If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525191613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.481606,"lon":-116.753457,"icon":""}]} |
Location: 00/13-16-052-19W5/0 | |
Location Alias: 00/13-16-52-19 W5M | |
Location Alias 2: 00/13-16-052-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 19 | |
Section: 16 | |
County/Municipality: Yellowhead County | |
Well Name: PEYTO ANSELL 13-16-52-19 | |
Operator Name: Peyto Exploration & Development Corp. | |
License Number: 0483442 | |
License Date: 2017-04-21 | |
License Status: Issued | |
Spud Date: 2017-10-15 | |
Final Drill Date: 2017-10-27 | |
Well Total Depth: 4295.00 m | |
Surface Hole Latitude: 53.481606 | |
Surface Hole Longitude: -116.753457 |
Date | Event |
---|---|
2017-04-21 | Obtained License |
2017-10-15 | Surface Casing Operation Performed |
2017-10-21 | Direction Drilling Operation Performed - Deviate |
2017-10-23 | Well Log Performed |
2017-10-24 | Intermediate Casing Operation Performed |
2017-10-25 | Direction Drilling Operation Performed - Horizontal |
2017-10-27 | Finished Drilling |
2017-10-27 | Well Log Performed |
2017-10-27 | Well Mode changed to Drilled and Cased |
2017-10-28 | Liner Casing Operation Performed |
2017-10-28 | Perforation Treatment Performed - Open-Hole Completion |
2017-10-29 | Rig Released |
2017-11-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-09 | Well Began Production |
2017-11-09 | Well Fluid changed to Gas |
2017-11-09 | Well Mode changed to Flowing |
2017-12-14 | Well Fluid changed to Gas |
2017-12-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-10-15 | Trinidad Drilling Ltd. | 434 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-10-21 | 2335.00 | Deviate (5 - 79 degrees) |
2017-10-25 | 3069.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-10-28 | Open Hole/Barefoot Completion | 4260.00 | 4295.00 | 0 |
2017-11-08 | Multi-Stage Fracture | 3415.30 | 3415.40 | 0 |
2017-11-08 | Multi-Stage Fracture | 3319.50 | 3319.60 | 0 |
2017-11-08 | Multi-Stage Fracture | 3213.10 | 3213.20 | 0 |
2017-11-08 | Multi-Stage Fracture | 3107.00 | 3107.10 | 0 |
2017-11-08 | Multi-Stage Fracture | 4242.80 | 4242.90 | 0 |
2017-11-08 | Multi-Stage Fracture | 4159.90 | 4160.00 | 0 |
2017-11-08 | Multi-Stage Fracture | 4052.10 | 4052.20 | 0 |
2017-11-08 | Multi-Stage Fracture | 3970.50 | 3970.60 | 0 |
2017-11-08 | Multi-Stage Fracture | 3834.10 | 3834.20 | 0 |
2017-11-08 | Multi-Stage Fracture | 3738.30 | 3738.40 | 0 |
2017-11-08 | Multi-Stage Fracture | 3615.30 | 3615.40 | 0 |
2017-11-08 | Multi-Stage Fracture | 3532.60 | 3532.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-11-08 | 2017-11-08 | 2,851 | 2,592 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 77.7246 | N/A | |||
Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 21.917 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0369 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0369 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.037 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0369 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0369 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1453 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1453 | N/A | ||||
CAN-2057 Friction Reducer | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0831 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0831 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0831 | N/A | ||||
GSI-1W | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.017 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.017 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0757 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0757 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0757 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0757 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0757 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-10-29 | 2017-10-30 | Recycled Fracturing Water (treated at well site) | 514 |
2017-11-01 | 2017-11-12 | Recycled Fracturing Water (treated at well site) | 270 |
2017-11-06 | 2017-11-13 | Recycled Fracturing Water (treated at well site) | 297 |
2017-10-14 | 2017-10-25 | Surface Water - Runoff | 1416 |
2017-10-25 | 2017-10-27 | Groundwater - Non-saline less than or equal to 150m deep | 424 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1124 | 0.0 | 0.0 | 0.0 |
2018 | 8695 | 0.0 | 0.0 | 0.0 |
2019 | 8742 | 0.0 | 0.0 | 0.0 |
2020 | 2093 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-10-29 | No Incident Encountered | 0.00 | 0.00 |
2017-11-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]