X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261111023

Well Details

Well ID: 0534261111023
Loading map...
Location: 02/11-11-053-26W4/3
Location Alias: 02/11-11-53-26 W4M
Location Alias 2: 02/11-11-053-26 W4/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: 1107882 ACC ACHESON 11-11MU-53-26
Operator Name: Obsidian Energy Ltd.
License Number: 0004317
License Date: 1952-03-05
License Status: Issued
Spud Date: 1952-03-08
Final Drill Date: 1952-03-26
Well Total Depth: 1402.40 m
Surface Hole Latitude: 53.564959
Surface Hole Longitude: -113.729026

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-05 Obtained License
1952-03-23 Production Casing Operation Performed
1952-03-26 Finished Drilling
1952-03-26 Perforation Treatment Performed - Open-Hole Completion
1952-03-26 Well Mode changed to Drilled and Cased
1962-09-19 Perforation Treatment Performed - Jet Perforation
1962-09-20 Perforation Treatment Performed - Cement Squeeze
1962-09-23 Perforation Treatment Performed - Jet Perforation
1962-09-24 Perforation Treatment Performed - Cement Squeeze
1962-09-25 Perforation Treatment Performed - Jet Perforation
1962-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-07 Perforation Treatment Performed - Cement Squeeze
1985-05-07 Plug Back Performed
1985-05-14 Well Log Performed
1985-05-15 Perforation Treatment Performed - Jet Perforation
1985-05-15 Well Log Performed
1985-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-05 Well Log Performed
1987-07-04 Well Log Performed
1988-04-04 Well Log Performed
1988-07-11 Well Log Performed
1988-09-20 Well Log Performed
1993-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-07 Perforation Treatment Performed - Jet Perforation
1993-06-07 Plug Back Performed
1993-06-07 Well Began Production
1993-06-07 Well Fluid changed to Crude Oil
1993-06-07 Well Log Performed
1993-06-07 Well Mode changed to Flowing
1993-06-08 Well Log Performed
1993-06-10 Perforation Treatment Performed - Jet Perforation
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping
2000-01-01 Well Fluid changed to Crude Oil
2000-01-01 Well Mode changed to Suspended
2002-02-05 Perforation Treatment Performed - Cement Squeeze
2002-02-08 Perforation Treatment Performed - Jet Perforation
2002-02-26 Well Fluid changed to Crude Oil
2002-02-26 Well Mode changed to Pumping
2010-01-28 Perforation Treatment Performed - Cement Squeeze
2010-02-03 Perforation Treatment Performed - Cement Squeeze
2010-02-03 Plug Back Performed
2010-02-03 Well Fluid changed to Crude Oil
2010-02-03 Well Mode changed to Abandoned Zone
2010-02-09 Perforation Treatment Performed - Jet Perforation
2010-02-09 Well Log Performed
2010-02-27 Perforation Treatment Performed - Fractured
2010-03-11 Perforation Treatment Performed - Jet Perforation
2010-03-11 Well Log Performed
2010-04-13 Well Fluid changed to Crude Oil
2010-04-13 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-26 Open Hole/Barefoot Completion 1390.20 1402.40 0
1985-05-21 Acid Treatment 1381.70 1383.70 0
1993-06-07 Packing Device Capped w/Cement 1364.30 1372.00 0
1993-06-07 Perforation 1238.00 1239.20 20
1993-06-10 Perforation 1230.50 1232.00 20
2002-02-05 Cement Squeeze 1230.50 1232.00 0
2002-02-08 Perforation 1224.20 1225.50 20
2010-01-28 Cement Squeeze 1224.20 1225.50 0
2010-02-03 Cement Squeeze 1238.00 1239.20 0
2010-02-09 Perforation 1359.00 1361.00 17
2010-02-09 Perforation 1362.50 1365.00 17
1962-09-19 Perforation 993.60 994.30 13
2010-02-27 Fracture 1359.00 1365.00 0
2010-03-11 Perforation 1220.00 1223.00 3
1962-09-20 Cement Squeeze 993.60 994.30 0
1962-09-23 Perforation 976.00 976.60 13
1962-09-24 Cement Squeeze 976.00 976.60 0
1962-09-25 Perforation 982.70 984.50 13
1962-09-26 Acid Treatment 982.70 984.50 0
1985-05-07 Cement Squeeze 982.70 984.50 0
1985-05-15 Perforation 1381.70 1383.70 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4048 0.0 0.0 0.0
1994 8200 0.0 0.0 0.0
1995 732 0.0 0.0 0.0
2002 6311 0.0 0.0 0.0
2003 8472 0.0 0.0 0.0
2004 8760 0.0 0.0 0.0
2005 8749 0.0 0.0 0.0
2006 6563 0.0 0.0 0.0
2007 2232 0.0 0.0 0.0
2008 8736 0.0 0.0 0.0
2009 8667 0.0 0.0 0.0
2010 6180 0.0 0.0 0.0
2011 8576 0.0 0.0 0.0
2012 8556 0.0 0.0 0.0
2013 8035 0.0 0.0 0.0
2014 8530 0.0 0.0 0.0
2015 8027 0.0 0.0 0.0
2016 8638 0.0 0.0 0.0
2017 8607 0.0 0.0 0.0
2018 8554 0.0 0.0 0.0
2019 7076 0.0 0.0 0.0
2020 1967 0.0 0.0 0.0

For data sources see[5]

References