X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525053216000

Well Details

Well ID: 0525053216000
Loading map...
Location: 00/16-32-052-05W5/0
Location Alias: 00/16-32-52-05 W5M
Location Alias 2: 00/16-32-052-05 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 05
Section: 32
County/Municipality: Parkland County
Well Name: HORSESHOE BAY TOMHK 16-32-52-5
Operator Name: Insch Commodity Ltd.
License Number: 0123302
License Date: 1986-06-13
License Status: Suspension
Spud Date: 1986-06-18
Final Drill Date: 1986-06-24
Well Total Depth: 1590.00 m
Surface Hole Latitude: 53.539677
Surface Hole Longitude: -114.695252

For data sources see[1][2]

Well History

Date Event
1986-06-13 Obtained License
1986-06-19 Surface Casing Operation Performed
1986-06-24 Finished Drilling
1986-06-24 Well Mode changed to Drilled and Cased
1986-06-25 Well Log Performed
1986-06-26 Production Casing Operation Performed
1986-06-26 Rig Released
1986-07-29 Perforation Treatment Performed - Jet Perforation
1986-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-03 Well Began Production
1986-09-03 Well Fluid changed to Crude Oil
1986-09-03 Well Mode changed to Pumping
1986-12-14 Perforation Treatment Performed - Fractured
2010-10-30 Perforation Treatment Performed - Jet Perforation
2010-11-06 Perforation Treatment Performed - Fractured
2010-11-07 Perforation Treatment Performed - Fractured
2011-01-30 Well Fluid changed to Crude Oil
2011-01-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-07-29 Perforation 1541.40 1545.40 13
1986-07-30 Acid Treatment 1541.40 1545.40 0
1986-12-14 Fracture 1541.40 1545.40 0
2010-10-30 Perforation 1541.50 1545.50 17
2010-10-30 Perforation 1530.00 1533.50 17
2010-11-06 Fracture 1541.50 1545.50 0
2010-11-07 Fracture 1530.00 1533.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2522 0.0 0.0 0.0
1987 7312 0.0 0.0 0.0
1988 8543 0.0 0.0 0.0
1989 8597 0.0 0.0 0.0
1990 8445 0.0 0.0 0.0
1991 7292 0.0 0.0 0.0
1992 7443 0.0 0.0 0.0
1993 8393 0.0 0.0 0.0
1994 8705 0.0 0.0 0.0
1995 8254 0.0 0.0 0.0
1996 8697 0.0 0.0 0.0
1997 8730 0.0 0.0 0.0
1998 8749 0.0 0.0 0.0
1999 8714 0.0 0.0 0.0
2000 8727 0.0 0.0 0.0
2001 8755 0.0 0.0 0.0
2002 8741 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8751 0.0 0.0 0.0
2005 8127 0.0 0.0 0.0
2006 8758 0.0 0.0 0.0
2007 7342 0.0 0.0 0.0
2008 8505 0.0 0.0 0.0
2009 4726 0.0 0.0 0.0
2010 8149 0.0 0.0 0.0
2011 744 0.0 0.0 0.0

For data sources see[5]

References