X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525180909020

Well Details

Well ID: 0525180909020
Loading map...
Location: 02/09-09-052-18W5/0
Location Alias: 02/09-09-52-18 W5M
Location Alias 2: 02/09-09-052-18 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 18
Section: 09
County/Municipality: Yellowhead County
Well Name: ROGCI 02 HZ EDSON 9-9-52-18
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0485979
License Date: 2017-10-24
License Status: Issued
Spud Date: 2017-11-28
Final Drill Date: 2017-12-21
Well Total Depth: 5537.00 m
Surface Hole Latitude: 53.453125
Surface Hole Longitude: -116.594523

For data sources see[1][2]

Well History

Date Event
2017-10-24 Obtained License
2017-11-28 Lost Circulation Occurred
2017-12-01 Surface Casing Operation Performed
2017-12-02 Direction Drilling Operation Performed - Deviate
2017-12-07 Direction Drilling Operation Performed - Horizontal
2017-12-08 Well Log Performed
2017-12-10 Intermediate Casing Operation Performed
2017-12-12 Kick Occurred
2017-12-21 Finished Drilling
2017-12-21 Well Log Performed
2017-12-21 Well Mode changed to Drilled and Cased
2017-12-23 Production Casing Operation Performed
2017-12-24 Perforation Treatment Performed - Open-Hole Completion
2017-12-24 Rig Released
2018-03-01 Well Log Performed
2018-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-15 Well Fluid changed to Gas
2018-03-15 Well Mode changed to Testing
2018-04-16 Well Began Production
2018-04-16 Well Fluid changed to Gas
2018-04-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-28 Precision Drilling Corporation 231 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-02 1027.10 Deviate (5 - 79 degrees)
2017-12-07 2891.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-24 Open Hole/Barefoot Completion 5522.00 5537.00 0
2018-03-11 Multi-Stage Fracture 4901.40 4901.50 0
2018-03-11 Multi-Stage Fracture 4829.50 4829.60 0
2018-03-11 Multi-Stage Fracture 4756.70 4756.80 0
2018-03-11 Multi-Stage Fracture 4684.00 4684.10 0
2018-03-11 Multi-Stage Fracture 4612.00 4612.10 0
2018-03-11 Multi-Stage Fracture 4539.20 4539.30 0
2018-03-11 Multi-Stage Fracture 4466.20 4466.30 0
2018-03-12 Multi-Stage Fracture 4393.10 4393.20 0
2018-03-12 Multi-Stage Fracture 4319.90 4320.00 0
2018-03-12 Multi-Stage Fracture 4249.40 4249.50 0
2018-03-11 Multi-Stage Fracture 5482.10 5482.20 0
2018-03-12 Multi-Stage Fracture 4177.40 4177.50 0
2018-03-12 Multi-Stage Fracture 4104.80 4104.90 0
2018-03-12 Multi-Stage Fracture 4019.50 4019.60 0
2018-03-12 Multi-Stage Fracture 3948.60 3948.70 0
2018-03-12 Multi-Stage Fracture 3879.90 3880.00 0
2018-03-12 Multi-Stage Fracture 3809.70 3809.80 0
2018-03-12 Multi-Stage Fracture 3738.20 3738.30 0
2018-03-12 Multi-Stage Fracture 3665.40 3665.50 0
2018-03-12 Multi-Stage Fracture 3594.70 3594.80 0
2018-03-12 Multi-Stage Fracture 3522.70 3522.80 0
2018-03-11 Multi-Stage Fracture 5437.70 5437.80 0
2018-03-12 Multi-Stage Fracture 3449.20 3449.30 0
2018-03-12 Multi-Stage Fracture 3378.60 3378.70 0
2018-03-12 Multi-Stage Fracture 3305.80 3305.90 0
2018-03-12 Multi-Stage Fracture 3233.30 3233.40 0
2018-03-12 Multi-Stage Fracture 3160.00 3160.10 0
2018-03-12 Multi-Stage Fracture 3075.80 3075.90 0
2018-03-12 Multi-Stage Fracture 3017.00 3017.10 0
2018-03-11 Multi-Stage Fracture 5350.60 5350.70 0
2018-03-11 Multi-Stage Fracture 5264.00 5264.10 0
2018-03-11 Multi-Stage Fracture 5190.90 5191.00 0
2018-03-11 Multi-Stage Fracture 5118.30 5118.40 0
2018-03-11 Multi-Stage Fracture 5046.10 5046.20 0
2018-03-11 Multi-Stage Fracture 4974.20 4974.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-11 2018-03-12 2,712 12,480 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.2884 N/A
30/50 CRC Halliburton Crystalline silica. quartz 14808-60-7 100 3.507 N/A
Hexamethylenetetramine 100-97-0 100 3.507 N/A
Phenol / formaldehyde resin 9003-35-4 100 3.507 N/A
30/50 Premium Halliburton Crystalline silica. quartz 14808-60-7 100 12.859 N/A
40/70 Domestic Halliburton Crystalline silica. quartz 14808-60-7 100 1.169 N/A
MC B-8642 Mutli-Chem Bactericide/Biocide Ethanol 64-17-5 100 0.011 N/A
Glutaraldehyde 111-30-8 100 0.011 N/A
Inert Ingredient(s) Not Available 100 0.011 N/A
Phosphoric acid 7664-38-2 100 0.011 N/A
Quaternary ammonium compounds.benzyl-C12-16-alkyldimethyl.
chlorides
68424-85-1 100 0.011 N/A
Cla-Web Halliburton Clay Control Inert Ingredient(s) Not Available 100 0.0677 N/A
Proprietary Trade Secret 100 0.0677 N/A
Excelerate PS-2 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 100 0.0496 N/A
Inert Ingredient(s) Not Available 100 0.0496 N/A
Proprietary Trade Secret 100 0.0496 N/A
MC S-2730 Multi-Chem Scale Inhibitor Inert Ingredient(s) Not Available 100 0.0104 N/A
Methanol 67-56-1 100 0.0104 N/A
Sodium chloride 7647-14-5 100 0.0104 N/A
OilPerm A Halliburton Surfactant Ethanol 64-17-5 100 0.0375 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0375 N/A
Inert Ingredient(s) Not Available 100 0.0375 N/A
Naphthalene 91-20-3 100 0.0375 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.branche
d
127087-87-0 100 0.0375 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-01 2018-03-06 Municipal Water 189
2018-03-06 2018-03-13 Central Water Distribution Facility 11920

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5814 0.0 0.0 0.0
2019 8175 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-28 Lost Circulation 80.00 150.00
2017-12-12 Kick 3843.00 3843.00
2018-03-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References