If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0534260213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.553811,"lon":-113.734917,"icon":""}]} |
| Location: 00/13-02-053-26W4/0 | |
| Location Alias: 00/13-02-53-26 W4M | |
| Location Alias 2: 00/13-02-053-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 053 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 02 | |
| County/Municipality: Parkland County | |
| Well Name: TIDEWATER ACH 13-2-53-26 | |
| Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
| License Number: 0001717 | |
| License Date: 1950-07-06 | |
| License Status: Suspension | |
| Spud Date: 1950-07-11 | |
| Final Drill Date: 1950-09-02 | |
| Well Total Depth: 1564.10 m | |
| Surface Hole Latitude: 53.553811 | |
| Surface Hole Longitude: -113.734917 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1950-07-06 | Obtained License |
| 1950-07-21 | Drill Stem Test Performed |
| 1950-07-24 | Drill Stem Test Performed |
| 1950-07-25 | Drill Stem Test Performed |
| 1950-07-29 | Drill Stem Test Performed |
| 1950-07-30 | Drill Stem Test Performed |
| 1950-07-31 | Drill Stem Test Performed |
| 1950-08-03 | Drill Stem Test Performed |
| 1950-08-10 | Drill Stem Test Performed |
| 1950-08-12 | Drill Stem Test Performed |
| 1950-08-14 | Drill Stem Test Performed |
| 1950-08-19 | Intermediate Casing Operation Performed |
| 1950-08-29 | Drill Stem Test Performed |
| 1950-09-02 | Drill Stem Test Performed |
| 1950-09-02 | Finished Drilling |
| 1950-09-02 | Perforation Treatment Performed - Open-Hole Completion |
| 1950-09-02 | Well Mode changed to Drilled and Cased |
| 1950-09-05 | Well Began Production |
| 1950-09-05 | Well Fluid changed to Crude Oil |
| 1950-09-05 | Well Mode changed to Flowing |
| 1959-06-29 | Well Type changed to Observation |
| 1961-02-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1963-02-27 | Well Log Performed |
| 1982-07-31 | Well Fluid changed to Crude Oil |
| 1982-07-31 | Well Mode changed to Flowing |
| 1982-10-04 | Perforation Treatment Performed - Cement Plug |
| 1982-10-04 | Perforation Treatment Performed - Open-Hole Completion |
| 1982-10-07 | Perforation Treatment Performed - Jet Perforation |
| 1987-04-27 | Perforation Treatment Performed - Open-Hole Completion |
| 1987-04-28 | Well Log Performed |
| 1987-04-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1987-07-02 | Well Log Performed |
| 1989-06-29 | Perforation Treatment Performed - Jet Perforation |
| 1989-06-29 | Well Log Performed |
| 1989-06-30 | Well Log Performed |
| 1989-10-13 | Well Log Performed |
| 1989-10-14 | Perforation Treatment Performed - Cement Plug |
| 1989-10-14 | Perforation Treatment Performed - Open-Hole Completion |
| 1989-10-17 | Well Log Performed |
| 1989-10-18 | Perforation Treatment Performed - Jet Perforation |
| 1989-10-18 | Well Log Performed |
| 1990-12-13 | Well Log Performed |
| 1991-01-02 | Well Log Performed |
| 1991-01-03 | Perforation Treatment Performed - Open-Hole Completion |
| 1991-01-04 | Well Log Performed |
| 1991-01-06 | Liner Casing Operation Performed |
| 1991-01-06 | Perforation Treatment Performed - Cement Squeeze |
| 1991-01-08 | Perforation Treatment Performed - Jet Perforation |
| 1991-01-08 | Well Log Performed |
| 1991-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-01-11 | Well Log Performed |
| 1991-02-07 | Well Fluid changed to Crude Oil |
| 1991-02-07 | Well Mode changed to Pumping |
| 1991-10-17 | Perforation Treatment Performed - Chemical Squeeze |
| 1992-04-20 | Perforation Treatment Performed - Chemical Squeeze |
| 1992-07-11 | Well Began Injection |
| 1992-07-11 | Well Fluid changed to Solvent |
| 1992-07-11 | Well Type changed to Injection |
| 1992-07-16 | Well Log Performed |
| 1992-07-17 | Well Log Performed |
| 2003-03-01 | Well Fluid changed to Crude Oil |
| 2003-03-01 | Well Mode changed to Pumping |
| 2004-08-04 | Well Log Performed |
| 2005-07-22 | Well Log Performed |
