X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261115000

Well Details

Well ID: 0534261115000
Loading map...
Location: 00/15-11-053-26W4/0
Location Alias: 00/15-11-53-26 W4M
Location Alias 2: 00/15-11-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: CEDAR CREEK STAL-BLK 15-11-53-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0004490
License Date: 1952-04-09
License Status: Issued
Spud Date: 1952-04-09
Final Drill Date: 1952-05-06
Well Total Depth: 1571.00 m
Surface Hole Latitude: 53.567910
Surface Hole Longitude: -113.723796

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-09 Obtained License
1952-05-02 Production Casing Operation Performed
1952-05-06 Finished Drilling
1952-05-06 Perforation Treatment Performed - Open-Hole Completion
1952-05-06 Well Mode changed to Drilled and Cased
1952-05-07 Well Began Production
1952-05-07 Well Fluid changed to Crude Oil
1952-05-07 Well Mode changed to Flowing
1970-03-20 Well Fluid changed to Crude Oil
1970-03-20 Well Mode changed to Pumping
1975-06-18 Well Fluid changed to Crude Oil
1975-06-18 Well Mode changed to Flowing
1977-03-05 Well Fluid changed to Crude Oil
1977-03-05 Well Mode changed to Pumping
1983-01-21 Perforation Treatment Performed - Cement Plug
1983-01-21 Perforation Treatment Performed - Open-Hole Completion
1983-01-23 Perforation Treatment Performed - Jet Perforation
1987-05-11 Perforation Treatment Performed - Open-Hole Completion
1987-05-13 Well Log Performed
1987-05-15 Well Log Performed
1987-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-16 Well Log Performed
1988-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-27 Well Log Performed
1991-05-28 Perforation Treatment Performed - Open-Hole Completion
1991-05-28 Well Log Performed
1991-05-30 Liner Casing Operation Performed
1991-05-30 Perforation Treatment Performed - Cement Squeeze
1991-05-31 Perforation Treatment Performed - Jet Perforation
1991-05-31 Well Log Performed
1991-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-01 Well Log Performed
1993-03-30 Perforation Treatment Performed - Chemical Squeeze
1997-05-13 Well Log Performed
2004-03-30 Perforation Treatment Performed - Jet Perforation
2004-03-30 Well Log Performed
2004-09-17 Perforation Treatment Performed - Jet Perforation
2004-09-17 Well Log Performed
2004-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-09-25 Well Log Performed
2008-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-13 Plug Back Performed
2008-02-13 Well Fluid changed to Crude Oil
2008-02-13 Well Log Performed
2008-02-13 Well Mode changed to Abandoned Zone
2008-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-15 Perforation Treatment Performed - Jet Perforation
2008-02-16 Perforation Treatment Performed - Fractured
2008-07-18 Perforation Treatment Performed - Jet Perforation
2008-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-08-15 Perforation Treatment Performed - Jet Perforation
2012-08-15 Well Log Performed
2012-08-16 Perforation Treatment Performed - Jet Perforation
2012-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-06 Open Hole/Barefoot Completion 1464.30 1537.40 0
1991-05-31 Perforation 1518.00 1518.70 20
1991-05-31 Perforation 1519.50 1520.20 20
1991-05-31 Perforation 1521.00 1521.70 20
1991-05-31 Perforation 1522.50 1523.20 20
1991-05-31 Perforation 1524.00 1524.70 20
