X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554033406022

Well Details

Well ID: 0554033406022
Loading map...
Location: 02/06-34-055-03W4/2
Location Alias: 02/06-34-55-03 W4M
Location Alias 2: 02/06-34-055-03 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 34
County/Municipality: County of Vermilion River
Well Name: WLEC LIND 6-34-55-3
Operator Name: West Lake Energy Corp.
License Number: 0188892
License Date: 1996-06-20
License Status: Suspension
Spud Date: 1996-06-30
Final Drill Date: 1996-07-04
Well Total Depth: 621.00 m
Surface Hole Latitude: 53.793642
Surface Hole Longitude: -110.368577

For data sources see[1][2]

Well History

Date Event
1996-06-20 Obtained License
1996-06-30 Conductor Casing Operation Performed
1996-06-30 Direction Drilling Operation Performed - Deviate
1996-07-01 Plug Back Performed
1996-07-02 Direction Drilling Operation Performed - Deviate
1996-07-04 Finished Drilling
1996-07-04 Well Log Performed
1996-07-04 Well Mode changed to Drilled and Cased
1996-07-05 Rig Released
1996-07-09 Well Log Performed
1996-07-26 Perforation Treatment Performed - Jet Perforation
1996-07-26 Well Log Performed
2009-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-02 Perforation Treatment Performed - Jet Perforation
2009-09-02 Well Began Production
2009-09-02 Well Fluid changed to Crude Bitumen
2009-09-02 Well Log Performed
2009-09-02 Well Mode changed to Pumping
2011-10-01 Well Fluid changed to Crude Bitumen
2011-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-30 35.00 Deviate (5 - 79 degrees)
1996-07-02 50.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-26 Perforation 598.00 602.60 26
2009-09-01 Packing Device Capped w/Cement 582.00 590.00 0
2009-09-02 Perforation 493.00 496.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 2152 0.0 0.0 0.0
2010 713 0.0 0.0 0.0

For data sources see[6]

References