X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554033409002

Well Details

Well ID: 0554033409002
Loading map...
Location: 00/09-34-055-03W4/2
Location Alias: 00/09-34-55-03 W4M
Location Alias 2: 00/09-34-055-03 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 34
County/Municipality: County of Vermilion River
Well Name: WLEC LIND 9-34-55-3
Operator Name: West Lake Energy Corp.
License Number: 0192437
License Date: 1996-10-18
License Status: Suspension
Spud Date: 1996-11-02
Final Drill Date: 1996-11-04
Well Total Depth: 538.00 m
Surface Hole Latitude: 53.798483
Surface Hole Longitude: -110.352984

For data sources see[1][2]

Well History

Date Event
1996-10-18 Obtained License
1996-11-03 Surface Casing Operation Performed
1996-11-04 Finished Drilling
1996-11-04 Well Log Performed
1996-11-04 Well Mode changed to Drilled and Cased
1996-11-05 Production Casing Operation Performed
1996-11-05 Rig Released
1996-12-07 Perforation Treatment Performed - Jet Perforation
1996-12-07 Well Log Performed
1996-12-08 Perforation Treatment Performed - Jet Perforation
2000-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-01 Perforation Treatment Performed - Jet Perforation
2000-06-01 Plug Back Performed
2000-06-01 Well Mode changed to Drilled and Cased
2000-06-02 Well Began Production
2000-06-02 Well Fluid changed to Crude Bitumen
2000-06-02 Well Mode changed to Pumping
2005-07-05 Perforation Treatment Performed - Jet Perforation
2007-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-05-26 Plug Back Performed
2007-05-26 Well Fluid changed to Crude Bitumen
2007-05-26 Well Log Performed
2007-05-26 Well Mode changed to Abandoned Zone
2007-05-27 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-07 Perforation 524.20 525.30 26
2007-05-27 Perforation 404.00 405.00 26
2007-05-27 Perforation 406.00 407.00 26
1996-12-08 Perforation 528.90 537.50 26
2000-06-01 Packing Device Capped w/Cement 507.00 515.00 0
2000-06-01 Perforation 451.00 453.00 26
2005-07-05 Perforation 441.00 443.00 26
2005-07-05 Perforation 446.30 447.30 26
2005-07-05 Perforation 450.50 451.00 26
2005-07-05 Perforation 453.00 454.00 26
2007-05-26 Packing Device Capped w/Cement 431.00 439.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 984 0.0 0.0 0.0
2001 744 0.0 0.0 0.0
2002 476 0.0 0.0 0.0
2005 336 0.0 0.0 0.0
2006 8397 0.0 0.0 0.0
2007 1865 0.0 0.0 0.0

For data sources see[5]

References