X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544252801000

Well Details

Well ID: 0544252801000
Loading map...
Location: 00/01-28-054-25W4/0
Location Alias: 00/01-28-54-25 W4M
Location Alias 2: 00/01-28-054-25 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 25
Section: 28
County/Municipality: Sturgeon County
Well Name: CEDAR CREEK CAMAO 1-28-54-25
Operator Name: MAGA Energy Operations Ltd.
License Number: B0002786
License Date: 1949-04-20
License Status: Suspension
Spud Date: 1949-04-27
Final Drill Date: 1949-06-12
Well Total Depth: 1524.90 m
Surface Hole Latitude: 53.689092
Surface Hole Longitude: -113.618116

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-04-20 Obtained License
1949-05-11 Drill Stem Test Performed
1949-05-12 Drill Stem Test Performed
1949-05-20 Drill Stem Test Performed
1949-06-01 Drill Stem Test Performed
1949-06-12 Finished Drilling
1949-06-12 Well Mode changed to Drilled and Cased
1949-06-14 Production Casing Operation Performed
1949-06-21 Perforation Treatment Performed - Bullet Perforation
1949-07-11 Well Began Production
1949-07-11 Well Fluid changed to Crude Oil
1949-07-11 Well Mode changed to Pumping
1953-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-09-02 Perforation Treatment Performed - Fractured
1953-09-04 Well Fluid changed to Crude Oil
1953-09-04 Well Mode changed to Flowing
1990-02-01 Well Fluid changed to Crude Oil
1990-02-01 Well Mode changed to Suspended
2007-12-07 Well Log Performed
2007-12-10 Perforation Treatment Performed - Jet Perforation
2007-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-13 Plug Back Performed
2007-12-13 Well Fluid changed to Crude Oil
2007-12-13 Well Log Performed
2007-12-13 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-06-21 Bullet Perforation 1129.30 1130.80 20
1953-09-01 Acid Treatment 1129.30 1130.80 0
1953-09-02 Fracture 1129.30 1130.80 0
2007-12-10 Perforation 1130.90 1134.90 17
2007-12-10 Perforation 1137.00 1139.00 17
2007-12-13 Packing Device Capped w/Cement 1117.00 1125.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8036 0.0 0.0 0.0
1968 8649 0.0 0.0 0.0
1969 7000 0.0 0.0 0.0
1970 3733 0.0 0.0 0.0
1971 4175 0.0 0.0 0.0
1972 8385 0.0 0.0 0.0
1973 8361 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8718 0.0 0.0 0.0
1976 8697 0.0 0.0 0.0
1977 8563 0.0 0.0 0.0
1978 8752 0.0 0.0 0.0
1979 8647 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8667 0.0 0.0 0.0
1983 8572 0.0 0.0 0.0
1984 8749 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8353 0.0 0.0 0.0
1988 473 0.0 0.0 0.0
1989 2190 0.0 0.0 0.0
1990 396 0.0 0.0 0.0

For data sources see[5]

References