X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554052512002

Well Details

Well ID: 0554052512002
Loading map...
Location: 00/12-25-055-05W4/2
Location Alias: 00/12-25-55-05 W4M
Location Alias 2: 00/12-25-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 25
County/Municipality: County of St. Paul No. 19
Well Name: ELAN PCP 12A LINDBERGH 12-25-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0190904
License Date: 1996-08-28
License Status: Abandoned
Spud Date: 1996-09-05
Final Drill Date: 1996-09-07
Well Total Depth: 588.00 m
Surface Hole Latitude: 53.780087
Surface Hole Longitude: -110.621114

For data sources see[1][2]

Well History

Date Event
1996-08-28 Obtained License
1996-09-05 Surface Casing Operation Performed
1996-09-06 Direction Drilling Operation Performed - Deviate
1996-09-07 Finished Drilling
1996-09-07 Lost Circulation Occurred
1996-09-07 Well Mode changed to Drilled and Cased
1996-09-08 Production Casing Operation Performed
1996-09-08 Rig Released
1996-09-08 Well Log Performed
1996-09-16 Well Log Performed
1996-09-17 Well Log Performed
1996-09-18 Perforation Treatment Performed - Jet Perforation
1996-12-19 Well Log Performed
2004-03-31 Perforation Treatment Performed - Cement Plug
2004-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-01 Plug Back Performed
2004-04-01 Well Began Production
2004-04-01 Well Fluid changed to Crude Bitumen
2004-04-01 Well Mode changed to Pumping
2004-04-02 Perforation Treatment Performed - Jet Perforation
2004-04-02 Well Log Performed
2008-12-31 Well Fluid changed to Crude Bitumen
2008-12-31 Well Mode changed to Suspended
2010-09-29 Perforation Treatment Performed - Jet Perforation
2010-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-01 Plug Back Performed
2010-10-01 Well Fluid changed to Crude Bitumen
2010-10-01 Well Mode changed to Abandoned Zone
2010-10-25 Well Abandoned
2010-10-25 Well Fluid changed to Crude Bitumen
2010-10-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-06 70.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-18 Perforation 480.80 482.00 26
2010-09-29 Perforation 480.80 482.00 26
2010-09-29 Perforation 485.50 487.00 26
2010-09-30 Packing Device Capped w/Cement 482.00 490.00 0
2010-09-30 Packing Device Capped w/Cement 436.20 474.50 0
2010-10-01 Packing Device Capped w/Cement 406.00 420.00 0
1996-09-18 Perforation 485.50 487.00 26
1996-09-18 Perforation 493.00 493.50 26
1996-09-18 Perforation 498.00 503.00 26
2004-03-31 Cement Plug 500.30 582.00 0
2004-04-01 Packing Device Capped w/Cement 494.00 497.00 0
2004-04-01 Packing Device Capped w/Cement 459.00 475.00 0
2004-04-02 Perforation 430.50 432.50 17
2004-04-02 Perforation 435.50 436.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5198 0.0 0.0 0.0
2005 3871 0.0 0.0 0.0
2006 8064 0.0 0.0 0.0
2007 4515 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-09-07 Lost Circulation 588.00 588.00

For data sources see[7]

References