X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263507020

Well Details

Well ID: 0524263507020
Loading map...
Location: 02/07-35-052-26W4/0
Location Alias: 02/07-35-52-26 W4M
Location Alias 2: 02/07-35-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 35
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 7-35-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0009322
License Date: 1955-03-23
License Status: Suspension
Spud Date: 1955-03-26
Final Drill Date: 1955-04-23
Well Total Depth: 1325.90 m
Surface Hole Latitude: 53.532381
Surface Hole Longitude: -113.723696

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-03-23 Obtained License
1955-04-05 Drill Stem Test Performed
1955-04-06 Drill Stem Test Performed
1955-04-11 Drill Stem Test Performed
1955-04-12 Drill Stem Test Performed
1955-04-13 Drill Stem Test Performed
1955-04-14 Drill Stem Test Performed
1955-04-15 Drill Stem Test Performed
1955-04-16 Drill Stem Test Performed
1955-04-19 Drill Stem Test Performed
1955-04-20 Drill Stem Test Performed
1955-04-21 Drill Stem Test Performed
1955-04-23 Finished Drilling
1955-04-23 Well Mode changed to Drilled and Cased
1955-04-26 Production Casing Operation Performed
1955-04-28 Perforation Treatment Performed - Bullet Perforation
1955-04-28 Perforation Treatment Performed - Jet Perforation
1955-05-09 Well Began Production
1955-05-09 Well Fluid changed to Crude Oil
1955-05-09 Well Mode changed to Pumping
1956-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-11-27 Well Fluid changed to Crude Oil
1957-11-27 Well Mode changed to Suspended
1961-08-17 Drill Stem Test Performed
1961-08-18 Perforation Treatment Performed - Cement Squeeze
1961-08-18 Well Fluid changed to Crude Oil
1961-08-18 Well Mode changed to Abandoned Zone
1983-12-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1983-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-17 Perforation Treatment Performed - Jet Perforation
1988-10-17 Perforation Treatment Performed - Jet Perforation
1988-10-17 Well Log Performed
1991-02-14 Perforation Treatment Performed - Jet Perforation
1993-12-17 Well Log Performed
2006-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-04-18 Plug Back Performed
2006-04-19 Perforation Treatment Performed - Jet Perforation
2006-05-23 Perforation Treatment Performed - Fractured
2009-08-17 Well Log Performed
2009-08-18 Perforation Treatment Performed - Jet Perforation
2009-08-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-04-28 Bullet Perforation 1261.30 1262.50 13
1991-02-14 Perforation 1237.30 1243.80 13
2006-04-18 Packing Device Capped w/Cement 1217.00 1225.00 0
2006-04-19 Perforation 1051.60 1055.20 20
2006-05-23 Fracture 1051.60 1055.20 0
2009-08-18 Perforation 1173.00 1175.00 20
2009-08-19 Fracture 1173.00 1175.00 0
1955-04-28 Perforation 1261.30 1262.50 13
1956-05-30 Acid Treatment 1261.30 1262.50 0
1961-08-18 Cement Squeeze 1261.30 1262.50 0
1983-12-20 Hydra Jet Perforation 1244.20 1245.10 0
1983-12-20 Acid Treatment 1244.20 1245.10 0
1984-12-12 Acid Treatment 1244.20 1245.10 0
1984-12-17 Perforation 1245.80 1246.80 13
1988-10-17 Perforation 1239.00 1241.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References