X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260316000

Well Details

Well ID: 0534260316000
Loading map...
Location: 00/16-03-053-26W4/0
Location Alias: 00/16-03-53-26 W4M
Location Alias 2: 00/16-03-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 03
County/Municipality: Parkland County
Well Name: 1107882 ACC WELBOURN NO. 16-3 WELL
Operator Name: Obsidian Energy Ltd.
License Number: 0002016
License Date: 1950-09-12
License Status: Suspension
Spud Date: 1950-09-14
Final Drill Date: 1950-10-07
Well Total Depth: 1587.00 m
Surface Hole Latitude: 53.553599
Surface Hole Longitude: -113.741089

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-12 Obtained License
1950-09-29 Drill Stem Test Performed
1950-09-30 Drill Stem Test Performed
1950-10-01 Drill Stem Test Performed
1950-10-05 Production Casing Operation Performed
1950-10-07 Finished Drilling
1950-10-07 Perforation Treatment Performed - Open-Hole Completion
1950-10-07 Well Mode changed to Drilled and Cased
1950-10-11 Well Began Production
1950-10-11 Well Fluid changed to Crude Oil
1950-10-11 Well Mode changed to Flowing
1979-09-18 Perforation Treatment Performed - Cement Plug
1979-09-19 Perforation Treatment Performed - Jet Perforation
1979-09-19 Perforation Treatment Performed - Open-Hole Completion
1986-07-25 Well Fluid changed to Crude Oil
1986-07-25 Well Mode changed to Pumping
1988-01-18 Well Fluid changed to Crude Oil
1988-01-18 Well Mode changed to Suspended
1988-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-22 Perforation Treatment Performed - Fractured
1988-01-22 Perforation Treatment Performed - Jet Perforation
1988-01-22 Plug Back Performed
1988-01-22 Well Fluid changed to Crude Oil
1988-01-22 Well Log Performed
1988-01-22 Well Mode changed to Abandoned Zone
1989-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-28 Perforation Treatment Performed - Cement Squeeze
1992-10-30 Perforation Treatment Performed - Jet Perforation
1992-11-05 Perforation Treatment Performed - Open-Hole Completion
1992-11-06 Perforation Treatment Performed - Cement Plug
1992-11-07 Liner Casing Operation Performed
1992-11-07 Perforation Treatment Performed - Cement Squeeze
1992-11-07 Perforation Treatment Performed - Open-Hole Completion
1992-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-09 Perforation Treatment Performed - Jet Perforation
1992-11-09 Well Log Performed
1992-11-10 Well Log Performed
1992-11-15 Well Fluid changed to Crude Oil
1992-11-15 Well Mode changed to Gas Lift
1993-03-30 Perforation Treatment Performed - Chemical Squeeze
2004-06-26 Perforation Treatment Performed - Jet Perforation
2006-09-07 Well Fluid changed to Crude Oil
2006-09-07 Well Mode changed to Suspended
2007-08-13 Well Log Performed
2007-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-14 Plug Back Performed
2007-08-15 Perforation Treatment Performed - Jet Perforation
2007-08-15 Well Log Performed
2007-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-10 Plug Back Performed
2008-07-11 Perforation Treatment Performed - Fractured
2008-07-11 Perforation Treatment Performed - Jet Perforation
2008-07-11 Well Log Performed
2008-08-14 Well Fluid changed to Crude Oil
2008-08-14 Well Mode changed to Abandoned Zone
2008-11-03 Perforation Treatment Performed - Jet Perforation
2008-11-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-07 Open Hole/Barefoot Completion 1511.50 1553.00 0
1992-10-28 Cement Squeeze 1229.20 1231.50 0
1992-10-30 Perforation 1527.30 1530.30 13
1992-11-05 Open Hole/Barefoot Completion 1511.50 1587.00 0
1992-11-06 Cement Plug 1468.00 1587.00 0
1992-11-07 Open Hole/Barefoot Completion 1511.50 1586.00 0
1992-11-07 Cement Squeeze 1511.00 1586.00 0
1992-11-09 Perforation 1530.00 1530.50 20
1992-11-09 Perforation 1534.50 1535.00 20
1992-11-09 Perforation 1536.70 1537.20 20
1992-11-09 Perforation 1538.90 1540.40 20
1979-09-18 Cement Plug 1532.10 1553.00 0
1992-11-09 Perforation 1541.10 1541.60 20
1992-11-09 Perforation 1543.30 1543.80 20
1992-11-09 Perforation 1545.50 1546.00 20
1992-11-09 Perforation 1547.70 1548.20 20
1992-11-09 Acid Treatment 1530.00 1548.20 0
1993-03-30 Chemical Squeeze 1536.70 1537.20 0
2004-06-26 Perforation 1528.00 1529.00 20
2007-08-14 Packing Device Capped w/Cement 1512.00 1520.00 0
2007-08-14 Packing Device Capped w/Cement 1396.50 1455.00 0
2007-08-15 Perforation 1316.10 1319.20 20
1979-09-19 Open Hole/Barefoot Completion 1511.50 1532.10 0
2007-08-21 Acid Treatment 1316.10 1319.20 0
2008-07-10 Packing Device Capped w/Cement 1304.00 1312.00 0
2008-07-10 Packing Device Capped w/Cement 1218.00 1226.00 0
2008-07-11 Perforation 1100.00 1101.00 17
2008-07-11 Fracture 1100.00 1101.00 0
2008-11-03 Perforation 1103.00 1105.00 17
1979-09-19 Perforation 1527.30 1530.30 13
1988-01-22 Packing Device Capped w/Cement 1497.00 1505.00 0
1988-01-22 Perforation 1229.20 1231.50 13
1988-01-22 Fracture 1229.20 1231.50 0
1989-08-31 Acid Treatment 1229.20 1231.50 0
1989-09-21 Acid Treatment 1229.20 1231.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4487 0.0 0.0 0.0
1968 7251 0.0 0.0 0.0
1969 6692 0.0 0.0 0.0
1970 6252 0.0 0.0 0.0
1971 5775 0.0 0.0 0.0
1972 6994 0.0 0.0 0.0
1973 7815 0.0 0.0 0.0
1974 4762 0.0 0.0 0.0
1975 5324 0.0 0.0 0.0
1976 4588 0.0 0.0 0.0
1977 5125 0.0 0.0 0.0
1978 5647 0.0 0.0 0.0
1979 6643 0.0 0.0 0.0
1980 8411 0.0 0.0 0.0
1981 7095 0.0 0.0 0.0
1982 7863 0.0 0.0 0.0
1983 7896 0.0 0.0 0.0
1984 8454 0.0 0.0 0.0
1985 8420 0.0 0.0 0.0
1986 6800 0.0 0.0 0.0
1987 6973 0.0 0.0 0.0
1988 96 0.0 0.0 0.0
1992 766 0.0 0.0 0.0
1993 8042 0.0 0.0 0.0
1994 8497 0.0 0.0 0.0
1995 8402 0.0 0.0 0.0
1996 6987 0.0 0.0 0.0
1997 2380 0.0 0.0 0.0
1998 6736 0.0 0.0 0.0
1999 8316 0.0 0.0 0.0
2000 7975 0.0 0.0 0.0
2001 7849 0.0 0.0 0.0
2002 8349 0.0 0.0 0.0
2003 7172 0.0 0.0 0.0
2004 4311 0.0 0.0 0.0

For data sources see[5]

References