X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261110020

Well Details

Well ID: 0534261110020
Loading map...
Location: 02/10-11-053-26W4/0
Location Alias: 02/10-11-53-26 W4M
Location Alias 2: 02/10-11-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: CEDAR CREEK STAL-BLK 10-11-53-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0004933
License Date: 1952-07-03
License Status: Issued
Spud Date: 1952-07-05
Final Drill Date: 1952-07-24
Well Total Depth: 1398.40 m
Surface Hole Latitude: 53.565192
Surface Hole Longitude: -113.722272

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-03 Obtained License
1952-07-21 Production Casing Operation Performed
1952-07-24 Finished Drilling
1952-07-24 Perforation Treatment Performed - Open-Hole Completion
1952-07-24 Well Mode changed to Drilled and Cased
1952-07-26 Well Began Production
1952-07-26 Well Fluid changed to Crude Oil
1952-07-26 Well Mode changed to Flowing
1954-05-10 Perforation Treatment Performed - Jet Perforation
1954-05-14 Perforation Treatment Performed - Cement Squeeze
1954-05-17 Perforation Treatment Performed - Jet Perforation
1954-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-05-19 Perforation Treatment Performed - Cement Squeeze
1954-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-05-20 Perforation Treatment Performed - Cement Squeeze
1954-05-23 Drill Stem Test Performed
1954-05-23 Perforation Treatment Performed - Jet Perforation
1954-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-05-26 Perforation Treatment Performed - Cement Squeeze
1954-05-29 Perforation Treatment Performed - Jet Perforation
1954-07-28 Well Fluid changed to Crude Oil
1954-07-28 Well Mode changed to Flowing
1955-01-05 Well Fluid changed to Crude Oil
1955-01-05 Well Mode changed to Pumping
1960-11-23 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1960-11-24 Well Fluid changed to Crude Oil
1960-11-24 Well Mode changed to Abandoned Zone
1969-11-24 Perforation Treatment Performed - Jet Perforation
1993-03-19 Perforation Treatment Performed - Cement Squeeze
1993-03-22 Perforation Treatment Performed - Jet Perforation
1993-03-23 Perforation Treatment Performed - Jet Perforation
1993-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-30 Perforation Treatment Performed - Cement Squeeze
1993-04-20 Well Fluid changed to Crude Oil
1993-04-20 Well Mode changed to Flowing
1996-09-24 Well Fluid changed to Crude Oil
1996-09-24 Well Mode changed to Suspended
2002-03-14 Well Fluid changed to Crude Oil
2002-03-14 Well Mode changed to Pumping
2009-05-21 Well Log Performed
2009-05-23 Perforation Treatment Performed - Jet Perforation
2009-05-23 Well Log Performed
2009-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-06-05 Well Fluid changed to Crude Oil
2009-06-05 Well Mode changed to Suspended
2012-06-28 Perforation Treatment Performed - Jet Perforation
2012-06-28 Well Log Performed
2014-12-04 Perforation Treatment Performed - Jet Perforation
2014-12-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-24 Open Hole/Barefoot Completion 1385.60 1398.40 0
1954-05-26 Acid Treatment 1233.80 1234.40 0
1954-05-26 Cement Squeeze 1233.80 1234.40 0
1954-05-29 Perforation 1234.10 1234.70 13
1960-11-23 Resin-Gypsum Squeeze or Plug 1239.30 1241.10 0
1969-11-24 Perforation 1229.00 1229.30 7
1993-03-19 Cement Squeeze 1229.00 1234.70 0
1993-03-22 Perforation 1385.00 1387.00 14
1993-03-23 Perforation 1197.00 1202.00 13
1993-03-30 Acid Treatment 1197.00 1202.00 0
1993-03-30 Cement Squeeze 1197.00 1202.00 0
1954-05-10 Perforation 1233.20 1233.80 13
2009-05-23 Perforation 1291.50 1300.00 17
2009-05-23 Perforation 1303.00 1305.00 17
2009-05-23 Perforation 1319.00 1322.50 17
2009-05-23 Perforation 1334.00 1338.00 17
2009-05-24 Acid Treatment 1319.00 1338.00 0
2009-05-25 Acid Treatment 1291.50 1305.00 0
2012-06-28 Perforation 1221.00 1223.10 3
2014-12-04 Perforation 1214.50 1218.00 17
2014-12-04 Perforation 1219.00 1223.00 17
1954-05-14 Cement Squeeze 1233.20 1233.80 0
1954-05-17 Perforation 1233.20 1233.80 13
1954-05-19 Acid Treatment 1233.20 1233.80 0
1954-05-19 Cement Squeeze 1233.20 1233.80 0
1954-05-20 Acid Treatment 1233.20 1233.80 0
1954-05-20 Cement Squeeze 1233.20 1233.80 0
1954-05-23 Perforation 1233.80 1234.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1993 5664 0.0 0.0 0.0
1994 8411 0.0 0.0 0.0
1995 2009 0.0 0.0 0.0
2002 6789 0.0 0.0 0.0
2003 8460 0.0 0.0 0.0
2004 8775 0.0 0.0 0.0
2005 8533 0.0 0.0 0.0
2006 8501 0.0 0.0 0.0
2007 8678 0.0 0.0 0.0
2008 7753 0.0 0.0 0.0
2009 3293 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-04 No Incident Encountered 0.00 0.00
2012-07-04 No Incident Encountered 0.00 0.00
2014-12-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References