X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263503002

Well Details

Well ID: 0524263503002
Loading map...
Location: 00/03-35-052-26W4/2
Location Alias: 00/03-35-52-26 W4M
Location Alias 2: 00/03-35-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 35
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 3-35-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003572
License Date: 1951-10-04
License Status: Suspension
Spud Date: 1951-10-05
Final Drill Date: 1952-02-01
Well Total Depth: 1593.00 m
Surface Hole Latitude: 53.528492
Surface Hole Longitude: -113.728782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-04 Obtained License
1951-11-24 Liner Casing Operation Performed
1952-02-01 Finished Drilling
1952-02-01 Lost Circulation Occurred
1952-02-01 Well Mode changed to Drilled and Cased
1952-02-06 Perforation Treatment Performed - Bullet Perforation
1982-10-13 Perforation Treatment Performed - Jet Perforation
1989-02-11 Perforation Treatment Performed - Cement Squeeze
1989-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-17 Well Log Performed
1989-03-24 Perforation Treatment Performed - Jet Perforation
1989-03-24 Well Log Performed
1989-03-25 Well Log Performed
1992-10-06 Well Log Performed
1992-10-07 Perforation Treatment Performed - Jet Perforation
1992-10-10 Perforation Treatment Performed - Cement Squeeze
1992-10-13 Perforation Treatment Performed - Open-Hole Completion
1992-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-14 Perforation Treatment Performed - Jet Perforation
1992-10-14 Well Log Performed
1992-10-15 Perforation Treatment Performed - Jet Perforation
1992-10-15 Well Log Performed
1992-10-30 Well Began Production
1992-10-30 Well Fluid changed to Crude Oil
1992-10-30 Well Mode changed to Flowing
1997-01-17 Well Log Performed
1997-02-14 Well Fluid changed to Crude Oil
1997-02-14 Well Mode changed to Suspended
1997-03-17 Well Log Performed
2007-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-09 Perforation Treatment Performed - Cement Plug
2007-10-09 Plug Back Performed
2007-10-10 Perforation Treatment Performed - Jet Perforation
2007-10-11 Perforation Treatment Performed - Fractured
2013-09-15 Perforation Treatment Performed - Cement Squeeze
2013-09-15 Plug Back Performed
2013-09-18 Perforation Treatment Performed - Jet Perforation
2013-09-19 Perforation Treatment Performed - Jet Perforation
2013-10-10 Well Fluid changed to Crude Oil
2013-10-10 Well Mode changed to Pumping
2017-10-23 Well Fluid changed to Crude Oil
2017-10-23 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-06 Bullet Perforation 1548.40 1553.90 13
1992-10-14 Perforation 1540.20 1540.70 20
1992-10-14 Perforation 1542.40 1542.90 20
1992-10-14 Perforation 1544.60 1545.10 20
1992-10-14 Perforation 1546.80 1547.30 20
1992-10-14 Perforation 1549.00 1549.50 20
1992-10-14 Perforation 1551.20 1551.70 20
1992-10-14 Perforation 1553.40 1553.90 20
1992-10-14 Perforation 1555.60 1556.10 20
1992-10-14 Perforation 1557.80 1558.30 20
1992-10-14 Acid Treatment 1538.00 1558.30 0
1982-10-13 Perforation 1538.00 1539.00 13
1992-10-15 Perforation 1262.50 1264.00 13
2007-10-09 Packing Device Capped w/Cement 1523.00 1531.00 0
2007-10-09 Cement Plug 1375.00 1440.00 0
2007-10-10 Perforation 1226.00 1228.00 20
2007-10-11 Fracture 1226.00 1228.00 0
2013-09-15 Cement Squeeze 1226.00 1264.00 0
2013-09-18 Perforation 1254.20 1255.40 4
2013-09-19 Perforation 1253.00 1255.30 4
1989-02-11 Cement Squeeze 1538.00 1539.00 0
1989-02-16 Acid Treatment 1548.40 1553.90 0
1989-03-24 Perforation 1540.50 1542.30 13
1992-10-07 Perforation 1540.50 1542.30 20
1992-10-10 Cement Squeeze 1548.40 1553.90 0
1992-10-13 Open Hole/Barefoot Completion 1558.70 1593.00 0
1992-10-14 Perforation 1538.00 1538.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1494 0.0 0.0 0.0
1993 7413 0.0 0.0 0.0
1994 6420 0.0 0.0 0.0
1995 2582 0.0 0.0 0.0
1996 12 0.0 0.0 0.0
2013 1968 0.0 0.0 0.0
2014 8323 0.0 0.0 0.0
2015 8458 0.0 0.0 0.0
2016 5927 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-02-01 Lost Circulation 1007.40 1007.40
1952-02-01 Lost Circulation 1450.80 1450.80
2013-09-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References