X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261403003

Well Details

Well ID: 0534261403003
Loading map...
Location: 00/03-14-053-26W4/3
Location Alias: 00/03-14-53-26 W4M
Location Alias 2: 00/03-14-053-26 W4/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 14
County/Municipality: Parkland County
Well Name: TIDEWATER STAL-BLK 3-14-53-26
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0003863
License Date: 1951-12-01
License Status: Abandoned
Spud Date: 1951-11-30
Final Drill Date: 1952-01-02
Well Total Depth: 1661.20 m
Surface Hole Latitude: 53.572042
Surface Hole Longitude: -113.729470

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-01 Obtained License
1952-01-02 Finished Drilling
1952-01-02 Well Mode changed to Drilled and Cased
1952-01-05 Liner Casing Operation Performed
1952-01-09 Perforation Treatment Performed - Bullet Perforation
1952-01-10 Drill Stem Test Performed
1952-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-01-11 Perforation Treatment Performed - Bullet Perforation
1952-01-13 Perforation Treatment Performed - Bullet Perforation
1952-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-01-18 Perforation Treatment Performed - Bullet Perforation
1952-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-01-22 Drill Stem Test Performed
1952-01-22 Perforation Treatment Performed - Bullet Perforation
1955-12-11 Perforation Treatment Performed - Acid Wash - No Pressure
1955-12-14 Perforation Treatment Performed - Cement Plug
1956-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-01-02 Perforation Treatment Performed - Bullet Perforation
1957-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-23 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-19 Plug Back Performed
2006-11-22 Perforation Treatment Performed - Jet Perforation
2006-11-23 Perforation Treatment Performed - Fractured
2007-09-08 Perforation Treatment Performed - Cement Plug
2007-09-08 Perforation Treatment Performed - Jet Perforation
2007-09-08 Plug Back Performed
2007-09-08 Well Log Performed
2007-09-08 Well Mode changed to Abandoned Zone
2007-09-09 Perforation Treatment Performed - Jet Perforation
2007-09-09 Perforation Treatment Performed - Remedial Casing
2007-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-10 Perforation Treatment Performed - Remedial Casing
2007-11-30 Well Log Performed
2008-08-23 Perforation Treatment Performed - Jet Perforation
2008-08-25 Perforation Treatment Performed - Jet Perforation
2008-08-25 Well Log Performed
2008-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-26 Perforation Treatment Performed - Remedial Casing
2008-08-28 Perforation Treatment Performed - Cement Plug
2008-08-28 Perforation Treatment Performed - Remedial Casing
2008-09-19 Perforation Treatment Performed - Jet Perforation
2008-09-19 Well Log Performed
2008-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-20 Perforation Treatment Performed - Jet Perforation
2008-09-20 Perforation Treatment Performed - Remedial Casing
2008-09-20 Well Log Performed
2008-09-21 Perforation Treatment Performed - Cement Plug
2008-09-21 Perforation Treatment Performed - Jet Perforation
2008-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-22 Perforation Treatment Performed - Jet Perforation
2008-09-22 Perforation Treatment Performed - Remedial Casing
2008-09-24 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2008-09-30 Well Abandoned
2008-09-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-09 Bullet Perforation 1227.10 1227.70 13
1955-12-11 Acid Wash 1226.50 1227.10 0
1955-12-14 Cement Plug 1226.50 1227.10 0
1956-01-02 Bullet Perforation 1426.50 1441.70 13
1956-01-02 Acid Treatment 1426.50 1441.70 0
1957-03-29 Acid Treatment 1426.50 1441.70 0
1961-02-05 Acid Treatment 1426.50 1441.70 0
1961-12-12 Acid Treatment 1426.50 1441.70 0
1962-02-14 Acid Treatment 1426.50 1441.70 0
1964-09-23 Acid Wash 1426.50 1441.70 0
1966-06-15 Acid Treatment 1426.50 1441.70 0
1952-01-10 Acid Treatment 1227.10 1227.70 0
1971-09-13 Acid Treatment 1426.50 1441.70 0
1972-09-05 Acid Treatment 1426.50 1441.70 0
1977-03-14 Acid Treatment 1426.50 1441.70 0
1977-07-13 Acid Treatment 1426.50 1441.70 0
1977-12-15 Acid Treatment 1426.50 1441.70 0
1980-04-15 Acid Treatment 1426.50 1441.70 0
1980-12-16 Acid Treatment 1426.50 1441.70 0
1983-11-07 Acid Treatment 1426.50 1441.70 0
1987-03-18 Acid Treatment 1426.50 1441.70 0
1991-05-28 Acid Treatment 1426.50 1441.70 0
1952-01-11 Bullet Perforation 1205.80 1206.40 0
2006-11-19 Packing Device Capped w/Cement 1405.80 1413.80 0
2006-11-22 Perforation 1205.20 1208.20 17
2006-11-22 Perforation 1186.90 1188.10 17
2006-11-23 Fracture 1205.20 1208.20 0
2006-11-23 Fracture 1186.90 1188.10 0
2007-09-08 Cement Plug 1187.60 1195.80 0
2007-09-08 Perforation 542.00 543.00 14
2007-09-09 Perforation 383.50 384.50 14
2007-09-09 Remedial Casing Cementing 542.00 543.00 0
2007-09-10 Remedial Casing Cementing 383.50 384.50 0
1952-01-13 Bullet Perforation 1186.90 1188.10 0
2007-09-10 Packing Device Capped w/Cement 361.20 380.20 0
2008-08-23 Perforation 383.50 384.50 14
2008-08-25 Perforation 495.00 496.00 14
2008-08-25 Perforation 469.00 470.00 14
2008-08-26 Remedial Casing Cementing 469.00 470.00 0
2008-08-26 Packing Device Capped w/Cement 438.50 490.00 0
2008-08-28 Remedial Casing Cementing 383.50 384.50 0
2008-08-28 Cement Plug 351.80 438.50 0
2008-09-19 Perforation 330.00 331.00 14
2008-09-20 Remedial Casing Cementing 330.00 331.00 0
1952-01-14 Acid Treatment 1205.80 1206.40 0
2008-09-20 Packing Device Capped w/Cement 314.20 325.20 0
2008-09-20 Perforation 300.00 301.00 14
2008-09-20 Remedial Casing Cementing 300.00 301.00 0
2008-09-20 Packing Device Capped w/Cement 294.00 295.00 0
2008-09-21 Perforation 270.00 271.00 17
2008-09-21 Cement Plug 286.00 294.00 0
2008-09-22 Remedial Casing Cementing 270.00 271.00 0
2008-09-22 Packing Device Capped w/Cement 231.00 265.00 0
2008-09-22 Perforation 210.00 211.00 17
2008-09-22 Remedial Casing Cementing 210.00 211.00 0
1952-01-14 Acid Treatment 1186.90 1188.10 0
2008-09-24 Packing Dev Cpd w/Res-Gyp Cem 204.00 207.00 0
1952-01-18 Bullet Perforation 1227.10 1227.70 13
1952-01-21 Acid Treatment 1227.10 1227.70 0
1952-01-22 Bullet Perforation 1226.50 1227.10 13

For data sources see[4]



References