X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545190814020

Well Details

Well ID: 0545190814020
Loading map...
Location: 02/14-08-054-19W5/0
Location Alias: 02/14-08-54-19 W5M
Location Alias 2: 02/14-08-054-19 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 19
Section: 08
County/Municipality: Yellowhead County
Well Name: PEYTO EDSON 14-8-54-19
Operator Name: Peyto Exploration & Development Corp.
License Number: 0481528
License Date: 2016-11-18
License Status: Amended
Spud Date: 2017-01-07
Final Drill Date: 2017-01-22
Well Total Depth: 4787.00 m
Surface Hole Latitude: 53.653666
Surface Hole Longitude: -116.803121

For data sources see[1][2]

Well History

Date Event
2016-11-18 Obtained License
2017-01-08 Surface Casing Operation Performed
2017-01-12 Direction Drilling Operation Performed - Deviate
2017-01-13 Direction Drilling Operation Performed - Horizontal
2017-01-13 Well Log Performed
2017-01-14 Intermediate Casing Operation Performed
2017-01-22 Finished Drilling
2017-01-22 Well Log Performed
2017-01-22 Well Mode changed to Drilled and Cased
2017-01-24 Liner Casing Operation Performed
2017-01-24 Perforation Treatment Performed - Open-Hole Completion
2017-01-26 Rig Released
2017-02-15 Well Log Performed
2017-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-03 Well Began Production
2017-03-03 Well Fluid changed to Gas
2017-03-03 Well Mode changed to Flowing
2018-09-20 Well Fluid changed to Gas
2018-09-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-12 2362.00 Deviate (5 - 79 degrees)
2017-01-13 2825.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-24 Open Hole/Barefoot Completion 4767.00 4787.00 0
2017-02-20 Multi-Stage Fracture 3957.30 3957.40 0
2017-02-20 Multi-Stage Fracture 3814.80 3814.90 0
2017-02-20 Multi-Stage Fracture 3739.70 3739.80 0
2017-02-20 Multi-Stage Fracture 3649.50 3649.60 0
2017-02-20 Multi-Stage Fracture 3156.50 3156.60 0
2017-02-20 Multi-Stage Fracture 3015.90 3016.00 0
2017-02-20 Multi-Stage Fracture 2901.50 2901.60 0
2017-02-20 Multi-Stage Fracture 4749.80 4749.90 0
2017-02-20 Multi-Stage Fracture 4685.90 4686.00 0
2017-02-20 Multi-Stage Fracture 4572.00 4572.10 0
2017-02-20 Multi-Stage Fracture 4432.40 4432.50 0
2017-02-20 Multi-Stage Fracture 4329.40 4329.50 0
2017-02-20 Multi-Stage Fracture 4266.00 4266.10 0
2017-02-20 Multi-Stage Fracture 4123.90 4124.00 0
2017-02-20 Multi-Stage Fracture 4034.70 4034.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-20 2017-02-20 2,703 3,286 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.8988 N/A
water Not Available 100 75.6085 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 21.2 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0359 N/A
2-mercaptoethanol 60-24-2 100 0.0359 N/A
dibromoacetonitrile 3252-43-5 100 0.0359 N/A
non-hazardous ingredients Not Available 100 0.0359 N/A
sodium bromide 7647-15-6 100 0.0359 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1413 N/A
non-hazardous ingredients Not Available 100 0.1413 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0226 N/A
GSI-1W Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0165 N/A
propylene glycol 57-55-6 100 0.0165 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0759 N/A
methanol 67-56-1 100 0.0759 N/A
water Not Available 100 0.0759 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-17 2017-02-18 Surface Water - Runoff 1500
2017-02-19 2017-02-20 Recycled Fracturing Water (treated at well site) 1602
2017-02-06 2017-02-07 Groundwater - Non-saline less than or equal to 150m deep 289

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7280 0.0 0.0 0.0
2018 8693 0.0 0.0 0.0
2019 8716 0.0 0.0 0.0
2020 1917 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-26 No Incident Encountered 0.00 0.00
2017-02-25 No Incident Encountered 0.00 0.00

For data sources see[9]

References