If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525161104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.458807,"lon":-116.240978,"icon":""}]} |
Location: 00/04-11-052-16W5/0 | |
Location Alias: 00/04-11-52-16 W5M | |
Location Alias 2: 00/04-11-052-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 16 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: POC EDSON 4-11-52-16 | |
Operator Name: Perpetual Operating Corp. | |
License Number: 0468311 | |
License Date: 2014-07-18 | |
License Status: Issued | |
Spud Date: 2014-07-27 | |
Final Drill Date: 2014-08-11 | |
Well Total Depth: 4104.00 m | |
Surface Hole Latitude: 53.458807 | |
Surface Hole Longitude: -116.240978 |
Date | Event |
---|---|
2013-08-11 | Well Log Performed |
2014-07-18 | Obtained License |
2014-07-29 | Surface Casing Operation Performed |
2014-08-02 | Direction Drilling Operation Performed - Deviate |
2014-08-03 | Direction Drilling Operation Performed - Horizontal |
2014-08-04 | Intermediate Casing Operation Performed |
2014-08-11 | Finished Drilling |
2014-08-11 | Well Mode changed to Drilled and Cased |
2014-08-16 | Liner Casing Operation Performed |
2014-08-16 | Perforation Treatment Performed - Open-Hole Completion |
2014-08-17 | Rig Released |
2014-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-07 | Well Began Production |
2014-09-07 | Well Fluid changed to Gas |
2014-09-07 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-07-27 | Ironhand Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-08-02 | 2210.70 | Deviate (5 - 79 degrees) |
2014-08-03 | 2608.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-16 | Open Hole/Barefoot Completion | 4080.00 | 4104.00 | 0 |
2014-09-03 | Multi-Stage Fracture | 3341.20 | 3341.30 | 0 |
2014-09-03 | Multi-Stage Fracture | 3259.90 | 3260.00 | 0 |
2014-09-03 | Multi-Stage Fracture | 3167.80 | 3167.90 | 0 |
2014-09-03 | Multi-Stage Fracture | 3075.60 | 3075.70 | 0 |
2014-09-03 | Multi-Stage Fracture | 2983.10 | 2983.20 | 0 |
2014-09-03 | Multi-Stage Fracture | 2891.10 | 2891.20 | 0 |
2014-09-03 | Multi-Stage Fracture | 2810.20 | 2810.30 | 0 |
2014-09-03 | Multi-Stage Fracture | 2718.50 | 2718.60 | 0 |
2014-09-02 | Multi-Stage Fracture | 4059.80 | 4059.90 | 0 |
2014-09-02 | Multi-Stage Fracture | 3977.70 | 3977.80 | 0 |
2014-09-02 | Multi-Stage Fracture | 3885.40 | 3885.50 | 0 |
2014-09-02 | Multi-Stage Fracture | 3793.10 | 3793.20 | 0 |
2014-09-02 | Multi-Stage Fracture | 3700.20 | 3700.30 | 0 |
2014-09-03 | Multi-Stage Fracture | 3619.30 | 3619.40 | 0 |
2014-09-03 | Multi-Stage Fracture | 3526.50 | 3526.60 | 0 |
2014-09-03 | Multi-Stage Fracture | 3433.80 | 3433.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-02 | 2014-09-02 | 2,479 | 0 | N/A |
2 | 2014-09-02 | 2014-09-03 | 2,479 | 5,771 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 2.8491 | N/A | |||
2 | Water | Not Available | 100 | 83.2306 | N/A | |||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 7.4584 | N/A | ||
50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 1.1732 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.009 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.009 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1631 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1631 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0828 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0828 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0828 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-09-02 | 2014-10-13 | Surface Water - Lake | 5552 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2509 | 0.0 | 0.0 | 0.0 |
2015 | 3408 | 0.0 | 0.0 | 0.0 |
2016 | 8207 | 0.0 | 0.0 | 0.0 |
2017 | 8639 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-08-17 | No Incident Encountered | 0.00 | 0.00 |
2014-09-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]