1991-05-31 Perforation 1525.50 1526.20 20
1991-05-31 Perforation 1527.00 1527.70 20
1991-06-01 Acid Treatment 1518.00 1527.70 0
1993-03-30 Chemical Squeeze 1518.00 1527.70 0
2004-03-30 Perforation 1515.00 1515.30 16
1983-01-21 Cement Plug 1507.60 1515.20 0
2004-09-17 Perforation 1509.80 1510.60 17
2004-09-17 Perforation 1511.10 1511.80 17
2004-09-17 Perforation 1512.30 1513.00 17
2004-09-17 Perforation 1513.50 1514.20 17
2004-09-17 Perforation 1514.70 1515.40 17
2004-09-17 Perforation 1503.90 1504.60 17
2004-09-17 Perforation 1505.10 1505.80 17
2004-09-17 Perforation 1506.30 1507.00 17
2004-09-17 Perforation 1507.50 1508.20 17
2004-09-17 Perforation 1508.70 1509.40 17
1983-01-21 Open Hole/Barefoot Completion 1464.30 1507.60 0
2004-09-17 Perforation 1497.90 1498.60 17
2004-09-17 Perforation 1499.10 1499.80 17
2004-09-17 Perforation 1500.30 1501.00 17
2004-09-17 Perforation 1501.50 1502.50 17
2004-09-17 Perforation 1502.70 1503.40 17
2004-09-17 Perforation 1491.90 1492.60 17
2004-09-17 Perforation 1493.10 1493.80 17
2004-09-17 Perforation 1494.30 1495.00 17
2004-09-17 Perforation 1495.50 1496.20 17
2004-09-17 Perforation 1496.70 1497.40 17
1983-01-23 Perforation 1505.30 1507.30 13
2004-09-17 Perforation 1485.90 1486.60 17
2004-09-17 Perforation 1487.10 1487.80 17
2004-09-17 Perforation 1488.30 1489.00 17
2004-09-17 Perforation 1489.50 1490.20 17
2004-09-17 Perforation 1490.70 1491.40 17
2004-09-17 Perforation 1479.90 1480.60 17
2004-09-17 Perforation 1481.10 1481.80 17
2004-09-17 Perforation 1482.30 1483.00 17
2004-09-17 Perforation 1483.50 1484.20 17
2004-09-17 Perforation 1484.70 1485.40 17
1987-05-11 Open Hole/Barefoot Completion 1464.30 1539.40 0
2004-09-17 Perforation 1476.00 1477.00 17
2004-09-17 Perforation 1477.50 1482.20 17
2004-09-17 Perforation 1478.70 1479.40 17
2004-09-21 Acid Treatment 1476.00 1515.40 0
2008-02-13 Packing Device Capped w/Cement 1462.00 1470.00 0
2008-02-14 Packing Device Capped w/Cement 1355.00 1394.00 0
2008-02-15 Perforation 1271.50 1273.50 20
2008-02-16 Fracture 1271.50 1273.50 0
2008-07-18 Perforation 1276.00 1278.00 20
2008-07-18 Perforation 1279.00 1283.00 20
1987-05-17 Acid Treatment 1505.70 1508.70 0
2008-07-22 Acid Treatment 1271.50 1283.00 0
2012-08-15 Perforation 1271.20 1271.50 3
2012-08-16 Perforation 1267.90 1270.90 3
2012-08-20 Acid Treatment 1271.20 1283.00 0
1988-12-21 Acid Treatment 1516.70 1518.50 0
1991-05-28 Open Hole/Barefoot Completion 1464.30 1571.00 0
1991-05-30 Cement Squeeze 1464.30 1571.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4309 0.0 0.0 0.0
1968 6791 0.0 0.0 0.0
1969 4386 0.0 0.0 0.0
1970 6696 0.0 0.0 0.0
1971 3975 0.0 0.0 0.0
1972 5026 0.0 0.0 0.0
1973 6739 0.0 0.0 0.0
1974 5945 0.0 0.0 0.0
1975 3387 0.0 0.0 0.0
1976 2738 0.0 0.0 0.0
1983 6759 0.0 0.0 0.0
1984 6595 0.0 0.0 0.0
1985 7910 0.0 0.0 0.0
1986 7340 0.0 0.0 0.0
1987 6979 0.0 0.0 0.0
1988 8317 0.0 0.0 0.0
1989 8597 0.0 0.0 0.0
1990 8534 0.0 0.0 0.0
1991 8021 0.0 0.0 0.0
1992 8235 0.0 0.0 0.0
1993 7041 0.0 0.0 0.0
1994 8731 0.0 0.0 0.0
1995 8446 0.0 0.0 0.0
1996 8597 0.0 0.0 0.0
1997 7912 0.0 0.0 0.0
1998 8070 0.0 0.0 0.0
1999 7082 0.0 0.0 0.0
2000 8085 0.0 0.0 0.0
2001 5753 0.0 0.0 0.0
2002 8379 0.0 0.0 0.0
2003 8121 0.0 0.0 0.0
2004 3388 0.0 0.0 0.0
2005 8393 0.0 0.0 0.0
2006 4981 0.0 0.0 0.0
2007 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References