X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545150507022

Well Details

Well ID: 0545150507022
Loading map...
Location: 02/07-05-054-15W5/2
Location Alias: 02/07-05-54-15 W5M
Location Alias 2: 02/07-05-054-15 W5/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 15
Section: 05
County/Municipality: Yellowhead County
Well Name: ARROW POINT ROSEVEAR 7-5-54-15
Operator Name: Arrow Point Oil & Gas Ltd.
License Number: 0118935
License Date: 1985-11-05
License Status: Issued
Spud Date: 1985-11-23
Final Drill Date: 1985-12-05
Well Total Depth: 1942.00 m
Surface Hole Latitude: 53.634009
Surface Hole Longitude: -116.172987

For data sources see[1][2]

Well History

Date Event
1985-11-05 Obtained License
1985-11-24 Direction Drilling Operation Performed - Deviate
1985-11-25 Surface Casing Operation Performed
1985-12-04 Well Log Performed
1985-12-05 Finished Drilling
1985-12-05 Well Log Performed
1985-12-05 Well Mode changed to Drilled and Cased
1985-12-06 Drill Stem Test Performed
1985-12-10 Production Casing Operation Performed
1985-12-10 Rig Released
1985-12-21 Perforation Treatment Performed - Jet Perforation
1985-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-04 Plug Back Performed
1986-01-05 Perforation Treatment Performed - Jet Perforation
1986-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-13 Perforation Treatment Performed - Jet Perforation
2001-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-01 Perforation Treatment Performed - Cement Squeeze
2004-07-01 Plug Back Performed
2004-07-08 Perforation Treatment Performed - Jet Perforation
2004-07-13 Perforation Treatment Performed - Fractured
2004-07-18 Well Began Production
2004-07-18 Well Fluid changed to Crude Oil
2004-07-18 Well Mode changed to Pumping
2011-02-01 Well Fluid changed to Crude Oil
2011-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-11-24 186.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-21 Perforation 1924.00 1932.00 13
2001-03-30 Acid Treatment 1835.00 1840.00 0
2001-03-30 Acid Treatment 1809.00 1819.00 0
2004-07-01 Cement Squeeze 1809.00 1850.00 0
2004-07-08 Perforation 1656.50 1664.00 17
2004-07-13 Fracture 1656.50 1664.00 0
1985-12-22 Acid Treatment 1924.00 1932.00 0
1986-01-04 Packing Device Capped w/Cement 1912.50 1920.00 0
1986-01-05 Perforation 1810.00 1819.00 13
1986-01-06 Acid Treatment 1810.00 1819.00 0
1996-09-13 Perforation 1845.00 1850.00 13
1996-09-13 Perforation 1835.00 1840.00 13
1996-09-13 Perforation 1809.00 1812.00 13
2001-03-30 Acid Treatment 1845.00 1850.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1451 0.0 0.0 0.0
2005 3991 0.0 0.0 0.0
2006 2908 0.0 0.0 0.0
2007 120 0.0 0.0 0.0
2008 1312 0.0 0.0 0.0

For data sources see[6]

References