X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534121210000

Well Details

Well ID: 0534121210000
Loading map...
Location: 00/10-12-053-12W4/0
Location Alias: 00/10-12-53-12 W4M
Location Alias 2: 00/10-12-053-12 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 12
Section: 12
County/Municipality: County of Two Hills No. 21
Well Name: DORSET PLAIN 10-12-53-12
Operator Name: Baytex Energy Ltd.
License Number: 0043216
License Date: 1972-08-08
License Status: RecExempt
Spud Date: 1972-09-27
Final Drill Date: 1972-10-03
Well Total Depth: 699.50 m
Surface Hole Latitude: 53.565567
Surface Hole Longitude: -111.631009

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-08-08 Obtained License
1972-10-01 Drill Stem Test Performed
1972-10-03 Finished Drilling
1972-10-05 Drill Stem Test Performed
1972-10-06 Production Casing Operation Performed
1972-10-06 Well Mode changed to Drilled and Cased
1973-08-02 Perforation Treatment Performed - Jet Perforation
1973-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-08-10 Perforation Treatment Performed - Jet Perforation
1973-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-14 Perforation Treatment Performed - Chemical Squeeze
1973-08-22 Perforation Treatment Performed - Fractured
1975-03-12 Perforation Treatment Performed - Jet Perforation
1975-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-03 Well Began Production
1976-03-03 Well Fluid changed to Gas
1976-03-03 Well Mode changed to Flowing
1978-10-19 Perforation Treatment Performed - Cement Squeeze
1995-02-01 Well Fluid changed to Gas
1995-02-01 Well Mode changed to Suspended
1997-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-22 Plug Back Performed
1997-08-23 Well Abandoned
1997-08-23 Well Fluid changed to Gas
1997-08-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-08-02 Perforation 681.50 684.00 7
1975-03-14 Acid Treatment 598.30 604.40 0
1978-10-19 Cement Squeeze 598.30 604.40 0
1997-08-22 Packing Device Capped w/Cement 637.00 645.00 0
1973-08-03 Acid Treatment 681.50 684.00 7
1973-08-09 Packing Device Capped w/Cement 666.00 673.60 0
1973-08-10 Perforation 657.10 659.90 7
1973-08-11 Acid Treatment 657.10 659.90 0
1973-08-14 Chemical Squeeze 657.10 659.90 0
1973-08-22 Fracture 657.10 659.90 0
1975-03-12 Perforation 598.30 599.50 7
1975-03-12 Perforation 600.50 604.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6638 0.0 0.0 0.0
1977 6264 0.0 0.0 0.0
1978 5823 0.0 0.0 0.0
1979 5967 0.0 0.0 0.0
1980 7500 0.0 0.0 0.0
1981 4993 0.0 0.0 0.0
1982 5378 0.0 0.0 0.0
1983 5014 0.0 0.0 0.0
1984 5920 0.0 0.0 0.0
1985 2769 0.0 0.0 0.0
1986 96 0.0 0.0 0.0
1988 3861 0.0 0.0 0.0
1989 5870 0.0 0.0 0.0
1990 5909 0.0 0.0 0.0
1991 6043 0.0 0.0 0.0
1992 5499 0.0 0.0 0.0

For data sources see[5]

References