X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554203406020

Well Details

Well ID: 0554203406020
Loading map...
Location: 02/06-34-055-20W4/0
Location Alias: 02/06-34-55-20 W4M
Location Alias 2: 02/06-34-055-20 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 20
Section: 34
County/Municipality: Lamont County
Well Name: TAC REDWATER 6-34-55-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0420233
License Date: 2010-05-04
License Status: Issued
Spud Date: 2010-06-19
Final Drill Date: 2010-06-25
Well Total Depth: 1583.00 m
Surface Hole Latitude: 53.796430
Surface Hole Longitude: -112.904097

For data sources see[1][2]

Well History

Date Event
2010-05-04 Obtained License
2010-06-19 Surface Casing Operation Performed
2010-06-20 Direction Drilling Operation Performed - Deviate
2010-06-22 Intermediate Casing Operation Performed
2010-06-22 Well Log Performed
2010-06-23 Direction Drilling Operation Performed - Horizontal
2010-06-25 Finished Drilling
2010-06-25 Well Log Performed
2010-06-25 Well Mode changed to Drilled and Cased
2010-06-26 Liner Casing Operation Performed
2010-06-26 Perforation Treatment Performed - Open-Hole Completion
2010-06-27 Rig Released
2010-07-21 Well Log Performed
2010-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-04 Well Began Production
2010-08-04 Well Fluid changed to Crude Oil
2010-08-04 Well Mode changed to Pumping
2010-10-31 Well Log Performed
2010-11-01 Perforation Treatment Performed - Jet Perforation
2010-11-01 Well Log Performed
2010-11-03 Perforation Treatment Performed - Jet Perforation
2010-11-05 Perforation Treatment Performed - Jet Perforation
2010-11-09 Perforation Treatment Performed - Jet Perforation
2010-11-09 Well Log Performed
2010-11-11 Perforation Treatment Performed - Jet Perforation
2010-11-11 Well Log Performed
2010-11-13 Perforation Treatment Performed - Remedial Casing
2010-11-17 Well Log Performed
2010-11-23 Perforation Treatment Performed - Jet Perforation
2010-11-23 Well Log Performed
2010-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-26 Perforation Treatment Performed - Remedial Casing
2010-12-04 Perforation Treatment Performed - Remedial Casing
2010-12-07 Perforation Treatment Performed - Jet Perforation
2010-12-07 Well Log Performed
2010-12-08 Perforation Treatment Performed - Remedial Casing
2010-12-12 Perforation Treatment Performed - Remedial Casing
2010-12-15 Perforation Treatment Performed - Jet Perforation
2010-12-15 Well Log Performed
2010-12-16 Perforation Treatment Performed - Remedial Casing
2010-12-17 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-06-20 119.00 Deviate (5 - 79 degrees)
2010-06-23 849.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-26 Open Hole/Barefoot Completion 849.00 1578.50 0
2010-11-01 Perforation 489.00 491.00 17
2010-11-03 Perforation 488.00 490.00 17
2010-11-05 Perforation 499.00 501.00 17
2010-11-09 Perforation 358.00 360.00 17
2010-11-11 Perforation 358.00 359.00 21
2010-11-11 Perforation 357.00 358.00 17
2010-11-13 Remedial Casing Cementing 357.00 358.00 0
2010-11-23 Perforation 284.00 286.00 17
2010-11-23 Perforation 281.00 283.00 17
2010-11-23 Perforation 278.00 280.00 17
2010-07-25 Multi-Stage Fracture 862.70 958.30 0
2010-11-25 Acid Treatment 284.00 286.00 0
2010-11-25 Acid Treatment 281.00 283.00 0
2010-11-25 Acid Treatment 278.00 280.00 0
2010-11-26 Remedial Casing Cementing 278.00 280.00 0
2010-12-04 Remedial Casing Cementing 488.00 501.00 0
2010-12-04 Remedial Casing Cementing 358.00 360.00 0
2010-12-07 Perforation 274.00 278.00 13
2010-12-08 Remedial Casing Cementing 274.00 278.00 0
2010-12-12 Remedial Casing Cementing 284.00 286.00 0
2010-12-15 Perforation 143.00 145.00 17
2010-07-25 Multi-Stage Fracture 959.90 1068.40 0
2010-12-16 Remedial Casing Cementing 281.00 283.00 0
2010-12-17 Remedial Casing Cementing 143.00 145.00 0
2010-07-25 Multi-Stage Fracture 1070.00 1165.30 0
2010-07-25 Multi-Stage Fracture 1166.90 1262.30 0
2010-07-25 Multi-Stage Fracture 1263.90 1359.10 0
2010-07-25 Multi-Stage Fracture 1360.70 1442.80 0
2010-07-25 Multi-Stage Fracture 144.40 1569.00 0
2010-11-01 Perforation 489.00 491.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 144 0.0 0.0 0.0
2011 7437 0.0 0.0 0.0
2012 8700 0.0 0.0 0.0
2013 8364 0.0 0.0 0.0
2014 8648 0.0 0.0 0.0
2015 8590 0.0 0.0 0.0
2016 8610 0.0 0.0 0.0
2017 8425 0.0 0.0 0.0
2018 8395 0.0 0.0 0.0
2019 8108 0.0 0.0 0.0
2020 1701 0.0 0.0 0.0

For data sources see[6]

References