X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535190710000

Well Details

Well ID: 0535190710000
Loading map...
Location: 00/10-07-053-19W5/0
Location Alias: 00/10-07-53-19 W5M
Location Alias 2: 00/10-07-053-19 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 19
Section: 07
County/Municipality: Yellowhead County
Well Name: CNRL EDSON 10-7-53-19
Operator Name: Canadian Natural Resources Limited
License Number: 0185982
License Date: 1996-02-20
License Status: Suspension
Spud Date: 1996-02-23
Final Drill Date: 1996-04-01
Well Total Depth: 3022.00 m
Surface Hole Latitude: 53.565372
Surface Hole Longitude: -116.785233

For data sources see[1][2]

Well History

Date Event
1996-02-20 Obtained License
1996-02-23 Well Log Performed
1996-02-27 Surface Casing Operation Performed
1996-03-16 Kick Occurred
1996-04-01 Finished Drilling
1996-04-19 Production Casing Operation Performed
1996-04-28 Well Log Performed
1996-04-29 Plug Back Performed
1996-05-01 Plug Back Performed
1996-05-01 Well Mode changed to Drilled and Cased
1996-05-02 Rig Released
1996-07-25 Well Log Performed
1996-08-19 Perforation Treatment Performed - Jet Perforation
1996-09-09 Perforation Treatment Performed - Fractured
1996-09-17 Perforation Treatment Performed - Jet Perforation
1996-09-17 Well Log Performed
1996-09-18 Perforation Treatment Performed - Fractured
2001-12-12 Perforation Treatment Performed - Jet Perforation
2001-12-30 Perforation Treatment Performed - Fractured
2002-02-22 Well Began Production
2002-02-22 Well Fluid changed to Gas
2002-02-22 Well Mode changed to Flowing
2002-04-16 Well Fluid changed to Gas
2002-04-16 Well Mode changed to Suspended
2002-06-21 Well Fluid changed to Gas
2002-06-21 Well Mode changed to Flowing
2009-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-29 Plug Back Performed
2009-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-30 Plug Back Performed
2009-07-30 Well Fluid changed to Gas
2009-07-30 Well Mode changed to Abandoned Zone
2009-07-31 Well Log Performed
2009-08-01 Well Log Performed
2009-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-14 Perforation Treatment Performed - Jet Perforation
2009-08-14 Plug Back Performed
2009-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-15 Perforation Treatment Performed - Remedial Casing
2009-08-16 Perforation Treatment Performed - Jet Perforation
2009-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-17 Perforation Treatment Performed - Remedial Casing
2009-08-18 Perforation Treatment Performed - Jet Perforation
2009-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-19 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-19 Perforation 2686.00 2693.00 20
2009-08-14 Perforation 1410.00 1410.90 99
2009-08-14 Packing Device Capped w/Cement 2562.00 2570.00 0
2009-08-15 Remedial Casing Cementing 1410.00 1410.90 0
2009-08-15 Packing Device Capped w/Cement 1392.30 1405.00 0
2009-08-16 Perforation 625.00 625.90 99
2009-08-17 Remedial Casing Cementing 625.00 625.90 0
2009-08-17 Packing Device Capped w/Cement 611.60 620.00 0
2009-08-18 Perforation 600.00 600.90 99
2009-08-19 Remedial Casing Cementing 600.00 600.90 0
2009-08-19 Packing Device Capped w/Cement 586.00 595.00 0
1996-09-09 Fracture 2686.00 2693.00 0
1996-09-17 Perforation 2575.00 2584.00 17
1996-09-18 Fracture 2575.00 2584.00 0
2001-12-12 Perforation 2807.00 2812.00 17
2001-12-12 Perforation 2803.00 2807.50 17
2001-12-30 Fracture 2803.00 2812.00 0
2009-07-29 Packing Device Capped w/Cement 2736.50 2744.50 0
2009-07-30 Packing Device Capped w/Cement 2671.80 2679.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6593 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8721 0.0 0.0 0.0
2005 8701 0.0 0.0 0.0
2006 8248 0.0 0.0 0.0
2007 8220 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 5087 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-03-16 Kick 2689.00 2689.00

For data sources see[6]

References