X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261106002

Well Details

Well ID: 0534261106002
Loading map...
Location: 00/06-11-053-26W4/2
Location Alias: 00/06-11-53-26 W4M
Location Alias 2: 00/06-11-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: 1107882 ACC ACHESON 6-11-53-26
Operator Name: Obsidian Energy Ltd.
License Number: 0003094
License Date: 1951-06-25
License Status: Issued
Spud Date: 1951-06-29
Final Drill Date: 1951-07-25
Well Total Depth: 1579.00 m
Surface Hole Latitude: 53.560721
Surface Hole Longitude: -113.729613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-25 Obtained License
1951-07-21 Intermediate Casing Operation Performed
1951-07-25 Finished Drilling
1951-07-25 Perforation Treatment Performed - Open-Hole Completion
1951-07-25 Well Mode changed to Drilled and Cased
1987-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-11 Well Log Performed
1989-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-10 Well Log Performed
1991-06-13 Perforation Treatment Performed - Open-Hole Completion
1991-06-13 Well Log Performed
1991-06-15 Liner Casing Operation Performed
1991-06-15 Perforation Treatment Performed - Cement Squeeze
1991-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-17 Perforation Treatment Performed - Jet Perforation
1991-06-17 Well Log Performed
1992-09-13 Perforation Treatment Performed - Chemical Squeeze
1992-09-14 Perforation Treatment Performed - Chemical Squeeze
1993-03-18 Well Log Performed
1993-10-10 Perforation Treatment Performed - Jet Perforation
1993-10-10 Well Log Performed
1993-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-08 Well Log Performed
2002-09-18 Perforation Treatment Performed - Jet Perforation
2002-09-18 Well Log Performed
2002-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-13 Well Log Performed
2005-07-17 Well Log Performed
2005-07-18 Perforation Treatment Performed - Jet Perforation
2006-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-15 Plug Back Performed
2006-06-19 Perforation Treatment Performed - Jet Perforation
2006-06-20 Perforation Treatment Performed - Fractured
2006-06-23 Perforation Treatment Performed - Fractured
2006-07-19 Well Began Production
2006-07-19 Well Fluid changed to Crude Oil
2006-07-19 Well Mode changed to Pumping
2009-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-07-25 Open Hole/Barefoot Completion 1496.00 1544.70 0
1991-06-17 Perforation 1525.70 1526.40 20
1991-06-17 Perforation 1527.20 1527.90 20
1991-06-17 Perforation 1528.70 1529.40 20
1991-06-17 Perforation 1530.20 1530.90 20
1991-06-17 Acid Treatment 1521.20 1530.90 0
1992-09-13 Chemical Squeeze 1525.70 1526.40 0
1992-09-14 Chemical Squeeze 1525.70 1526.40 0
1993-10-10 Perforation 1531.90 1532.40 20
1993-10-10 Perforation 1534.10 1534.60 20
1993-10-10 Perforation 1526.30 1536.80 20
1987-02-24 Acid Treatment 1513.80 1516.80 0
1993-10-11 Acid Treatment 1531.90 1536.80 0
2002-09-18 Perforation 1519.70 1521.20 13
2002-09-18 Perforation 1512.90 1515.90 13
2002-09-18 Perforation 1516.30 1518.50 13
2002-09-20 Acid Treatment 1519.70 1521.20 0
2002-09-20 Acid Treatment 1512.90 1515.90 0
2002-09-20 Acid Treatment 1516.30 1518.50 0
2005-07-18 Perforation 1490.60 1492.60 20
2006-06-15 Packing Device Capped w/Cement 1469.00 1479.80 0
2006-06-19 Perforation 1277.70 1280.80 20
1989-09-19 Acid Treatment 1519.40 1520.10 0
2006-06-20 Fracture 1277.70 1280.80 0
2006-06-23 Fracture 1277.70 1280.80 0
2009-01-26 Acid Treatment 1277.70 1280.80 0
2012-10-19 Acid Treatment 1277.70 1280.80 0
2013-12-04 Acid Treatment 1277.70 1280.80 0
1991-01-12 Acid Treatment 1496.00 1544.70 0
1991-06-13 Open Hole/Barefoot Completion 1496.00 1579.00 0
1991-06-15 Cement Squeeze 1496.00 1576.50 0
1991-06-17 Perforation 1521.20 1521.90 20
1991-06-17 Perforation 1522.70 1523.40 20
1991-06-17 Perforation 1524.20 1524.90 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3516 0.0 0.0 0.0
2007 8706 0.0 0.0 0.0
2008 8715 0.0 0.0 0.0
2009 8400 0.0 0.0 0.0
2010 8385 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8475 0.0 0.0 0.0
2013 8636 0.0 0.0 0.0
2014 8605 0.0 0.0 0.0
2015 8532 0.0 0.0 0.0
2016 8682 0.0 0.0 0.0
2017 8691 0.0 0.0 0.0
2018 8577 0.0 0.0 0.0
2019 8027 0.0 0.0 0.0
2020 420 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-22 No Incident Encountered 0.00 0.00
2013-12-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References