X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263412002

Well Details

Well ID: 0524263412002
Loading map...
Location: 00/12-34-052-26W4/2
Location Alias: 00/12-34-52-26 W4M
Location Alias 2: 00/12-34-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 34
County/Municipality: Parkland County
Well Name: LEDDY ACHESON 12-34-52-26
Operator Name: Leddy Exploration Limited
License Number: 0101166
License Date: 1983-04-18
License Status: RecCertified
Spud Date: 1983-05-16
Final Drill Date: 1983-06-02
Well Total Depth: 1630.00 m
Surface Hole Latitude: 53.536208
Surface Hole Longitude: -113.759808

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-04-18 Obtained License
1983-05-30 Drill Stem Test Performed
1983-05-31 Drill Stem Test Performed
1983-06-01 Drill Stem Test Performed
1983-06-02 Finished Drilling
1983-06-02 Well Mode changed to Drilled and Cased
1983-06-04 Production Casing Operation Performed
1983-07-20 Well Log Performed
1983-07-21 Well Log Performed
1983-07-22 Perforation Treatment Performed - Jet Perforation
1986-08-21 Well Began Production
1986-08-21 Well Fluid changed to Crude Oil
1986-08-21 Well Mode changed to Pumping
1986-08-22 Perforation Treatment Performed - Jet Perforation
1989-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-01 Well Fluid changed to Crude Oil
1992-07-01 Well Mode changed to Suspended
1994-10-06 Well Fluid changed to Crude Oil
1994-10-06 Well Mode changed to Pumping
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Suspended
1997-09-03 Perforation Treatment Performed - Remedial Casing
1997-09-03 Well Fluid changed to Crude Oil
1997-09-03 Well Mode changed to Abandoned Zone
2001-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-22 Plug Back Performed
2001-10-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-07-22 Perforation 1274.00 1276.50 13
1986-08-22 Perforation 1243.00 1244.00 13
1986-08-22 Perforation 1245.00 1247.00 13
1989-05-11 Acid Treatment 1243.00 1247.00 0
1989-05-13 Acid Treatment 1243.00 1247.00 0
1997-09-03 Remedial Casing Cementing 1243.00 1247.00 0
2001-08-22 Packing Device Capped w/Cement 1241.00 1249.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2180 0.0 0.0 0.0
1987 7624 0.0 0.0 0.0
1988 5492 0.0 0.0 0.0
1989 4938 0.0 0.0 0.0
1990 7337 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 4367 0.0 0.0 0.0
1994 2088 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 4527 0.0 0.0 0.0

For data sources see[5]

References