X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554202510000

Well Details

Well ID: 0554202510000
Loading map...
Location: 00/10-25-055-20W4/0
Location Alias: 00/10-25-55-20 W4M
Location Alias 2: 00/10-25-055-20 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 20
Section: 25
County/Municipality: Lamont County
Well Name: TAC REDWATER 10-25-55-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0446971
License Date: 2012-06-29
License Status: Issued
Spud Date: 2012-08-02
Final Drill Date: 2012-08-09
Well Total Depth: 1833.00 m
Surface Hole Latitude: 53.773435
Surface Hole Longitude: -112.840301

For data sources see[1][2]

Well History

Date Event
2012-06-29 Obtained License
2012-08-02 Surface Casing Operation Performed
2012-08-02 Well Log Performed
2012-08-03 Direction Drilling Operation Performed - Deviate
2012-08-04 Direction Drilling Operation Performed - Horizontal
2012-08-04 Intermediate Casing Operation Performed
2012-08-09 Finished Drilling
2012-08-09 Well Mode changed to Drilled and Cased
2012-08-10 Liner Casing Operation Performed
2012-08-10 Perforation Treatment Performed - Open-Hole Completion
2012-08-11 Rig Released
2012-08-20 Well Log Performed
2012-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-24 Well Fluid changed to Crude Oil
2012-09-24 Well Mode changed to Potential
2012-11-12 Well Log Performed
2012-11-13 Perforation Treatment Performed - Jet Perforation
2012-11-13 Well Log Performed
2012-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-16 Perforation Treatment Performed - Remedial Casing
2012-11-18 Well Log Performed
2012-11-20 Perforation Treatment Performed - Jet Perforation
2012-11-20 Well Log Performed
2012-11-22 Perforation Treatment Performed - Remedial Casing
2012-11-24 Well Log Performed
2012-11-27 Perforation Treatment Performed - Jet Perforation
2012-11-27 Well Log Performed
2012-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-29 Well Log Performed
2012-11-30 Perforation Treatment Performed - Remedial Casing
2012-12-01 Perforation Treatment Performed - Jet Perforation
2012-12-01 Well Log Performed
2012-12-03 Perforation Treatment Performed - Remedial Casing
2012-12-05 Well Log Performed
2012-12-06 Perforation Treatment Performed - Jet Perforation
2012-12-06 Well Log Performed
2012-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-12-09 Perforation Treatment Performed - Remedial Casing
2013-03-16 Well Began Production
2013-03-16 Well Fluid changed to Crude Oil
2013-03-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-02 Horizon Drilling Inc. 12 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-03 439.70 Deviate (5 - 79 degrees)
2012-08-04 843.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-10 Open Hole/Barefoot Completion 1826.00 1833.00 0
2012-09-22 Multi-Stage Fracture 982.00 984.60 0
2012-11-13 Perforation 666.40 669.40 20
2012-11-15 Acid Treatment 666.40 669.40 0
2012-11-16 Remedial Casing Cementing 666.40 669.40 0
2012-11-20 Perforation 427.00 430.00 20
2012-11-22 Remedial Casing Cementing 427.00 430.00 0
2012-11-27 Perforation 321.20 324.20 20
2012-11-28 Acid Treatment 321.20 324.20 0
2012-11-30 Remedial Casing Cementing 321.20 324.20 0
2012-12-01 Perforation 277.80 280.80 20
2012-09-22 Multi-Stage Fracture 1792.20 1794.80 0
2012-12-03 Remedial Casing Cementing 277.80 280.80 0
2012-12-06 Perforation 132.00 135.00 20
2012-12-07 Acid Treatment 132.00 135.00 0
2012-12-09 Remedial Casing Cementing 132.00 135.00 0
2012-09-22 Multi-Stage Fracture 1727.20 1729.80 0
2012-09-22 Multi-Stage Fracture 1631.10 1633.70 0
2012-09-22 Multi-Stage Fracture 1509.70 1512.30 0
2012-09-22 Multi-Stage Fracture 1401.10 1403.70 0
2012-09-22 Multi-Stage Fracture 1306.20 1308.80 0
2012-09-22 Multi-Stage Fracture 1196.60 1199.20 0
2012-09-22 Multi-Stage Fracture 1089.70 1092.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 68 0.0 0.0 0.0
2013 6465 0.0 0.0 0.0
2014 8357 0.0 0.0 0.0
2015 7798 0.0 0.0 0.0
2016 8084 0.0 0.0 0.0
2017 8324 0.0 0.0 0.0
2018 8339 0.0 0.0 0.0
2019 7605 0.0 0.0 0.0
2020 2080 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-11 No Incident Encountered 0.00 0.00
2012-12-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References