X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260211000

Well Details

Well ID: 0534260211000
Loading map...
Location: 00/11-02-053-26W4/0
Location Alias: 00/11-02-53-26 W4M
Location Alias 2: 00/11-02-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 02
County/Municipality: Parkland County
Well Name: TIDEWATER ACH 11-2-53-26
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0002700
License Date: 1951-03-15
License Status: Issued
Spud Date: 1951-03-21
Final Drill Date: 1951-04-16
Well Total Depth: 1588.00 m
Surface Hole Latitude: 53.550313
Surface Hole Longitude: -113.728145

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-03-15 Obtained License
1951-04-12 Intermediate Casing Operation Performed
1951-04-16 Finished Drilling
1951-04-16 Perforation Treatment Performed - Open-Hole Completion
1951-04-16 Well Mode changed to Drilled and Cased
1951-04-19 Well Began Production
1951-04-19 Well Fluid changed to Crude Oil
1951-04-19 Well Mode changed to Flowing
1987-05-26 Well Log Performed
1989-06-13 Well Log Performed
1989-06-14 Perforation Treatment Performed - Jet Perforation
1989-06-14 Well Log Performed
1989-06-15 Well Log Performed
1989-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-19 Well Fluid changed to Crude Oil
1989-06-19 Well Mode changed to Pumping
1991-01-20 Well Log Performed
1991-01-21 Perforation Treatment Performed - Open-Hole Completion
1991-01-21 Well Log Performed
1991-01-22 Perforation Treatment Performed - Cement Plug
1991-01-24 Liner Casing Operation Performed
1991-01-24 Perforation Treatment Performed - Cement Squeeze
1991-01-25 Perforation Treatment Performed - Jet Perforation
1991-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-26 Well Log Performed
1991-01-27 Well Log Performed
1991-12-17 Perforation Treatment Performed - Chemical Squeeze
1992-02-03 Perforation Treatment Performed - Chemical Squeeze
1993-01-13 Well Log Performed
1993-01-16 Well Log Performed
1993-01-19 Perforation Treatment Performed - Jet Perforation
2004-03-31 Perforation Treatment Performed - Jet Perforation
2004-03-31 Well Log Performed
2005-06-13 Perforation Treatment Performed - Cement Squeeze
2005-07-07 Well Log Performed
2005-07-08 Perforation Treatment Performed - Jet Perforation
2005-10-18 Well Log Performed
2005-10-19 Perforation Treatment Performed - Jet Perforation
2010-01-16 Perforation Treatment Performed - Jet Perforation
2010-01-16 Well Log Performed
2010-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-16 Open Hole/Barefoot Completion 1499.00 1550.50 0
1991-01-25 Perforation 1527.50 1528.20 20
1991-01-25 Perforation 1529.00 1529.70 20
1991-01-25 Perforation 1530.50 1531.20 20
1991-01-25 Perforation 1532.00 1532.70 20
1991-01-25 Perforation 1533.50 1534.20 20
1991-01-26 Acid Treatment 1524.50 1534.20 0
1991-12-17 Chemical Squeeze 1524.50 1534.20 0
1992-02-03 Chemical Squeeze 1524.50 1534.20 0
1993-01-19 Perforation 1224.50 1226.70 20
2004-03-31 Perforation 1529.50 1530.20 14
1989-06-14 Perforation 1523.50 1524.50 13
2005-06-13 Cement Squeeze 1224.50 1226.70 0
2005-07-08 Perforation 1510.30 1511.30 20
2005-10-19 Perforation 1503.70 1505.70 20
2010-01-16 Perforation 1354.50 1356.00 20
2010-01-16 Perforation 1312.00 1320.00 20
2010-01-16 Perforation 1304.50 1310.00 20
2010-01-17 Acid Treatment 1354.50 1356.00 0
2010-01-18 Acid Treatment 1312.00 1320.00 0
2010-01-19 Acid Treatment 1304.50 1310.00 0
2011-09-24 Acid Treatment 1304.50 1320.00 0
1989-06-14 Perforation 1523.50 1524.50 13
2014-05-20 Acid Treatment 1304.50 1320.00 0
1989-06-18 Acid Treatment 1523.50 1524.50 0
1991-01-21 Open Hole/Barefoot Completion 1499.00 1588.00 0
1991-01-22 Cement Plug 1585.00 1588.00 0
1991-01-24 Cement Squeeze 1499.00 1588.00 0
1991-01-25 Perforation 1524.50 1525.20 20
1991-01-25 Perforation 1526.00 1526.70 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 5221 0.0 0.0 0.0
1969 6915 0.0 0.0 0.0
1970 7948 0.0 0.0 0.0
1971 6312 0.0 0.0 0.0
1972 5919 0.0 0.0 0.0
1973 6539 0.0 0.0 0.0
1974 5624 0.0 0.0 0.0
1975 5996 0.0 0.0 0.0
1976 4883 0.0 0.0 0.0
1977 4368 0.0 0.0 0.0
1978 6234 0.0 0.0 0.0
1979 7619 0.0 0.0 0.0
1980 7123 0.0 0.0 0.0
1981 5850 0.0 0.0 0.0
1982 6617 0.0 0.0 0.0
1983 5028 0.0 0.0 0.0
1984 6124 0.0 0.0 0.0
1985 7423 0.0 0.0 0.0
1986 6671 0.0 0.0 0.0
1987 6850 0.0 0.0 0.0
1988 8025 0.0 0.0 0.0
1989 6633 0.0 0.0 0.0
1990 5474 0.0 0.0 0.0
1991 4265 0.0 0.0 0.0
1992 7999 0.0 0.0 0.0
1993 6933 0.0 0.0 0.0
1994 8502 0.0 0.0 0.0
1995 8445 0.0 0.0 0.0
1996 1866 0.0 0.0 0.0
1997 4203 0.0 0.0 0.0
1998 7706 0.0 0.0 0.0
1999 7963 0.0 0.0 0.0
2000 7609 0.0 0.0 0.0
2001 7518 0.0 0.0 0.0
2002 5975 0.0 0.0 0.0
2003 7694 0.0 0.0 0.0
2004 7141 0.0 0.0 0.0
2005 3470 0.0 0.0 0.0
2006 7151 0.0 0.0 0.0
2007 8700 0.0 0.0 0.0
2008 8654 0.0 0.0 0.0
2009 8346 0.0 0.0 0.0
2016 732 0.0 0.0 0.0
2017 6551 0.0 0.0 0.0
2018 2136 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-05-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References