If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525063014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.523775,"lon":-114.874377,"icon":""}]} |
Location: 00/14-30-052-06W5/0 | |
Location Alias: 00/14-30-52-06 W5M | |
Location Alias 2: 00/14-30-052-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 06 | |
Section: 30 | |
County/Municipality: Parkland County | |
Well Name: GEOCAN ET AL TOMAHAWK 14-30-52-6 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0143104 | |
License Date: 1990-02-05 | |
License Status: Suspension | |
Spud Date: 1990-02-20 | |
Final Drill Date: 1990-02-26 | |
Well Total Depth: 1725.00 m | |
Surface Hole Latitude: 53.523775 | |
Surface Hole Longitude: -114.874377 |
Date | Event |
---|---|
1990-02-05 | Obtained License |
1990-02-20 | Lost Circulation Occurred |
1990-02-22 | Surface Casing Operation Performed |
1990-02-26 | Finished Drilling |
1990-02-26 | Well Log Performed |
1990-02-26 | Well Mode changed to Drilled and Cased |
1990-03-02 | Production Casing Operation Performed |
1990-03-02 | Rig Released |
1990-03-07 | Well Log Performed |
1990-03-08 | Perforation Treatment Performed - Jet Perforation |
1990-03-08 | Well Log Performed |
1990-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-03-09 | Perforation Treatment Performed - Jet Perforation |
1990-03-09 | Plug Back Performed |
1990-03-09 | Well Log Performed |
1990-03-11 | Perforation Treatment Performed - Jet Perforation |
1990-03-11 | Well Log Performed |
1990-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-15 | Well Log Performed |
1990-04-12 | Well Began Production |
1990-04-12 | Well Fluid changed to Crude Oil |
1990-04-12 | Well Mode changed to Pumping |
1990-12-15 | Well Log Performed |
1990-12-17 | Perforation Treatment Performed - Jet Perforation |
1990-12-17 | Well Log Performed |
1990-12-19 | Perforation Treatment Performed - Cement Squeeze |
1990-12-22 | Perforation Treatment Performed - Jet Perforation |
1990-12-22 | Well Log Performed |
2003-10-17 | Perforation Treatment Performed - Cement Squeeze |
2003-10-17 | Plug Back Performed |
2003-10-17 | Well Fluid changed to Crude Oil |
2003-10-17 | Well Mode changed to Abandoned Zone |
2003-10-24 | Perforation Treatment Performed - Jet Perforation |
2003-10-26 | Perforation Treatment Performed - Fractured |
2003-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-10-31 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-03-08 | Perforation | 1680.00 | 1681.50 | 13 |
1990-12-22 | Perforation | 1664.60 | 1665.60 | 13 |
1990-12-22 | Perforation | 1667.50 | 1668.50 | 13 |
2003-10-17 | Cement Squeeze | 1661.30 | 1668.50 | 0 |
2003-10-24 | Perforation | 1688.00 | 1690.00 | 17 |
2003-10-24 | Perforation | 1691.00 | 1692.00 | 17 |
2003-10-26 | Fracture | 1688.00 | 1692.00 | 0 |
2003-10-31 | Packing Device Capped w/Cement | 1677.00 | 1685.00 | 0 |
1990-03-09 | Packing Device Capped w/Cement | 1676.00 | 1679.00 | 0 |
1990-03-09 | Perforation | 1667.50 | 1668.50 | 13 |
1990-03-11 | Perforation | 1661.50 | 1662.50 | 13 |
1990-03-11 | Perforation | 1664.70 | 1665.80 | 13 |
1990-03-12 | Acid Treatment | 1661.50 | 1665.80 | 0 |
1990-12-17 | Perforation | 1671.50 | 1672.50 | 13 |
1990-12-19 | Cement Squeeze | 1661.50 | 1672.50 | 0 |
1990-12-22 | Perforation | 1661.30 | 1662.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 5737 | 0.0 | 0.0 | 0.0 |
1991 | 8534 | 0.0 | 0.0 | 0.0 |
1992 | 7700 | 0.0 | 0.0 | 0.0 |
1993 | 7110 | 0.0 | 0.0 | 0.0 |
1994 | 8686 | 0.0 | 0.0 | 0.0 |
1995 | 8455 | 0.0 | 0.0 | 0.0 |
1996 | 8372 | 0.0 | 0.0 | 0.0 |
1997 | 8571 | 0.0 | 0.0 | 0.0 |
1998 | 8723 | 0.0 | 0.0 | 0.0 |
1999 | 8079 | 0.0 | 0.0 | 0.0 |
2000 | 7143 | 0.0 | 0.0 | 0.0 |
2001 | 8019 | 0.0 | 0.0 | 0.0 |
2002 | 217 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-02-20 | Lost Circulation | 36.00 | 323.00 |
For data sources see[6]