X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545131405000

Well Details

Well ID: 0545131405000
Loading map...
Location: 00/05-14-054-13W5/0
Location Alias: 00/05-14-54-13 W5M
Location Alias 2: 00/05-14-054-13 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 13
Section: 14
County/Municipality: Yellowhead County
Well Name: CLEARVIEW NITON 5-14-54-13
Operator Name: Clearview Resources Ltd.
License Number: 0443939
License Date: 2012-02-08
License Status: Suspension
Spud Date: 2012-02-18
Final Drill Date: 2012-02-28
Well Total Depth: 2925.00 m
Surface Hole Latitude: 53.663380
Surface Hole Longitude: -115.791157

For data sources see[1][2]

Well History

Date Event
2012-02-08 Obtained License
2012-02-19 Surface Casing Operation Performed
2012-02-20 Well Log Performed
2012-02-21 Direction Drilling Operation Performed - Horizontal
2012-02-24 Intermediate Casing Operation Performed
2012-02-24 Well Log Performed
2012-02-28 Finished Drilling
2012-02-28 Well Mode changed to Drilled and Cased
2012-03-02 Liner Casing Operation Performed
2012-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-02 Perforation Treatment Performed - Open-Hole Completion
2012-03-03 Rig Released
2012-03-08 Perforation Treatment Performed - Open-Hole Completion
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-12 Well Began Production
2012-03-12 Well Fluid changed to Crude Oil
2012-03-12 Well Mode changed to Pumping
2012-03-13 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-18 Excalibur Drilling Ltd. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-21 1054.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-02 Open Hole/Barefoot Completion 2920.00 2925.00 0
2012-03-12 Multi-Stage Fracture 2502.50 2502.60 0
2012-03-12 Multi-Stage Fracture 2425.90 2426.00 0
2012-03-12 Multi-Stage Fracture 2186.80 2186.90 0
2012-03-12 Multi-Stage Fracture 2112.00 2112.10 0
2012-03-12 Multi-Stage Fracture 2050.10 2050.20 0
2012-03-12 Multi-Stage Fracture 1973.20 1973.30 0
2012-03-13 Multi-Stage Fracture 1911.10 1911.20 0
2012-03-13 Multi-Stage Fracture 1834.80 1834.90 0
2012-03-13 Multi-Stage Fracture 1772.10 1772.20 0
2012-03-13 Multi-Stage Fracture 1710.90 1711.00 0
2012-03-02 Multi-Stage Fracture 1675.00 2920.00 0
2012-03-08 Open Hole/Barefoot Completion 2920.00 2925.00 0
2012-03-12 Multi-Stage Fracture 2910.80 2910.90 0
2012-03-12 Multi-Stage Fracture 2842.20 2842.30 0
2012-03-12 Multi-Stage Fracture 2779.90 2780.00 0
2012-03-12 Multi-Stage Fracture 2703.10 2703.20 0
2012-03-12 Multi-Stage Fracture 2640.60 2640.70 0
2012-03-12 Multi-Stage Fracture 2564.80 2564.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6696 0.0 0.0 0.0
2013 5712 0.0 0.0 0.0
2014 8452 0.0 0.0 0.0
2015 2063 0.0 0.0 0.0
2016 24 0.0 0.0 0.0
2017 864 0.0 0.0 0.0
2018 7440 0.0 0.0 0.0
2019 7176 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References