X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554032816002

Well Details

Well ID: 0554032816002
Loading map...
Location: 00/16-28-055-03W4/2
Location Alias: 00/16-28-55-03 W4M
Location Alias 2: 00/16-28-055-03 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 28
County/Municipality: County of St. Paul No. 19
Well Name: WLEC LIND 16-28-55-3
Operator Name: West Lake Energy Corp.
License Number: 0115741
License Date: 1985-06-28
License Status: Suspension
Spud Date: 1985-07-01
Final Drill Date: 1985-07-04
Well Total Depth: 519.00 m
Surface Hole Latitude: 53.787398
Surface Hole Longitude: -110.382213

For data sources see[1][2]

Well History

Date Event
1985-06-28 Obtained License
1985-07-02 Surface Casing Operation Performed
1985-07-04 Finished Drilling
1985-07-04 Well Mode changed to Drilled and Cased
1985-07-05 Well Log Performed
1985-07-06 Drill Stem Test Performed
1985-07-06 Production Casing Operation Performed
1985-07-06 Rig Released
1985-08-06 Perforation Treatment Performed - Jet Perforation
1985-08-06 Well Log Performed
2000-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-03 Plug Back Performed
2010-07-10 Perforation Treatment Performed - Jet Perforation
2010-07-10 Well Log Performed
2010-08-01 Well Began Production
2010-08-01 Well Fluid changed to Crude Bitumen
2010-08-01 Well Mode changed to Pumping
2010-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-06 Perforation Treatment Performed - Jet Perforation
2014-01-01 Well Fluid changed to Crude Bitumen
2014-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-06 Perforation 508.00 510.50 39
2000-03-03 Packing Device Capped w/Cement 492.00 500.00 0
2010-07-10 Perforation 435.50 437.00 26
2010-08-25 Packing Device Capped w/Cement 489.70 497.70 0
2012-01-06 Perforation 435.50 437.00 26
2012-01-06 Perforation 426.50 428.50 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3512 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 2183 0.0 0.0 0.0

For data sources see[5]

References