X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545182216002

Well Details

Well ID: 0545182216002
Loading map...
Location: 00/16-22-054-18W5/2
Location Alias: 00/16-22-54-18 W5M
Location Alias 2: 00/16-22-054-18 W5/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 18
Section: 22
County/Municipality: Yellowhead County
Well Name: SOC EDSON 16-22-54-18
Operator Name: AlphaBow Energy Ltd.
License Number: 0234232
License Date: 2000-02-25
License Status: Issued
Spud Date: 2000-03-01
Final Drill Date: 2000-03-18
Well Total Depth: 2660.00 m
Surface Hole Latitude: 53.683401
Surface Hole Longitude: -116.562127

For data sources see[1][2]

Well History

Date Event
2000-02-25 Obtained License
2000-03-12 Perforation Treatment Performed - Jet Perforation
2000-03-17 Perforation Treatment Performed - Jet Perforation
2000-03-18 Finished Drilling
2000-03-18 Perforation Treatment Performed - Jet Perforation
2000-03-19 Perforation Treatment Performed - Jet Perforation
2000-03-22 Perforation Treatment Performed - Fractured
2000-03-27 Rig Released
2000-03-27 Well Mode changed to Drilled and Cased
2000-08-01 Well Began Production
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Flowing
2000-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-15 Plug Back Performed
2000-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-17 Plug Back Performed
2000-12-19 Perforation Treatment Performed - Jet Perforation
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Pumping
2018-02-01 Well Fluid changed to Crude Oil
2018-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-12 Perforation 1867.00 1869.00 10
2000-12-19 Perforation 1846.00 1848.00 17
2000-03-17 Perforation 2461.50 2464.50 13
2000-03-17 Perforation 2516.50 2521.00 13
2000-03-18 Perforation 2557.00 2564.00 13
2000-03-19 Perforation 2555.00 2564.00 13
2000-03-22 Fracture 2555.00 2564.00 0
2000-12-15 Packing Device Capped w/Cement 2542.00 2550.00 0
2000-12-17 Packing Device Capped w/Cement 2500.70 2508.70 0
2000-12-19 Perforation 1867.00 1869.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3072 0.0 0.0 0.0
2001 8569 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8747 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6410 0.0 0.0 0.0
2010 8660 0.0 0.0 0.0
2011 8392 0.0 0.0 0.0
2012 7423 0.0 0.0 0.0
2013 8168 0.0 0.0 0.0
2014 8509 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7319 0.0 0.0 0.0

For data sources see[5]

References