| 2005-07-27 | Perforation Treatment Performed - Jet Perforation |
| 2005-07-28 | Well Log Performed |
| 2005-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2005-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2005-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-11-21 | Plug Back Performed |
| 2005-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-11-22 | Plug Back Performed |
| 2005-11-22 | Well Fluid changed to Crude Oil |
| 2005-11-22 | Well Mode changed to Abandoned Zone |
| 2005-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2005-11-23 | Well Log Performed |
| 2005-11-24 | Perforation Treatment Performed - Jet Perforation |
| 2005-11-24 | Well Log Performed |
| 2005-12-02 | Perforation Treatment Performed - Remedial Casing |
| 2005-12-09 | Perforation Treatment Performed - Jet Perforation |
| 2008-05-19 | Well Log Performed |
| 2008-05-20 | Perforation Treatment Performed - Cement Squeeze |
| 2008-05-20 | Plug Back Performed |
| 2008-05-27 | Well Log Performed |
| 2008-05-29 | Perforation Treatment Performed - Jet Perforation |
| 2009-10-21 | Perforation Treatment Performed - Jet Perforation |
| 2009-10-21 | Well Log Performed |
| 2009-10-23 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1950-09-02 | Open Hole/Barefoot Completion | 1501.40 | 1551.40 | 0 |
| 1989-10-14 | Open Hole/Barefoot Completion | 1501.40 | 1534.80 | 0 |
| 1989-10-18 | Perforation | 1520.30 | 1521.00 | 13 |
| 1991-01-03 | Open Hole/Barefoot Completion | 1501.40 | 1564.10 | 0 |
| 1991-01-06 | Cement Squeeze | 1501.40 | 1562.70 | 0 |
| 1991-01-08 | Perforation | 1522.00 | 1522.70 | 15 |
| 1991-01-08 | Perforation | 1523.50 | 1524.20 | 15 |
| 1991-01-08 | Perforation | 1525.00 | 1525.70 | 15 |
| 1991-01-08 | Perforation | 1526.50 | 1527.20 | 15 |
| 1991-01-08 | Perforation | 1528.00 | 1528.70 | 15 |
| 1991-01-08 | Perforation | 1529.50 | 1530.20 | 15 |
| 1961-02-02 | Acid Wash | 1501.40 | 1551.40 | 0 |
| 1991-01-08 | Perforation | 1531.00 | 1531.70 | 15 |
| 1991-01-09 | Acid Treatment | 1522.00 | 1531.70 | 0 |
| 1991-10-17 | Chemical Squeeze | 1522.00 | 1531.70 | 0 |
| 1992-04-20 | Chemical Squeeze | 1522.00 | 1522.70 | 0 |
| 2005-07-27 | Perforation | 1515.50 | 1517.50 | 13 |
| 2005-09-30 | Acid Treatment | 1515.00 | 1517.50 | 0 |
| 2005-10-01 | Acid Treatment | 1515.50 | 1517.50 | 0 |
| 2005-11-21 | Packing Device Capped w/Cement | 1502.00 | 1510.00 | 0 |
| 2005-11-22 | Packing Device Capped w/Cement | 1374.00 | 1424.80 | 0 |
| 2005-11-23 | Perforation | 1029.00 | 1030.00 | 20 |
| 1982-10-04 | Cement Plug | 1521.00 | 1551.40 | 0 |
| 2005-11-24 | Perforation | 960.00 | 961.00 | 20 |
| 2005-12-02 | Remedial Casing Cementing | 960.00 | 1030.00 | 0 |
| 2005-12-09 | Perforation | 995.00 | 997.00 | 20 |
| 2008-05-20 | Cement Squeeze | 995.00 | 997.00 | 0 |
| 2008-05-29 | Perforation | 1222.40 | 1223.00 | 13 |
| 2008-05-29 | Perforation | 1222.00 | 1222.90 | 13 |
| 2009-10-21 | Perforation | 1155.00 | 1157.00 | 20 |
| 2009-10-23 | Fracture | 1155.00 | 1157.00 | 0 |
| 1982-10-04 | Open Hole/Barefoot Completion | 1501.40 | 1521.00 | 0 |
| 1982-10-07 | Perforation | 1516.50 | 1519.50 | 13 |
| 1987-04-27 | Open Hole/Barefoot Completion | 1501.40 | 1552.60 | 0 |
| 1987-04-29 | Acid Treatment | 1501.40 | 1516.40 | 0 |
| 1989-06-29 | Perforation | 1521.10 | 1522.10 | 13 |
| 1989-10-14 | Cement Plug | 1534.80 | 1552.60 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1982 | 1304 | 0.0 | 0.0 | 0.0 |
| 1983 | 5885 | 0.0 | 0.0 | 0.0 |
| 1984 | 6726 | 0.0 | 0.0 | 0.0 |
| 1985 | 7298 | 0.0 | 0.0 | 0.0 |
| 1986 | 5081 | 0.0 | 0.0 | 0.0 |
| 1987 | 6571 | 0.0 | 0.0 | 0.0 |
| 1988 | 8414 | 0.0 | 0.0 | 0.0 |
| 1989 | 5666 | 0.0 | 0.0 | 0.0 |
| 1990 | 3330 | 0.0 | 0.0 | 0.0 |
| 1991 | 7125 | 0.0 | 0.0 | 0.0 |
| 1992 | 4404 | 0.0 | 0.0 | 0.0 |
| 1993 | 0 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2003 | 6666 | 0.0 | 0.0 | 0.0 |
| 2004 | 7074 | 0.0 | 0.0 | 0.0 |
For data sources see[5]