | 0 |
1981-04-21 | Open Hole/Barefoot Completion | 1539.80 | 1543.30 | 0 |
1983-03-12 | Packing Device Capped w/Cement | 1515.00 | 1515.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3912 | 0.0 | 0.0 | 0.0 |
2007 | 8679 | 0.0 | 0.0 | 0.0 |
2008 | 6133 | 0.0 | 0.0 | 0.0 |
2009 | 6049 | 0.0 | 0.0 | 0.0 |
For data sources see[5]