0554252609000

Well Details

Well ID: 0554252609000
Loading map...
Location: 00/09-26-055-25W4/0
Location Alias: 00/09-26-55-25 W4M
Location Alias 2: 00/09-26-055-25 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 25
Section: 26
County/Municipality: Sturgeon County
Well Name: CIGOL MORINVILLE 9-26-55-25
Operator Name: Canadian Natural Resources Limited
License Number: 0000895
License Date: 1949-11-17
License Status: RecCertified
Spud Date: 1949-12-02
Final Drill Date: 1949-12-31
Well Total Depth: 1329.50 m
Surface Hole Latitude: 53.783613
Surface Hole Longitude: -113.598488

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-11-17 Obtained License
1949-12-12 Drill Stem Test Performed
1949-12-18 Drill Stem Test Performed
1949-12-19 Drill Stem Test Performed
1949-12-20 Drill Stem Test Performed
1949-12-21 Drill Stem Test Performed
1949-12-26 Drill Stem Test Performed
1949-12-31 Finished Drilling
1949-12-31 Perforation Treatment Performed - Open-Hole Completion
1950-01-06 Production Casing Operation Performed
1950-01-09 Drill Stem Test Performed
1950-01-10 Perforation Treatment Performed - Cement Squeeze
1950-01-11 Drill Stem Test Performed
1950-01-11 Perforation Treatment Performed - Bullet Perforation
1950-01-12 Drill Stem Test Performed
1950-01-12 Perforation Treatment Performed - Bullet Perforation
1950-01-12 Perforation Treatment Performed - Cement Squeeze
1950-01-12 Well Mode changed to Drilled and Cased
1951-09-01 Perforation Treatment Performed - Acid Wash - No Pressure
1951-09-06 Drill Stem Test Performed
1951-09-07 Drill Stem Test Performed
1951-09-09 Drill Stem Test Performed
1951-09-11 Perforation Treatment Performed - Bullet Perforation
1953-08-14 Well Began Production
1953-08-14 Well Fluid changed to Gas
1953-08-14 Well Mode changed to Flowing
1955-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-08-04 Perforation Treatment Performed - Jet Perforation
1955-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-11-13 Well Fluid changed to Gas
1956-11-13 Well Mode changed to Suspended
1957-10-25 Perforation Treatment Performed - Cement Squeeze
1957-10-31 Perforation Treatment Performed - Jet Perforation
1957-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-11-20 Well Fluid changed to Gas
1957-11-20 Well Mode changed to Flowing
1978-12-15 Well Fluid changed to Gas
1978-12-15 Well Mode changed to Suspended
1980-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-06-12 Plug Back Performed
1980-06-19 Perforation Treatment Performed - Cement Squeeze
1980-06-19 Perforation Treatment Performed - Jet Perforation
1980-06-27 Perforation Treatment Performed - Jet Perforation
1980-08-13 Perforation Treatment Performed - Cement Squeeze
1980-08-14 Perforation Treatment Performed - Jet Perforation
1980-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-25 Plug Back Performed
1983-10-25 Well Fluid changed to Gas
1983-10-25 Well Log Performed
1983-10-25 Well Mode changed to Abandoned
1983-10-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-12-31 Open Hole/Barefoot Completion 1327.70 1329.50 0
1955-08-04 Packing Device Capped w/Cement 1104.30 1104.30 0
1955-08-04 Perforation 1089.70 1090.90 13
1955-08-04 Perforation 1096.10 1097.30 13
1955-08-06 Acid Treatment 1089.70 1097.30 0
1957-10-25 Cement Squeeze 1089.70 1097.30 0
1957-10-31 Perforation 1089.70 1090.90 13
1957-10-31 Perforation 1096.10 1097.30 13
1957-11-01 Acid Treatment 1089.70 1097.30 0
1980-06-12 Packing Device Capped w/Cement 1076.00 1076.00 0
1980-06-19 Perforation 868.70 869.00 13
1950-01-10 Cement Squeeze 1327.70 1329.50 0
1980-06-19 Cement Squeeze 868.70 869.00 0
1980-06-27 Perforation 866.50 867.50 7
1980-08-13 Cement Squeeze 866.50 867.50 0
1980-08-14 Perforation 857.00 858.00 7
1980-10-07 Acid Treatment 857.00 858.00 0
1980-10-14 Acid Treatment 857.00 858.00 0
1983-10-25 Packing Device Capped w/Cement 847.00 847.00 0
1950-01-11 Bullet Perforation 1112.50 1113.70 13
1950-01-12 Cement Squeeze 1112.50 1113.70 0
1950-01-12 Bullet Perforation 1106.40 1109.50 13
1951-09-01 Acid Wash 1106.40 1109.50 0
1951-09-11 Bullet Perforation 1088.70 1091.50 13
1951-09-11 Bullet Perforation 1095.80 1097.30 13
1951-09-11 Bullet Perforation 1098.20 1099.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8615 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8615 0.0 0.0 0.0
1974 8591 0.0 0.0 0.0
1975 8759 0.0 0.0 0.0
1976 4775 0.0 0.0 0.0
1977 240 0.0 0.0 0.0
1978 3120 0.0 0.0 0.0
1980 408 0.0 0.0 0.0

For data sources see[5]

References